Skip to content

Lime Light Twin Towers

Dubai Sports CityLimelight

Lime Light Twin Towers is an off-plan project by Limelight in Dubai Sports City, with 734 homes on 22 floors. DLD’s last inspection, on 26 Oct 2026, found it 71% built.

Built
71%
Handover
Q2 2026
Sales in 12 months
1
Homes
734

Progress

71%built
  1. Jan–Mar 2009Launch sales · 2
  2. Q1 2025Building started
  3. Q2 2026Planned handover · passed
  4. Oct 2026Last inspection · 71%
5 months past the planned date

Prices

Price per sq ft

Not enough sales

Typical price by size

Studio
Not enough sales1 sale
2 beds
Not enough sales1 sale

Against 15 Dubai Sports City off-plan projects with 10 or more sales

  • Lime Light Twin Towers660AED/sq ft
  • Lowest900AED/sq ft
  • Typical1,429AED/sq ft
  • Highest2,198AED/sq ft

Latest sales

Newest first
1 off-plan sale · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Sep 2026 · 1 sale
21 Sep 20262 beds1,449660AED 956k

Homes

734 homes by size

  • Studio45%332 homes · 450–827 sq ft · 25 layouts
  • 1 bed29%216 homes · 709–1,260 sq ft · 15 layouts
  • 2 beds21%154 homes · 1,049–1,570 sq ft · 12 layouts
  • 3 beds4%32 homes · 1,631–1,887 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai28min
  • Dubai Airport (DXB)35min
  • Dubai Marina23min

By car. JBR Beach, the nearest beach, is 9.6 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding0.9 kmaway
  • Dwight SchoolInternational Baccalaureate · Good1.4 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 203230 minwalk
  • Al YalayisEtihad Rail5.6 kmaway
  • Jumeirah Golf EstatesRed Line6.0 kmaway
  • Al Maktoum AirportHigh-speed rail · planned17 kmaway
  • Al Maktoum InternationalDWC17 kmaway
Area guideDubai Sports CityFinished homesAED 950/sq ft1-bed rentAED 60k/yrGross yieldEstimate8.5%

Developer

Limelight

  • 1 past their planned date
Escrow bank
Mashreq Bank
Legal name
Lime Light Real Estate Development L.L.C
Questions

More questions about Lime Light Twin Towers

Q2 2026, the planned date in DLD’s register.

No. It is 5 months past its planned date, and was 71% built at DLD’s last inspection on 26 Oct 2026.

734 homes on 22 floors: 332 studios of 450–827 sq ft, 216 1-bed flats of 709–1,260 sq ft, 154 2-bed flats of 1,049–1,570 sq ft and 32 3-bed flats of 1,631–1,887 sq ft.

About AED 42k a year for a studio, AED 60k for a 1-bed, AED 83k for a 2-bed and AED 110k for a 3-bed in Dubai Sports City, a gross yield of about 8.5% Estimate.

Of Limelight’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.

In Dubai Sports City, 28 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 6.0 km away.

More nearby

How the numbers work