Skip to content

Boulevard Living 1

Al FurjanWasl

Boulevard Living 1 is an off-plan project by Wasl in Al Furjan, with 195 homes on 8 floors. DLD’s last inspection, on 27 Apr 2026, found it 0% built.

Built
0%
Handover
Q4 2029
Sales in 12 months
No sales
Homes
195

Progress

0%built
  1. Apr 2026Last inspection · 0%
  2. Q4 2026Building started
  3. Q4 2029Planned handover

DLD updates % built after each inspection, so work on site can be further along than this figure.

Homes

195 homes by size

  • 1 bed42%80 homes · 839–994 sq ft · 5 layouts
  • 2 beds42%80 homes · 1,296–1,576 sq ft · 6 layouts
  • 3 beds17%32 homes · 1,893–1,984 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai28min
  • Dubai Airport (DXB)41min
  • Dubai Marina14min

By car. JBR Beach, the nearest beach, is 6.9 km away.

Rated schools

  • The Winchester School - DUBAIUK · Very good2.4 kmaway
  • Delhi Private SchoolIndian · Very good2.4 kmaway

Getting around

  • EnergyRed Line6 minwalk
  • Al YalayisEtihad Rail6.5 kmaway
  • Al Maktoum AirportHigh-speed rail · planned15 kmaway
  • Al Maktoum InternationalDWC15 kmaway
Area guideAl FurjanFinished homesAED 1,071/sq ft1-bed rentAED 67k/yrGross yieldEstimate8.1%

Developer

  • 5 finished
  • 22 being built, on time
Escrow bank
Not on record
Legal name
Jag Development L.L.C

Also being built by Wasl

Wasl’s other projects
ProjectHandoverBuilt
Park Views Residences BAl KifafQ1 2027Being built99%
South Garden AAl FurjanQ4 2027Being built16%
South Garden BAl FurjanQ4 2027Being built16%
South Garden CAl FurjanQ4 2027Being built16%
South Garden DAl FurjanQ2 2028Being built6%
All 27 Wasl projects
Questions

More questions about Boulevard Living 1

Q4 2029, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 27 Apr 2026, with handover planned in 3 years.

195 homes on 8 floors: 80 1-bed flats of 839–994 sq ft, 80 2-bed flats of 1,296–1,576 sq ft and 32 3-bed flats of 1,893–1,984 sq ft.

About AED 67k a year for a 1-bed, AED 93k for a 2-bed and AED 135k for a 3-bed in Al Furjan, a gross yield of about 8.1% Estimate.

Of Wasl’s 27 projects on DLD’s record, 5 are finished. Of the 22 being built, none is past its planned date.

In Al Furjan, 28 minutes by car to Downtown Dubai and 41 to Dubai Airport (DXB). Energy Metro station on the Red Line is a 6-minute walk.

More nearby

How the numbers work