Skip to content

Levanto by ORO24

Jumeirah Village CircleORO24

FromAED 520kStudio · 364 sq ft

Levanto by ORO24 is an off-plan project by ORO24 in Jumeirah Village Circle, with 562 homes on 16 floors. DLD’s last inspection, on 26 Oct 2026, found it 66% built.

Built
66%
Handover
Q4 2025
Since launch
Up 8%Studio price per sq ft
Homes
562

About

Levanto is a 16-floor building of 562 homes in Jumeirah Village Circle, entered through a drive-in lobby. Most homes are studios and 1-bed flats, with some 2-bed and 3-bed flats and duplexes. Residents share a bowling alley, an indoor golf zone and a rooftop cinema.

  • Bowling alley and indoor golf
  • Rooftop cinema and family jacuzzi
  • Some duplexes

Shared facilities

  • Pool with cabanas
  • Kids’ pool and cinema
  • Bowling alley
  • Indoor golf zone
  • Rooftop cinema
  • Rooftop jacuzzi
  • Squash court
  • Business centre and library

Progress

66%built
  1. Q4 2022Building started
  2. Jan–Mar 2023Launch sales · 416
  3. Q4 2025Planned handover · passed
  4. Oct 2026Last inspection · 66%
11 months past the planned date

Prices

Price per sq ft

1,290 AED/sq ft16 sales in 12 months

Typical price by size

Studio
AED 520k364 sq ft · 5 sales
1 bed
AED 808k666 sq ft · 7 sales
2 beds
AED 1.28M979 sq ft · 4 sales

Against 99 JVC off-plan projects with 10 or more sales

  • Lowest825AED/sq ft
  • Levanto by ORO241,290AED/sq ft
  • Typical1,497AED/sq ft
  • Highest2,276AED/sq ft

12th lowest of 99 · AED per sq ft in 12 months

Latest sales

Plus 2 newer sales, newest first
16 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
16 Nov 2026Studio New3641,374AED 500k
11 Nov 20263 beds New1,2891,280AED 1.65M
Oct 2026 · 2 sales
20 Oct 20261 bed6661,213AED 808k
19 Oct 20261 bed6561,336AED 876k
Sep 2026 · 1 sale
21 Sep 20261 bed6831,245AED 850k
Jul 2026 · 2 sales
29 Jul 2026Studio3621,423AED 515k
1 Jul 20261 bed6661,209AED 805k
May 2026 · 1 sale
6 May 20261 bed6661,231AED 820k
Apr 2026 · 4 sales
21 Apr 20262 beds9791,244AED 1.22M
20 Apr 20262 beds9791,379AED 1.35M
16 Apr 20262 beds9791,213AED 1.19M
6 Apr 20261 bed6661,201AED 800k
Feb 2026 · 3 sales
16 Feb 20261 bed6661,149AED 765k
16 Feb 2026Studio3641,552AED 565k
2 Feb 2026Studio3641,401AED 510k
Jan 2026 · 2 sales
26 Jan 2026Studio3641,429AED 520k
22 Jan 2026Studio3641,786AED 650k
Nov 2025 · 1 sale
19 Nov 20252 beds9301,801AED 1.68M

Homes

562 homes by size

  • Studio39%220 homes · 345–481 sq ft · 6 layouts
  • 1 bed43%244 homes · 648–824 sq ft · 7 layouts
  • 2 beds13%72 homes · 889–1,722 sq ft · 6 layouts
  • 3 beds5%26 homes · 1,289–2,101 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)35min
  • Dubai Marina22min

By car.

Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 1 finished
  • 2 being built, on time
  • 2 past their planned date
Escrow bank
Mashreq Bank
Legal name
ORO24 Real Estate Development L.L.C

More by ORO24

ORO24’s other projects
ProjectHandoverBuilt
Elano BY ORO24ArjanQ4 2025Past planned date70%
Albero BY ORO24LiwanNot on recordBeing built45%
Kyoto BY ORO24ArjanNot on recordBeing built17%
Torino BY ORO24ArjanQ3 2024Finished
All 5 ORO24 projects
Questions

More questions about Levanto by ORO24

From AED 520k for a 364 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 808k and 2-bed flats sell for about AED 1.28M.

Q4 2025, the planned date in DLD’s register.

No. It is 11 months past its planned date, and was 66% built at DLD’s last inspection on 26 Oct 2026.

562 homes on 16 floors: 220 studios of 345–481 sq ft, 244 1-bed flats of 648–824 sq ft, 72 2-bed flats of 889–1,722 sq ft and 26 3-bed flats of 1,289–2,101 sq ft.

Down 1% for 1-bed flats, per sq ft. Against the launch sales of Jan 2023 – Mar 2023: studios up 8%, 2-bed flats up 7%.

About AED 48k a year for a studio, AED 71k for a 1-bed, AED 100k for a 2-bed and AED 143k for a 3-bed in JVC, a gross yield of about 7.3% Estimate.

Of ORO24’s 5 projects on DLD’s record, 1 are finished. Of the 4 being built, 2 are past their planned date.

In Jumeirah Village Circle, 27 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB).

More nearby

How the numbers work

FromAED 520kSee it on the map