Hammock Park
Al FurjanDivine One
Hammock Park is an off-plan project by Divine One in Al Furjan, with 252 homes on 9 floors. DLD’s last inspection, on 26 Oct 2026, found it 82% built.
- Built
- 82%
- Handover
- Not on record
- Sales in 12 months
- 7
- Payment plan
- 20/30/50
- Homes
- 252
About
Hammock Park is a 9-floor building of 252 homes in Al Furjan, part of Wasl Gate and styled on Miami Beach. Homes split almost evenly between studios, 1-bed and 2-bed flats, all sold fully furnished with German kitchens and private balconies. The ground floor holds a sandy lagoon, an outdoor beach cinema and a padel court.
- Sold fully furnished
- Sandy lagoon and beach cinema
- Top-floor gym and co-working
Shared facilities
- Pool
- Sandy lagoon
- Outdoor beach cinema
- Padel court
- Football pitch
- Mini golf
- Zen yoga garden
- Gym with sauna and steam
Progress
- Q1 2024Building started
- Jun–Aug 2024Launch sales · 8
- Oct 2026Last inspection · 82%
Prices
Price per sq ft
Typical price by size
- Studio
- Not enough sales1 sale
- 1 bed
- AED 1.1M755 sq ft · 1,491 AED/sq ft · 4 sales
- 2 beds
- Not enough sales2 sales
Against 44 Al Furjan off-plan projects with 10 or more sales
- Lowest1,167AED/sq ft
- Typical1,425AED/sq ft
- Hammock Park1,488AED/sq ft
- Highest3,227AED/sq ft
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Oct 2026 · 1 sale | ||||
| 14 Oct 2026 | 1 bed | 805 | 1,374 | AED 1.11M |
| Jul 2026 · 1 sale | ||||
| 10 Jul 2026 | 1 bed | 704 | 1,488 | AED 1.05M |
| Apr 2026 · 1 sale | ||||
| 16 Apr 2026 | 2 beds | 1,456 | 1,374 | AED 2M |
| Mar 2026 · 1 sale | ||||
| 25 Mar 2026 | Studio | 395 | 1,962 | AED 775k |
| Feb 2026 · 1 sale | ||||
| 17 Feb 2026 | 2 beds | 1,095 | 1,420 | AED 1.56M |
| Dec 2025 · 1 sale | ||||
| 17 Dec 2025 | 1 bed | 805 | 1,495 | AED 1.2M |
| Nov 2025 · 1 sale | ||||
| 20 Nov 2025 | 1 bed | 703 | 1,550 | AED 1.09M |
Homes
252 homes by size
- Studio32%81 homes · 394–885 sq ft · 11 layouts
- 1 bed36%90 homes · 644–977 sq ft · 11 layouts
- 2 beds32%81 homes · 993–1,456 sq ft · 6 layouts
Payment plan
Divine One’s project page- 20%On booking
- 30%During construction
- 50%On handover
Payments go to the project’s escrow account at Abu Dhabi Islamic Bank.
Location
Drive times
- Downtown Dubai30min
- Dubai Airport (DXB)40min
- Dubai Marina17min
By car. JBR Beach, the nearest beach, is 6.5 km away.
Rated schools
- The Winchester School - DUBAIUK · Very good1.8 kmaway
- Delhi Private SchoolIndian · Very good1.8 kmaway
Getting around
- EnergyRed Line20 minwalk
- Al YalayisEtihad Rail5.5 kmaway
- Al Maktoum AirportHigh-speed rail · planned15 kmaway
- Al Maktoum InternationalDWC15 kmaway
Area guideAl FurjanFinished homesAED 1,071/sq ft1-bed rentAED 67k/yrGross yieldEstimate8.1%Developer
Divine One
Divine One’s project page- 1 being built, on time
- Escrow bank
- Abu Dhabi Islamic Bank
- Legal name
- Divine Hills One Real Estate Development L.L.C
More questions about Hammock Park
From AED 1.1M for a 755 sq ft 1-bed, the lowest typical price paid in the 12 months.
20/30/50: 20% on booking, 30% during construction, 50% on handover. Payments go to the project’s escrow account at Abu Dhabi Islamic Bank.
252 homes on 9 floors: 81 studios of 394–885 sq ft, 90 1-bed flats of 644–977 sq ft and 81 2-bed flats of 993–1,456 sq ft.
About AED 46k a year for a studio, AED 67k for a 1-bed and AED 93k for a 2-bed in Al Furjan, a gross yield of about 8.1% Estimate.
Of Divine One’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.
In Al Furjan, 30 minutes by car to Downtown Dubai and 40 to Dubai Airport (DXB). Energy Metro station on the Red Line is a 20-minute walk.
More nearby
Off-plan nearby
- Hillside Residences 3From AED 1.31M13% built · Handover not on record
- Hillside Residences 2From AED 1.67M18% built · Handover not on record
- Hillside Residences 1From AED 1.01M26% built · Handover not on record
- Boulevard Park 2From AED 944k0% built · Planned Q4 2029
- Omya ResidencesFrom AED 642k0% built · Planned Q2 2028
- Bellavion by SunriseFrom AED 747k10% built · Planned Q4 2027
