Allegro Residences
Dubai IslandsMill Hill Riviera
Allegro Residences is an off-plan project by Mill Hill Riviera in Dubai Islands, with 60 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 84% built.
- Built
- 84%
- Handover
- Q2 2026
- Sales in 12 months
- 5
- Homes
- 60
About
Allegro Residences is an 8-floor building of 60 homes on the waterfront in Dubai Islands. Homes are split evenly between 1-bed and 2-bed flats, with a few 3-bed flats, each with a private balcony, open-plan layout and smart systems. Shared spaces include a rooftop infinity pool, a lap pool on the podium and a cinema room.
- Rooftop infinity pool
- Private balconies
- Cinema and co-working rooms
Shared facilities
- Rooftop infinity pool
- Podium lap pool
- Gym
- Entertainment room
- Cinema room
- Co-working space
- Kids’ play area
- Kids’ splash pool
Progress
- Q4 2024Building started
- Feb–Apr 2025Launch sales · 38
- Q2 2026Planned handover · passed
- Oct 2026Last inspection · 84%
- Q4 2026Developer’s date
Prices
Price per sq ft
Typical price by size
- 1 bed
- Not enough sales1 sale
- 2 beds
- Not enough sales2 sales
- 3 beds
- Not enough sales2 sales
Against 71 Dubai Islands off-plan projects with 10 or more sales
- Lowest848AED/sq ft
- Typical2,299AED/sq ft
- Allegro Residences2,345AED/sq ft
- Highest4,153AED/sq ft
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Jun 2026 · 2 sales | ||||
| 2 Jun 2026 | 3 beds | 2,145 | 2,346 | AED 5.03M |
| 2 Jun 2026 | 3 beds | 2,149 | 2,345 | AED 5.04M |
| Mar 2026 · 1 sale | ||||
| 10 Mar 2026 | 2 beds | 1,322 | 2,298 | AED 3.04M |
| Feb 2026 · 1 sale | ||||
| 10 Feb 2026 | 2 beds | 1,323 | 2,401 | AED 3.18M |
| Nov 2025 · 1 sale | ||||
| 21 Nov 2025 | 1 bed | 773 | 2,038 | AED 1.58M |
Homes
60 homes by size
- 1 bed47%28 homes · 773–814 sq ft · 2 layouts
- 2 beds47%28 homes · 1,322 sq ft · 1 layout
- 3 beds7%4 homes · 2,105–2,145 sq ft · 2 layouts
Location
Drive times
Dubai Islands Beach, the nearest beach, is 1.5 km away.
Rated schools
- New Academy SchoolAmerican · Good4.4 kmaway
- ELITE ENGLISH SCHOOLIndian · Acceptable4.6 kmaway
Getting around
- Gold SouqGreen Line27 minwalk
- Dubai InternationalDXB8.1 kmaway
- Al JaddafHigh-speed rail · planned8.2 kmaway
- MeydanEtihad Rail · planned15 kmaway
Developer
- 1 being built, on time
- 1 past their planned date
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Mill Hill Riviera Development L.L.C
Also being built by Mill Hill Riviera
| Project | Handover | Built |
|---|---|---|
| Allegro Park by Mill Hill Riviera DevelopmentDubai Islands | Q2 2027Being built | 4% |
More questions about Allegro Residences
Q2 2026, the planned date in DLD’s register.
No. It is 5 months past its planned date, and was 84% built at DLD’s last inspection on 26 Oct 2026.
60 homes on 8 floors: 28 1-bed flats of 773–814 sq ft, 28 2-bed flats of 1,322 sq ft and 4 3-bed flats of 2,105–2,145 sq ft.
About AED 110k a year for a 1-bed and AED 118k for a 2-bed in Dubai Islands, a gross yield of about 3.4% Estimate.
Of Mill Hill Riviera’s 2 projects on DLD’s record, 0 are finished. Of the 2 being built, 1 is past its planned date.
In Dubai Islands. Gold Souq Metro station on the Green Line is a 27-minute walk.
More nearby
Off-plan nearby
- Haven Bay ResidencesFrom AED 2.33M83% built · Past planned date
- Beach Walk Residences 4 by ImtiazFrom AED 2.58M43% built · Planned Q2 2027
- Blue Marina Residence by Shakirov DevelopmentsFrom AED 1.92M13% built · Planned Q4 2027
- Cotier House 2 by ImtiazFrom AED 2.27M16% built · Planned Q2 2027
- Cotier House 1 by ImtiazFrom AED 2.55M43% built · Planned Q1 2027
- Iluka ResidencesFrom AED 1.93M57% built · Past planned date