
Golf Terrace Residences by Asak
Dubai Production CityASAK
Golf Terrace Residences by Asak is an off-plan project by ASAK in Dubai Production City, with 105 homes on 7 floors. DLD’s last inspection, on 26 Oct 2026, found it 5% built.
- Built
- 5%
- Handover
- Q4 2027
- Sales in 12 months
- 91
- Homes
- 105
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 5%
- Q4 2027Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 710k479 sq ft · 1,496 AED/sq ft · 53 sales
- 1 bed
- AED 1.25M1,174 sq ft · 1,240 AED/sq ft · 34 sales
- 2 beds
- AED 2.11M1,713 sq ft · 1,227 AED/sq ft · 4 sales
Against 20 Dubai Production City off-plan projects with 10 or more sales
- Lowest1,165AED/sq ft
- Golf Terrace Residences by Asak1,433AED/sq ft
- Typical1,445AED/sq ft
- Highest1,650AED/sq ft
10th lowest of 20 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Oct 2026 · 2 sales | ||||
| 5 Oct 2026 | 1 bed | 1,191 | 1,244 | AED 1.48M |
| 5 Oct 2026 | Studio | 484 | 1,550 | AED 750k |
| Sep 2026 · 3 sales | ||||
| 18 Sep 2026 | Studio | 484 | 1,413 | AED 684k |
| 18 Sep 2026 | Studio | 556 | 1,261 | AED 701k |
| 18 Sep 2026 | 1 bed | 1,191 | 1,175 | AED 1.4M |
| Aug 2026 · 1 sale | ||||
| 21 Aug 2026 | Studio | 484 | 1,345 | AED 651k |
| Jul 2026 · 8 sales | ||||
| 27 Jul 2026 | Studio | 443 | 1,673 | AED 741k |
| 27 Jul 2026 | 1 bed | 1,211 | 895 | AED 1.08M |
| 20 Jul 2026 | Studio | 495 | 1,414 | AED 700k |
| 17 Jul 2026 | Studio | 484 | 1,342 | AED 649k |
| 17 Jul 2026 | Studio | 495 | 1,451 | AED 718k |
| 16 Jul 2026 | 1 bed | 868 | 1,152 | AED 1M |
| 15 Jul 2026 | Studio | 484 | 1,387 | AED 671k |
| 13 Jul 2026 | Studio | 481 | 1,387 | AED 667k |
| Jun 2026 · 2 sales | ||||
| 15 Jun 2026 | 1 bed | 1,161 | 1,162 | AED 1.35M |
| 11 Jun 2026 | 1 bed | 643 | 1,343 | AED 863k |
| May 2026 · 5 sales | ||||
| 26 May 2026 | 1 bed | 868 | 1,291 | AED 1.12M |
| 18 May 2026 | Studio | 476 | 1,372 | AED 653k |
| 11 May 2026 | Studio | 479 | 1,443 | AED 691k |
| 11 May 2026 | Studio | 496 | 1,368 | AED 679k |
| 5 May 2026 | 2 beds | 1,805 | 1,141 | AED 2.06M |
| Apr 2026 · 9 sales | ||||
| 24 Apr 2026 | Studio | 476 | 1,433 | AED 682k |
| 24 Apr 2026 | Studio | 481 | 1,524 | AED 733k |
| 21 Apr 2026 | 2 beds | 1,713 | 1,189 | AED 2.04M |
| 6 Apr 2026 | Studio | 495 | 1,554 | AED 769k |
| 6 Apr 2026 | Studio | 495 | 1,604 | AED 794k |
| 3 Apr 2026 | 1 bed | 1,191 | 1,169 | AED 1.39M |
| 1 Apr 2026 | Studio | 479 | 1,499 | AED 718k |
| 1 Apr 2026 | 1 bed | 1,060 | 1,164 | AED 1.23M |
| 1 Apr 2026 | 1 bed | 643 | 1,507 | AED 969k |
| Mar 2026 · 61 sales | ||||
| 26 Mar 2026 | Studio | 481 | 1,507 | AED 725k |
| 26 Mar 2026 | 1 bed | 1,187 | 1,171 | AED 1.39M |
| 24 Mar 2026 | Studio | 479 | 1,468 | AED 703k |
| 24 Mar 2026 | Studio | 479 | 1,489 | AED 713k |
| 24 Mar 2026 | 1 bed | 1,211 | 1,036 | AED 1.25M |
| 19 Mar 2026 | 2 beds | 1,713 | 1,270 | AED 2.18M |
| 19 Mar 2026 | Studio | 443 | 1,605 | AED 711k |
| 19 Mar 2026 | 1 bed | 1,211 | 998 | AED 1.21M |
| 19 Mar 2026 | Studio | 481 | 1,501 | AED 722k |
| 19 Mar 2026 | 1 bed | 1,161 | 1,287 | AED 1.49M |
| 19 Mar 2026 | Studio | 423 | 1,700 | AED 719k |
| 19 Mar 2026 | Studio | 423 | 1,686 | AED 713k |
| 19 Mar 2026 | Studio | 479 | 1,505 | AED 721k |
| 18 Mar 2026 | Studio | 476 | 1,406 | AED 669k |
