Skip to content

Aura Elite

Silicon OasisAura Infinite

FromAED 1.26M2 beds · 1,210 sq ft

Aura Elite is an off-plan project by Aura Infinite in Silicon Oasis, with 79 homes on 9 floors. DLD’s last inspection, on 26 Oct 2026, found it 44% built.

Built
44%
Handover
Q2 2026
Since launch
Down 1%2 beds price per sq ft
Homes
79

About

Aura Elite is a 9-floor building of 79 homes in Silicon Oasis, with shops on the ground floor. Over half the homes are 2-bed flats, with 3-bed flats and a few 1-bed flats, and some have a store room. Residents share a temperature-controlled pool, a gym and a recreation room.

  • Mostly 2-bed flats
  • Some flats with a store room
  • Shops on the ground floor

Shared facilities

  • Temperature-controlled pool
  • Gym
  • Recreation room

Progress

44%built
  1. Q3 2024Building started
  2. May–Jul 2025Launch sales · 35
  3. Q2 2026Planned handover · passed
  4. Oct 2026Last inspection · 44%
  5. December 2026Developer’s date
5 months past the planned date

Prices

Price per sq ft

1,011 AED/sq ft17 sales in 12 months

Typical price by size

1 bed
Not enough sales2 sales
2 beds
AED 1.26M1,210 sq ft · 1,035 AED/sq ft · 10 sales
3 beds
AED 1.77M1,748 sq ft · 1,011 AED/sq ft · 5 sales

Against 9 Silicon Oasis off-plan projects with 10 or more sales

  • Aura Elite1,011AED/sq ft
  • Typical1,340AED/sq ft
  • Highest2,004AED/sq ft

Lowest of 9 · AED per sq ft in 12 months

Latest sales

Newest first
17 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 2 sales
2 Oct 20262 beds1,207950AED 1.15M
2 Oct 20262 beds1,108950AED 1.05M
Sep 2026 · 1 sale
17 Sep 20262 beds1,2101,157AED 1.4M
May 2026 · 3 sales
18 May 20262 beds1,2101,031AED 1.25M
13 May 20262 beds1,2111,000AED 1.21M
4 May 20263 beds1,7481,000AED 1.75M
Apr 2026 · 3 sales
17 Apr 20263 beds1,542973AED 1.5M
17 Apr 20261 bed7331,214AED 890k
16 Apr 20263 beds1,7481,011AED 1.77M
Mar 2026 · 2 sales
31 Mar 20263 beds1,7571,010AED 1.78M
9 Mar 20262 beds1,2281,189AED 1.46M
Jan 2026 · 2 sales
19 Jan 20262 beds1,2101,178AED 1.43M
16 Jan 20262 beds1,740818AED 1.42M
Nov 2025 · 4 sales
27 Nov 20251 bed7331,160AED 850k
19 Nov 20252 beds1,1081,100AED 1.22M
18 Nov 20252 beds1,2271,040AED 1.28M
6 Nov 20253 beds1,7521,011AED 1.77M

Homes

79 homes by size

  • 1 bed10%8 homes · 733 sq ft · 1 layout
  • 2 beds56%44 homes · 1,108–1,928 sq ft · 7 layouts
  • 3 beds34%27 homes · 1,533–2,271 sq ft · 3 layouts

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)28min
  • Dubai Marina35min

By car. Mercato Beach, the nearest beach, is 16.4 km away.

Rated schools

  • GEMS Wellington Academy -FzeUK · Very good1.4 kmaway
  • Repton SchoolUK/IB (Y 13) · Outstanding2.4 kmaway

Getting around

  • Dubai Silicon OasisBlue Line · opens 202922 minwalk
  • MeydanEtihad Rail · planned8.2 kmaway
  • CreekGreen Line11 kmaway
  • Al JaddafHigh-speed rail · planned12 kmaway
  • Dubai InternationalDXB14 kmaway
Area guideSilicon OasisFinished homesAED 1,189/sq ft1-bed rentAED 60k/yrGross yieldEstimate6.5%

Developer

  • 2 finished
  • 2 past their planned date
Escrow bank
Dubai Islamic Bank
Legal name
Aura Infinite Real Estate Development L.L.C

More by Aura Infinite

Aura Infinite’s other projects
ProjectHandoverBuilt
Aura PrestigeSilicon OasisQ4 2026Past planned date40%
Aura CentralArjanQ3 2027Finished
Aura EleganceSilicon OasisQ2 2025Finished
All 4 Aura Infinite projects
Questions

More questions about Aura Elite

From AED 1.26M for a 1,210 sq ft 2-bed, the lowest typical price paid in the 12 months. 3-bed flats sell for about AED 1.77M.

Q2 2026, the planned date in DLD’s register.

No. It is 5 months past its planned date, and was 44% built at DLD’s last inspection on 26 Oct 2026.

79 homes on 9 floors: 8 1-bed flats of 733 sq ft, 44 2-bed flats of 1,108–1,928 sq ft and 27 3-bed flats of 1,533–2,271 sq ft.

Down 1% for 2-bed flats, per sq ft. Against the launch sales of May 2025 – Jul 2025: 3-bed flats 0%.

About AED 60k a year for a 1-bed, AED 85k for a 2-bed and AED 120k for a 3-bed in Silicon Oasis, a gross yield of about 6.5% Estimate.

Of Aura Infinite’s 4 projects on DLD’s record, 2 are finished. Of the 2 being built, 2 are past their planned date.

In Silicon Oasis, 27 minutes by car to Downtown Dubai and 28 to Dubai Airport (DXB). Creek Metro station on the Green Line is 11 km away.

More nearby

How the numbers work

FromAED 1.26MSee it on the map