Skip to content

Al Waleed w.s 1

Dubai Land Residence ComplexAl Waleed

Al Waleed w.s 1 is an off-plan project by Al Waleed in Dubai Land Residence Complex, with 151 homes on 12 floors. DLD’s last inspection, on 26 Oct 2026, found it 18% built.

Built
18%
Handover
Q1 2027
Sales in 12 months
2
Homes
151

Progress

18%built
  1. Q2 2025Building started
  2. Oct 2026Last inspection · 18%
  3. Q1 2027Planned handover

Prices

Typical price by size

Typical price by size · Nov 2025 – Oct 2026
SizeTypical priceAED/sq ftSales
StudioNot enough sales1
2 bedsNot enough sales1

Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales

  • Lowest810AED/sq ft
  • Al Waleed w.s 11,304AED/sq ft
  • Typical1,386AED/sq ft
  • Highest1,737AED/sq ft

Latest sales

Newest first
2 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Jul 2026 · 1 sale
14 Jul 20262 beds1,2771,110AED 1.42M
Feb 2026 · 1 sale
6 Feb 2026Studio4211,499AED 631k

Homes

151 homes by size

  • Studio15%22 homes · 412–417 sq ft · 2 layouts
  • 1 bed55%83 homes · 704–1,106 sq ft · 11 layouts
  • 2 beds30%46 homes · 1,162–1,547 sq ft · 5 layouts

Location

Drive times

  • Downtown Dubai28min
  • Dubai Airport (DXB)29min
  • Dubai Marina38min

By car. Jumeirah Open Beach, the nearest beach, is 19.6 km away.

Rated schools

  • GEMS Wellington Academy -FzeUK · Very good3.6 kmaway

Getting around

  • Academic CityBlue Line · opens 20293.1 kmaway
  • MeydanEtihad Rail · planned12 kmaway
  • CreekGreen Line16 kmaway
  • Al JaddafHigh-speed rail · planned16 kmaway
  • Dubai InternationalDXB19 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%

Developer

  • 1 finished
  • 1 being built, on time
Escrow bank
Emirates NBD Bank
Legal name
AL Waleed Development L.L.C

More by Al Waleed

Al Waleed’s other projects
ProjectHandoverBuilt
AL Waleed Garden 2Sama Al JadafNot on recordFinished
All 2 Al Waleed projects
Questions

More questions about Al Waleed w.s 1

Q1 2027, the planned date in DLD’s register.

It is not past its planned date. It was 18% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 months.

151 homes on 12 floors: 22 studios of 412–417 sq ft, 83 1-bed flats of 704–1,106 sq ft and 46 2-bed flats of 1,162–1,547 sq ft.

About AED 40k a year for a studio, AED 56k for a 1-bed and AED 73k for a 2-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.

Of Al Waleed’s 2 projects on DLD’s record, 1 are finished. Of the 1 being built, none is past its planned date.

In Dubai Land Residence Complex, 28 minutes by car to Downtown Dubai and 29 to Dubai Airport (DXB). Creek Metro station on the Green Line is 16 km away.

More nearby

How the numbers work