Skip to content

Ashton Park Residences The Second

Jumeirah Village CircleMirfa

FromAED 689kDeveloper’s price

Ashton Park Residences The Second is an off-plan project by Mirfa in Jumeirah Village Circle, with 194 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 70% built.

Built
70%
Handover
Q4 2025
Sales in 12 months
3
Homes
194

About

Ashton Park The Second is a 5-floor building of 194 homes in Jumeirah Village Circle, a follow-on to Ashton Park Residences. Two in three homes are studios, and the rest are 1-bed and 2-bed flats. Residents share a rooftop pool, a skate park and a tennis court, along with EV charging points.

  • Mostly studios
  • Rooftop pool
  • Skate park and tennis court

Shared facilities

  • Rooftop pool
  • Kids’ pool
  • Tennis court
  • Skate park
  • Sauna and steam
  • Outdoor gym
  • BBQ area
  • Games room

Progress

70%built
  1. Sep–Nov 2024Launch sales · 39
  2. Q4 2024Building started
  3. Q4 2025Planned handover · passed
  4. Oct 2026Last inspection · 70%
11 months past the planned date

Prices

Price per sq ft

Not enough sales

Typical price by size

Studio
Not enough sales1 sale
1 bed
Not enough sales1 sale
2 beds
Not enough sales1 sale

Against 99 JVC off-plan projects with 10 or more sales

  • Lowest825AED/sq ft
  • Typical1,497AED/sq ft
  • Ashton Park Residences The Second1,922AED/sq ft
  • Highest2,276AED/sq ft

Latest sales

Newest first
3 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 1 sale
22 Oct 20261 bed7391,488AED 1.1M
Dec 2025 · 1 sale
5 Dec 2025Studio3851,922AED 740k
Nov 2025 · 1 sale
27 Nov 20252 beds1,0812,081AED 2.25M

Homes

194 homes by size

  • Studio65%126 homes · 374–523 sq ft · 11 layouts
  • 1 bed26%50 homes · 706–1,086 sq ft · 9 layouts
  • 2 beds9%18 homes · 1,083–1,634 sq ft · 8 layouts

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)35min
  • Dubai Marina22min

By car. JBR Beach, the nearest beach, is 7.7 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding2.7 kmaway
  • Nord Anglia International SchoolUK · Outstanding2.8 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 203214 minwalk
  • Al YalayisEtihad Rail5.1 kmaway
  • Jumeirah Golf EstatesRed Line5.4 kmaway
  • Al Maktoum AirportHigh-speed rail · planned18 kmaway
  • Al Maktoum InternationalDWC18 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 2 being built, on time
  • 1 past their planned date
Escrow bank
Sharjah Islamic Bank
Legal name
Ashton Real Estate Development L.L.C

Also being built by Mirfa

Mirfa’s other projects
ProjectHandoverBuilt
Numa ReserveMajanQ4 2026Being built10%
STORIES BY MIRFADubai SouthQ1 2028Being built1%
All 3 Mirfa projects
Questions

More questions about Ashton Park Residences The Second

Q4 2025, the planned date in DLD’s register.

No. It is 11 months past its planned date, and was 70% built at DLD’s last inspection on 26 Oct 2026.

194 homes on 5 floors: 126 studios of 374–523 sq ft, 50 1-bed flats of 706–1,086 sq ft and 18 2-bed flats of 1,083–1,634 sq ft.

About AED 48k a year for a studio, AED 71k for a 1-bed and AED 100k for a 2-bed in JVC, a gross yield of about 7.3% Estimate.

Of Mirfa’s 3 projects on DLD’s record, 0 are finished. Of the 3 being built, 1 is past its planned date.

In Jumeirah Village Circle, 27 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 5.4 km away.

More nearby

How the numbers work

FromAED 689kSee it on the map