Skip to content

Greygate Residences by ADE

Jumeirah Village CircleADE

FromAED 694kStudio · 420 sq ft

Greygate Residences by ADE is an off-plan project by ADE in Jumeirah Village Circle, with 223 homes on 15 floors. DLD’s last inspection, on 26 Oct 2026, found it 6% built.

Built
6%
Handover
Q1 2028
Since launch
Up 11%Studio price per sq ft
Homes
223

About

Greygate Residences is a 15-floor building of 223 homes in Jumeirah Village Circle, with a few shops on the ground floor. Two in three homes are studios and the rest are 1-bed flats, with smart controls for lighting, climate and curtains. Residents share pools for adults and children, indoor and outdoor gyms and a sauna.

  • Two in three homes are studios
  • Smart home controls
  • Shops on the ground floor

Shared facilities

  • Adults’ pool
  • Kids’ pool
  • Indoor gym
  • Outdoor gym
  • Sauna
  • Gazebo seating
  • Outdoor seating
  • Kids’ play area

Progress

6%built
  1. Q4 2024Building started
  2. Feb–Apr 2025Launch sales · 21
  3. Oct 2026Last inspection · 6%
  4. Q1 2028Planned handover

Prices

Price per sq ft

1,401 AED/sq ft17 sales in 12 months

Typical price by size

Studio
AED 694k420 sq ft · 8 sales
1 bed
AED 1.12M801 sq ft · 9 sales

Against 99 JVC off-plan projects with 10 or more sales

  • Lowest825AED/sq ft
  • Greygate Residences by ADE1,401AED/sq ft
  • Typical1,497AED/sq ft
  • Highest2,276AED/sq ft

31st lowest of 99 · AED per sq ft in 12 months

Latest sales

Plus 2 newer sales, newest first
17 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
18 Nov 2026Studio New4291,431AED 614k
18 Nov 20261 bed New8841,236AED 1.09M
Apr 2026 · 1 sale
27 Apr 20261 bed1,0661,212AED 1.29M
Mar 2026 · 1 sale
16 Mar 20261 bed8011,399AED 1.12M
Feb 2026 · 2 sales
16 Feb 2026Studio4101,684AED 691k
10 Feb 20261 bed7721,374AED 1.06M
Dec 2025 · 4 sales
15 Dec 2025Studio4341,605AED 697k
15 Dec 2025Studio4131,677AED 693k
12 Dec 20251 bed1,0691,237AED 1.32M
12 Dec 20251 bed1,0681,227AED 1.31M
Nov 2025 · 9 sales
24 Nov 2025Studio4351,601AED 697k
24 Nov 2025Studio4341,603AED 696k
19 Nov 20251 bed7981,401AED 1.12M
19 Nov 20251 bed7981,390AED 1.11M
19 Nov 20251 bed7981,395AED 1.11M
18 Nov 2025Studio4261,633AED 696k
18 Nov 2025Studio4111,668AED 686k
18 Nov 2025Studio4131,672AED 691k
11 Nov 20251 bed8011,382AED 1.11M

Homes

223 homes by size

  • Studio67%149 homes · 343–684 sq ft · 15 layouts
  • 1 bed33%74 homes · 722–1,262 sq ft · 12 layouts

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)35min
  • Dubai Marina21min

By car. JBR Beach, the nearest beach, is 8.5 km away.

Rated schools

  • Nord Anglia International SchoolUK · Outstanding1.5 kmaway
  • JSS International SchoolIndian · Very good1.8 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 20328 minwalk
  • Dubai Internet CityRed Line6.2 kmaway
  • Al YalayisEtihad Rail6.5 kmaway
  • Al Maktoum AirportHigh-speed rail · planned19 kmaway
  • Al Maktoum InternationalDWC19 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 1 finished
  • 2 being built, on time
Escrow bank
First Abu Dhabi Bank
Legal name
A D E Properties L.L.C

More by ADE

ADE’s other projects
ProjectHandoverBuilt
BARARIGATE by ADEMajanQ4 2028Being built2%
DEANSGATE by ADEMajanNot on recordFinished
All 3 ADE projects
Questions

More questions about Greygate Residences by ADE

From AED 694k for a 420 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.12M.

Q1 2028, the planned date in DLD’s register.

It is not past its planned date. It was 6% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 16 months.

223 homes on 15 floors: 149 studios of 343–684 sq ft and 74 1-bed flats of 722–1,262 sq ft.

Up 2% for 1-bed flats, per sq ft. Against the launch sales of Feb 2025 – Apr 2025: studios up 11%.

About AED 48k a year for a studio and AED 71k for a 1-bed in JVC, a gross yield of about 7.3% Estimate.

Of ADE’s 3 projects on DLD’s record, 1 are finished. Of the 2 being built, none is past its planned date.

In Jumeirah Village Circle, 26 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Dubai Internet City Metro station on the Red Line is 6.2 km away.

More nearby

How the numbers work

FromAED 694kSee it on the map