Best Town Villas
Jumeirah Village TriangleBest City
Best Town Villas is an off-plan project by Best City in Jumeirah Village Triangle, with 3 homes. DLD’s last inspection, on 22 Jun 2026, found it 76% built.
- Built
- 76%
- Handover
- Q1 2026
- Sales in 12 months
- No sales
- Homes
- 3
Progress
- Q3 2024Building started
- Q1 2026Planned handover · passed
- Jun 2026Last inspection · 76%
DLD updates % built after each inspection, so work on site can be further along than this figure.
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)35min
- Dubai Marina18min
By car. JBR Beach, the nearest beach, is 6.5 km away.
Rated schools
- EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good3.6 kmaway
- The Arbor SchoolUK · Good4.0 kmaway
Getting around
- Dubai Production CityGold Line · opens 203229 minwalk
- Al YalayisEtihad Rail2.2 kmaway
- Al FurjanRed Line2.3 kmaway
- Al Maktoum AirportHigh-speed rail · planned16 kmaway
- Al Maktoum InternationalDWC16 kmaway
Area guideJumeirah Village TriangleFinished homesAED 1,337/sq ft1-bed rentAED 72k/yrGross yieldEstimate7.5%Developer
- 1 past their planned date
- 1 not started
- Escrow bank
- Not on record
- Legal name
- Best City Real Estate Development L.L.C
More by Best City
| Project | Handover | Built |
|---|---|---|
| Best City View TowerJumeirah Village Triangle | Q2 2030Not started | 3% |
More questions about Best Town Villas
Q1 2026, the planned date in DLD’s register.
No. It is 8 months past its planned date, and was 76% built at DLD’s last inspection on 22 Jun 2026.
About AED 47k a year for a studio, AED 72k for a 1-bed, AED 95k for a 2-bed and AED 164k for a 3-bed in Jumeirah Village Triangle, a gross yield of about 7.5% Estimate.
Of Best City’s 2 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.
In Jumeirah Village Triangle, 27 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Al Furjan Metro station on the Red Line is 2.3 km away.
More nearby
Off-plan nearby
- Vivid TowerFrom AED 712k12% built · Planned Q4 2026
- Binghatti Flare 01From AED 857k20% built · Planned Q3 2027
- Sol LevanteFrom AED 822k7% built · Planned Q3 2028
- Binghatti Flare 02From AED 862k18% built · Planned Q2 2027
- Elaris AxisFrom AED 1.21M4% built · Planned Q4 2028
- Silver StallionsNo sales12% built · Past planned date
Finished buildings nearby
Typical next door AED 1,133/sq ft · 6 buildings within a 10-minute walk
- Maya Residences 51,388AED/sq ft1-bed rent AED 76k/yr · 10-minute walk
- La Residence1,091AED/sq ftNot enough rents · 10-minute walk
- 555 Park Views1,330AED/sq ft1-bed rent AED 88k/yr · 10-minute walk
- Al Jawhara Tower1,145AED/sq ftNot enough rents · 10-minute walk
- Park One1,121AED/sq ft1-bed rent AED 68k/yr · 10-minute walk
- Plazzo Residence879AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr
- Imperial Residence1,005AED/sq ft1-bed rent AED 60k/yr
- Milestone Residences1,446AED/sq ft1-bed rent AED 87k/yr
- Al Manarah Tower1,044AED/sq ft1-bed rent AED 58k/yr