Boulevard Living 1
Al FurjanWasl
Boulevard Living 1 is an off-plan project by Wasl in Al Furjan, with 195 homes on 8 floors. DLD’s last inspection, on 27 Apr 2026, found it 0% built.
- Built
- 0%
- Handover
- Q4 2029
- Sales in 12 months
- No sales
- Homes
- 195
Progress
- Apr 2026Last inspection · 0%
- Q4 2026Building started
- Q4 2029Planned handover
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
195 homes by size
- 1 bed42%80 homes · 839–994 sq ft · 5 layouts
- 2 beds42%80 homes · 1,296–1,576 sq ft · 6 layouts
- 3 beds17%32 homes · 1,893–1,984 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai28min
- Dubai Airport (DXB)41min
- Dubai Marina14min
By car. JBR Beach, the nearest beach, is 6.9 km away.
Rated schools
- The Winchester School - DUBAIUK · Very good2.4 kmaway
- Delhi Private SchoolIndian · Very good2.4 kmaway
Getting around
- EnergyRed Line6 minwalk
- Al YalayisEtihad Rail6.5 kmaway
- Al Maktoum AirportHigh-speed rail · planned15 kmaway
- Al Maktoum InternationalDWC15 kmaway
Area guideAl FurjanFinished homesAED 1,071/sq ft1-bed rentAED 67k/yrGross yieldEstimate8.1%Developer
- 5 finished
- 22 being built, on time
- Escrow bank
- Not on record
- Legal name
- Jag Development L.L.C
Also being built by Wasl
| Project | Handover | Built |
|---|---|---|
| Park Views Residences BAl Kifaf | Q1 2027Being built | 99% |
| South Garden AAl Furjan | Q4 2027Being built | 16% |
| South Garden BAl Furjan | Q4 2027Being built | 16% |
| South Garden CAl Furjan | Q4 2027Being built | 16% |
| South Garden DAl Furjan | Q2 2028Being built | 6% |
More questions about Boulevard Living 1
Q4 2029, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 27 Apr 2026, with handover planned in 3 years.
195 homes on 8 floors: 80 1-bed flats of 839–994 sq ft, 80 2-bed flats of 1,296–1,576 sq ft and 32 3-bed flats of 1,893–1,984 sq ft.
About AED 67k a year for a 1-bed, AED 93k for a 2-bed and AED 135k for a 3-bed in Al Furjan, a gross yield of about 8.1% Estimate.
Of Wasl’s 27 projects on DLD’s record, 5 are finished. Of the 22 being built, none is past its planned date.
In Al Furjan, 28 minutes by car to Downtown Dubai and 41 to Dubai Airport (DXB). Energy Metro station on the Red Line is a 6-minute walk.
More nearby
Off-plan nearby
- South Garden DFrom AED 691k6% built · Planned Q2 2028
- Boulevard Living 2No sales0% built · Planned Q4 2029
- South Garden EFrom AED 649k8% built · Planned Q2 2028
- Boulevard Park 1From AED 981k0% built · Planned Q2 2030
- Boulevard Park 2From AED 944k0% built · Planned Q4 2029
- Hills View at Wasl GateFrom AED 675k9% built · Planned Q2 2028
Finished buildings nearby
Typical next door AED 1,472/sq ft · 1 building within a 10-minute walk
