Skip to content

City Of Arabia

Dubaiوادي الصفا 4Also known as Wadi Al Safa 4

FromAED 690kStudio flat

City Of Arabia has 1 finished building and 19 off-plan projects. Flats sold for a typical AED 1,130 per sq ft in 12 months, 17% below Dubai.

Price per sq ft
1,130AED
1-bed rent
65kAED a year
Gross yieldEstimate
7.1%Flats, every size
Buildings
135 finished-home sales
New homes due
15,51519 off-plan projects

About

DLD’s register lists 202 homes here, most of them 2-beds, then 1-beds. Of the 1 buildings with an opening year on record, 1 opened in 2019 or later. 99% of its flat sales in 12 months were off-plan.

  • Best for buying below dubai’s price
  • Best for rental income
  • Best for first homes
  • Watch out for no metro station

Prices

Price per sq ft

Typical price by size

Studio
AED 690k6 sales
1 bed
AED 727k14 sales
2 beds
AED 1.82M14 sales
3 beds
Not enough sales0 sales
4+ beds
Not enough sales0 sales

Against all of Dubai

  • Entry level here701AED/sq ft
  • City Of Arabia1,130AED/sq ft
  • Dubai1,362AED/sq ft
  • High end here1,409AED/sq ft

19th cheapest of 60 areas · finished flats, 12 months

Against next door

  • LiwanAED 851/sq ft25% cheaper

Rent

Rent by size

Studio
AED 50k/yr17 rents · yield 7.2%
1 bed
AED 65k/yr33 rents · yield 8.9%
2 beds
AED 94k/yr17 rents · yield 5.2%

The 49th priciest 1-bed rent of 121 areas. 67 new rent contracts were signed here in 12 months. Gross yields are an Estimate. Rent in every Dubai area

Buildings

Every building

1 building · lowest price first, those with 10 or more sales first
Every building in City Of Arabia with sales, Nov 2025 – Oct 2026
BuildingAED/sq ftSalesGross yield
Wadi Tower 712 8 8.7%

202 homes by size

1 building
  • 1 bed42%84 homes
  • 2 beds54%109 homes
  • 3 beds3%7 homes
  • 4 beds1%2 homes

Off-plan

Homes due
15,515
Projects
19
Past planned date
1

When the new homes are due

  • 2025212homes
  • 20278,104homes
  • 20284,851homes
  • 20291,267homes
  • No planned date1,081homes

Past planned date

Every project

19 projects, most sold first
Off-plan projects in City Of Arabia
ProjectHandoverBuiltHomesFromSales
Azizi Milan HeightsAzizi Q3 2028 0% 2,745 AED 600kStudio 812
Azizi Milan 20Azizi Q2 2027 0% 731 AED 578kStudio 354
Azizi Milan 30Azizi Q2 2027 0% 780 AED 588kStudio 342
DistriktMajid Al Futtaim Q3 2028 8% 532 AED 1.61M1 bed 335
Azizi Milan 55Azizi Q2 2027 0% 460 AED 583kStudio 224
Azizi Milan 51Azizi Q1 2027 0% 574 AED 590kStudio 196
California ResidencesGFH Q2 2028 2% 369 AED 1.15M1 bed 170
Azizi Milan 9Azizi Q2 2027 0% 1,168 AED 596kStudio 167
Laguna ResidenceOne Development Q4 2027 6% 1,628 AED 748kStudio 154
Capria WestMajid Al Futtaim Q2 2029 1% 714 AED 1.74M1 bed 136
Capria EastMajid Al Futtaim Q2 2029 1% 553 AED 1.73M1 bed 119
Azizi Milan 28Azizi Q2 2027 0% 610 AED 586kStudio 102
Azizi Milan 53Azizi Q2 2027 0% 301 AED 621kStudio 96
SerraMajid Al Futtaim No planned date 42% 535 AED 1.33M1 bed 85
California VillageGFH Q3 2025Past planned date 95% 212 AED 4.2M3 beds 30
CiliaMajid Al Futtaim No planned date 44% 546 AED 1.39M1 bed 23
LacinaMajid Al Futtaim Q4 2027 21% 324 AED 1.43M1 bed 5
Azizi Milan 18Azizi Q2 2027 0% 1,528 Not enough sales 1
Arancia Yards by BeyondPeninsula Elit Real Estate Development L.l.CS.o.c Q4 2028 0% 1,205 No sales No sales

Location

Drive times

  • Downtown Dubai34min
  • Dubai Airport (DXB)33min
  • Dubai Marina31min

By car. Kite Beach, the nearest beach, is 15.2 km away.

Rated schools

No rated schools within 5 km

Getting around

  • Global VillageGold Line · opens 20322.5 kmaway
  • MeydanEtihad Rail · planned8.7 kmaway
  • ONPASSIVERed Line13 kmaway
  • Al JaddafHigh-speed rail · planned16 kmaway
  • Dubai InternationalDXB19 kmaway

Getting to work

Travel times from City Of Arabia at 8am on a weekday, with Nol each month
ToCarMetro and busNol
DIFC32 min––
Dubai Media City29 min––
Downtown Dubai34 min––
Dubai International Airport (DXB)33 min––
Jebel Ali Free Zone29 min––
Dubai Internet City28 min––
Dubai Knowledge Park30 min––
Dubai Airport Free Zone33 min––
Dubai Healthcare City30 min––

See every trip in the app

Travel times © openrouteservice.org by HeiGIT, map data © OpenStreetMap contributors · Public transport timetables © RTA, Dubai open data

Questions

More questions about City Of Arabia

About AED 50k a year for a studio, AED 65k for a 1-bed and AED 94k for a 2-bed. The 49th priciest 1-bed rent of 121 areas. 67 new rent contracts were signed here in 12 months.

A studio sells for about AED 690k, a 1-bed sells for about AED 727k and a 2-bed sells for about AED 1.82M, the typical price paid in 12 months.

About 7.1% gross Estimate. 1-beds earn the most, 8.9% gross. 99% of flat sales here are off-plan.

No. Global Village station on the Gold Line is planned to open in Sep 2032.

32 min by car at 8am on a weekday.

15,515 homes in 19 off-plan projects, 1 project past its planned date.

DLD and Dubai Municipality call it Wadi Al Safa 4 (وادي الصفا 4). Title deeds and rent contracts use that name.

More nearby

How the numbers work

FromAED 690kSee it on the map