Skip to content

Eywa Dubai

Business BayR.Evolution

Eywa Dubai is an off-plan project by R.Evolution in Business Bay, with 53 homes on 18 floors. DLD’s last inspection, on 26 Oct 2026, found it 66% built.

Built
66%
Handover
Q2 2026
Sales in 12 months
1
Homes
53

About

Home types

  • 2 beds
  • 3 beds
  • 4 beds
  • Duplex
  • Penthouse

Shared facilities

  • Infinity pool
  • Indoor pool
  • Plunge pool
  • Ice bath
  • Spa
  • Sauna
  • Hydroponic farm
  • Yoga hall
Open brochure

Progress

66%built
  1. Q4 2023Building started
  2. Feb–Apr 2024Launch sales · 4
  3. Q2 2026Planned handover · passed
  4. Oct 2026Last inspection · 66%
5 months past the planned date

Prices

Price per sq ft

Not enough sales

Typical price by size

2 beds
Not enough sales1 sale

Against 31 Business Bay off-plan projects with 10 or more sales

  • Lowest1,536AED/sq ft
  • Typical2,766AED/sq ft
  • Eywa Dubai4,915AED/sq ft
  • Highest7,048AED/sq ft

Latest sales

Newest first
1 off-plan sale · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Apr 2026 · 1 sale
1 Apr 20262 beds3,5414,915AED 17.4M

Homes

53 homes by size

  • 2 beds36%19 homes · 2,939–3,969 sq ft · 11 layouts
  • 3 beds42%22 homes · 4,784–6,466 sq ft · 10 layouts
  • 4 beds11%6 homes · 6,163–6,607 sq ft · 4 layouts
  • 5 beds11%6 homes · 8,830–15,834 sq ft · 5 layouts

Location

Drive times

  • Downtown Dubai13min
  • Dubai Airport (DXB)24min
  • Dubai Marina25min

By car. Mercato Beach, the nearest beach, is 4.5 km away.

Rated schools

  • JSS Private SchoolIndian · Very good2.3 kmaway
  • Jumeirah English Speaking SchoolUK · Outstanding3.1 kmaway

Getting around

  • Burj Khalifa RoadGold Line · opens 203223 minwalk
  • Business BayRed Line26 minwalk
  • MeydanEtihad Rail · planned4.1 kmaway
  • Al JaddafHigh-speed rail · planned7.6 kmaway
  • Dubai InternationalDXB12 kmaway
Area guideBusiness BayFinished homesAED 1,866/sq ft1-bed rentAED 90k/yrGross yieldEstimate6.5%

Developer

  • 1 being built, on time
  • 1 past their planned date
Escrow bank
Emirates NBD Bank
Legal name
Rvl Real Estate L.L.C

Also being built by R.Evolution

R.Evolution’s other projects
ProjectHandoverBuilt
Eywa The Way Of WaterBusiness BayQ4 2028Being built0%
All 2 R.Evolution projects
Questions

More questions about Eywa Dubai

Q2 2026, the planned date in DLD’s register.

No. It is 5 months past its planned date, and was 66% built at DLD’s last inspection on 26 Oct 2026.

53 homes on 18 floors: 19 2-bed flats of 2,939–3,969 sq ft, 22 3-bed flats of 4,784–6,466 sq ft, 6 4+ bed flats of 6,163–6,607 sq ft and 6 4+ bed flats of 8,830–15,834 sq ft.

About AED 135k a year for a 2-bed, AED 185k for a 3-bed and AED 328k for a 4+ bed in Business Bay, a gross yield of about 6.5% Estimate.

Of R.Evolution’s 2 projects on DLD’s record, 0 are finished. Of the 2 being built, 1 is past its planned date.

In Business Bay, 13 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Business Bay Metro station on the Red Line is a 26-minute walk.

More nearby

How the numbers work