Enara by Omniyat

Business BayOmniyat

Enara by Omniyat is an off-plan project by Omniyat in Business Bay, with 41 homes on 28 floors. DLD’s last inspection, on 26 Oct 2026, found it 7% built.

Built
7%
Handover
Q4 2027
Sales in 12 months
No sales
Homes
41

About

Enara is a 28-floor office building in Business Bay, on the water at Marasi Bay beside The Lana hotel. Its offices are sold shell and core, with floor-to-ceiling windows and landscaped terraces. Owners and tenants join a private members’ club with a spa and lap pool, fine dining and a landscaped sky deck.

  • Offices, no homes
  • Private members’ club
  • On Marasi Bay

Shared facilities

  • Private members’ club
  • Spa with lap pool
  • Fitness centre
  • Fine dining
  • Landscaped sky deck
  • Business and conference suite
  • Landscaped terraces

Progress

7%built
  1. Q4 2024Building started
  2. Oct 2026Last inspection · 7%
  3. Q4 2027Planned handover
  4. Q3 2028Developer’s date

Location

Drive times

  • Downtown Dubai10min
  • Dubai Airport (DXB)23min
  • Dubai Marina26min

By car. Mercato Beach, the nearest beach, is 4.7 km away.

Rated schools

  • Hartland International School - FZUK · Very good2.2 kmaway
  • JSS Private SchoolIndian · Very good3.5 kmaway

Getting around

  • Burj Khalifa RoadGold Line · opens 203226 minwalk
  • Burj Khalifa / Dubai MallRed Line2.1 kmaway
  • MeydanEtihad Rail · planned4.1 kmaway
  • Al JaddafHigh-speed rail · planned5.9 kmaway
  • Dubai InternationalDXB10 kmaway
Area guideBusiness BayFinished homesAED 1,866/sq ft1-bed rentAED 90k/yrGross yieldEstimate6.5%

Developer

  • 4 finished
  • 8 being built, on time
  • 1 past their planned date
Escrow bank
Mashreq Bank
Legal name
Forty Two Downtown Real Estate Developments L.L.C

Also being built by Omniyat

Omniyat’s other projects
ProjectHandoverBuilt
Ava AT Palm Jumeirah BY OmniyatPalm JumeirahQ4 2025Past planned date96%
Orla BY OmniyatPalm JumeirahQ4 2026Being built70%
Vela Viento by OmniyatBusiness BayQ2 2027Being built22%
The Alba Residences by OmniyatPalm JumeirahQ1 2028Being built8%
Lumena by OmniyatBusiness BayQ4 2029Being built0%
All 13 Omniyat projects
Questions

More questions about Enara by Omniyat

Q4 2027, the planned date in DLD’s register.

It is not past its planned date. It was 7% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.

About AED 65k a year for a studio, AED 90k for a 1-bed, AED 135k for a 2-bed, AED 185k for a 3-bed and AED 328k for a 4+ bed in Business Bay, a gross yield of about 6.5% Estimate.

Of Omniyat’s 13 projects on DLD’s record, 4 are finished. Of the 9 being built, 1 is past its planned date.

In Business Bay, 10 minutes by car to Downtown Dubai and 23 to Dubai Airport (DXB). Burj Khalifa / Dubai Mall Metro station on the Red Line is 2.1 km away.