| 18 Mar 2026 | 1 bed | 868 | 1,297 | AED 1.13M |
| 18 Mar 2026 | 1 bed | 1,187 | 1,243 | AED 1.48M |
| 18 Mar 2026 | Studio | 443 | 1,598 | AED 708k |
| 18 Mar 2026 | 1 bed | 1,161 | 1,282 | AED 1.49M |
| 18 Mar 2026 | Studio | 479 | 1,495 | AED 716k |
| 18 Mar 2026 | 1 bed | 1,161 | 1,276 | AED 1.48M |
Homes
105 homes by size
- Studio54%57 homes · 423–647 sq ft · 11 layouts
- 1 bed38%40 homes · 643–1,889 sq ft · 8 layouts
- 2 beds8%8 homes · 1,405–1,805 sq ft · 3 layouts
Golden Visa
10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.Qualifying homes fromAED 2.17MLocation
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)36min
- Dubai Marina19min
By car. JBR Beach, the nearest beach, is 8.7 km away.
Rated schools
- Victory Heights Primary SchoolUK · Outstanding3.0 kmaway
- Dwight SchoolInternational Baccalaureate · Good3.6 kmaway
Getting around
- Dubai Production CityGold Line · opens 203211 minwalk
- Al YalayisEtihad Rail2.9 kmaway
- Jumeirah Golf EstatesRed Line3.3 kmaway
- Al Maktoum AirportHigh-speed rail · planned15 kmaway
- Al Maktoum InternationalDWC15 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%Developer
- 1 finished
- 1 being built, on time
- 1 not started
- Escrow bank
- Not on record
- Legal name
- Asak Real Estate Development L.L.C
More by ASAK
| Project | Handover | Built |
|---|---|---|
| VOLU BY ASAKArjan | Q3 2028Not started | 0% |
| AL Serh Residences 11 BY Asak Real Estate DevelopmentJVC | Q3 2025Finished |
More questions about Golf Terrace Residences by Asak
From AED 710k for a 479 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.25M and 2-bed flats sell for about AED 2.11M.
Q4 2027, the planned date in DLD’s register.
It is not past its planned date. It was 5% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.
105 homes on 7 floors: 57 studios of 423–647 sq ft, 40 1-bed flats of 643–1,889 sq ft and 8 2-bed flats of 1,405–1,805 sq ft.
About AED 40k a year for a studio, AED 63k for a 1-bed and AED 90k for a 2-bed in Dubai Production City, a gross yield of about 8.6% Estimate.
Of ASAK’s 3 projects on DLD’s record, 1 are finished. Of the 1 being built, none is past its planned date.
Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.17M.
In Dubai Production City, 27 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 3.3 km away.
More nearby
Off-plan nearby
- Sera Gardens by VisionFrom AED 655k0% built · Planned Q2 2028
- Golf Grove by RegentFrom AED 668k9% built · Planned Q1 2028
- Golf TerracesNo sales0% built · Planned Q4 2026
- Lawncrest by ZimayaFrom AED 616k0% built · Planned Q2 2029
- Eterna by GRIDNo salesPlanned Q1 2029
- Soul by visionFrom AED 622k77% built · Planned Q4 2026
Finished buildings nearby
Typical next door AED 1,268/sq ft · 4 buildings within a 10-minute walk
- Sun Point Dubai1,281AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Ikarus Tower897AED/sq ftNot enough rents · 10-minute walk
- Viera Residences1,406AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Myka Residence1,255AED/sq ft1-bed rent AED 80k/yr · 10-minute walk
- Lakeside1,043AED/sq ft1-bed rent AED 51k/yr
- Qasr Sabah I, II, III743AED/sq ft1-bed rent AED 45k/yr
- The Crescent832AED/sq ft1-bed rent AED 62k/yr
- Lago Vista827AED/sq ft1-bed rent AED 55k/yr