Skip to content

La Crystal

Dubai IslandsAl Madar

La Crystal is an off-plan project by Al Madar in Dubai Islands, with 64 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q3 2028
Sales in 12 months
No sales
Homes
64

Progress

0%built
  1. Q4 2025Building started
  2. Oct 2026Last inspection · 0%
  3. Q3 2028Planned handover

Homes

64 homes by size

  • 1 bed30%19 homes · 641–1,131 sq ft · 14 layouts
  • 2 beds53%34 homes · 1,059–1,764 sq ft · 16 layouts
  • 3 beds14%9 homes · 1,421–3,361 sq ft · 6 layouts
  • 4 beds3%2 homes · 2,271–2,448 sq ft · 2 layouts

Location

Drive times

Dubai Islands Beach, the nearest beach, is 1.0 km away.

Rated schools

  • ELITE ENGLISH SCHOOLIndian · Acceptable3.5 kmaway
  • Sabari Indian SchoolIndian · Good3.6 kmaway

Getting around

  • Gold SouqGreen Line30 minwalk
  • Dubai InternationalDXB7.4 kmaway
  • Al JaddafHigh-speed rail · planned8.0 kmaway
  • MeydanEtihad Rail · planned15 kmaway
Area guideDubai IslandsFinished homesAED 2,253/sq ft1-bed rentAED 110k/yrGross yieldEstimate3.4%

Developer

Al Madar

  • 1 being built, on time
Escrow bank
Sharjah Islamic Bank
Legal name
AL Madar Properties L.L.C
Questions

More questions about La Crystal

Q3 2028, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 22 months.

64 homes on 8 floors: 19 1-bed flats of 641–1,131 sq ft, 34 2-bed flats of 1,059–1,764 sq ft, 9 3-bed flats of 1,421–3,361 sq ft and 2 4+ bed flats of 2,271–2,448 sq ft.

About AED 110k a year for a 1-bed and AED 118k for a 2-bed in Dubai Islands, a gross yield of about 3.4% Estimate.

Of Al Madar’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.

In Dubai Islands. Gold Souq Metro station on the Green Line is a 30-minute walk.

More nearby

How the numbers work