Skip to content

Muraba Veil

Dubai Water CanalMuraba

FromAED 30.74M3 beds · 4,951 sq ft

Muraba Veil is an off-plan project by Muraba on Dubai Water Canal, with 131 homes on 56 floors. DLD’s last inspection, on 26 Oct 2026, found it 8% built.

Built
8%
Handover
Q4 2028
Sales in 12 months
17
Homes
131

About

Muraba Veil is a 56-floor building of 131 homes in Al Wasl, designed by the Pritzker Prize-winning architects RCR. Homes run from 2-bed to 5-bed flats, with doors opening onto water and greenery on every floor. Shared spaces include rooftop pools and restaurants, a majlis, and pools among palms at ground level.

  • Designed by RCR
  • Water and greenery on every floor
  • Rooftop pools and restaurants

Shared facilities

  • Rooftop pools
  • Rooftop restaurants
  • Majlis
  • Ground-level pools among palms
  • Underground wellness area

Progress

8%built
  1. Aug–Oct 2024Launch sales · 0
  2. Q4 2024Building started
  3. Oct 2026Last inspection · 8%
  4. Q4 2028Planned handover

Prices

Price per sq ft

4,193 AED/sq ft17 sales in 12 months

Typical price by size

2 beds
Not enough sales2 sales
3 beds
AED 30.74M4,951 sq ft · 6,210 AED/sq ft · 5 sales
4 beds
Not enough sales1 sale

Against 9 Al Wasl off-plan projects with 10 or more sales

  • Lowest2,232AED/sq ft
  • Typical3,410AED/sq ft
  • Muraba Veil4,193AED/sq ft
  • Highest4,443AED/sq ft

2nd highest of 9 · AED per sq ft in 12 months

Latest sales

Plus 1 newer sale, newest first
17 off-plan sales · Nov 2025 – Oct 2026, plus 1 newer sale · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
12 Nov 20263 beds New4,9525,293AED 26.21M
Sep 2026 · 2 sales
15 Sep 20263 beds4,9517,392AED 36.6M
4 Sep 20263 beds4,9516,380AED 31.59M
Jul 2026 · 1 sale
10 Jul 20263 beds4,9523,285AED 16.27M
Jun 2026 · 4 sales
22 Jun 20263 beds4,9516,210AED 30.74M
22 Jun 20262 beds3,8393,383AED 12.99M
22 Jun 20263 beds4,9523,463AED 17.15M
22 Jun 20262 beds3,8393,383AED 12.99M
May 2026 · 1 sale
6 May 20264+ beds9,9194,331AED 42.95M
Apr 2026 · 3 sales
27 Apr 20263 beds4,9393,789AED 18.72M
13 Apr 20262 beds3,8383,559AED 13.66M
13 Apr 20263 beds4,9406,161AED 30.43M
Feb 2026 · 1 sale
13 Feb 20262 beds3,8385,356AED 20.55M
Dec 2025 · 4 sales
25 Dec 20252 beds3,8384,193AED 16.09M
22 Dec 20253 beds4,9393,648AED 18.02M
15 Dec 20252 beds3,8384,334AED 16.63M
12 Dec 20253 beds4,9393,435AED 16.97M
Nov 2025 · 1 sale
24 Nov 20253 beds4,9394,214AED 20.81M

Homes

131 homes by size

  • 2 beds41%54 homes · 3,839 sq ft · 1 layout
  • 3 beds37%48 homes · 4,952–8,172 sq ft · 2 layouts
  • 4 beds21%28 homes · 9,919–15,356 sq ft · 3 layouts
  • 5 beds1%1 home · 26,667 sq ft · 1 layout

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 30.74M

Location

Drive times

  • Downtown Dubai13min
  • Dubai Airport (DXB)26min
  • Dubai Marina22min

By car. Jumeirah Open Beach, the nearest beach, is 3.0 km away.

Rated schools

  • JSS Private SchoolIndian · Very good0.6 kmaway
  • Jumeirah English Speaking SchoolUK · Outstanding1.3 kmaway

Getting around

  • Business BayRed Line14 minwalk
  • Burj Khalifa RoadGold Line · opens 20322.1 kmaway
  • MeydanEtihad Rail · planned6.0 kmaway
  • Al JaddafHigh-speed rail · planned9.1 kmaway
  • Dubai InternationalDXB13 kmaway
Area guideAl WaslFinished homesAED 2,850/sq ft1-bed rentAED 135k/yrGross yieldEstimate5.1%

Developer

  • 1 finished
  • 1 being built, on time
Escrow bank
Commercial Bank of Dubai
Legal name
Muraba Properties L.L.C

More by Muraba

Muraba’s other projects
ProjectHandoverBuilt
Muraba Residences Palm JumeriahPalm JumeirahQ1 2016Finished
All 2 Muraba projects
Questions

More questions about Muraba Veil

From AED 30.74M for a 4,951 sq ft 3-bed, the lowest typical price paid in the 12 months.

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 8% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.

131 homes on 56 floors: 54 2-bed flats of 3,839 sq ft, 48 3-bed flats of 4,952–8,172 sq ft, 28 4+ bed flats of 9,919–15,356 sq ft and 1 4+ bed of 26,667 sq ft.

About AED 218k a year for a 2-bed, AED 320k for a 3-bed and AED 482k for a 4+ bed in Al Wasl, a gross yield of about 5.1% Estimate.

Of Muraba’s 2 projects on DLD’s record, 1 are finished. Of the 1 being built, none is past its planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 30.74M.

In Dubai Water Canal, Al Wasl, 13 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). Business Bay Metro station on the Red Line is a 14-minute walk.

More nearby

How the numbers work

FromAED 30.74MSee it on the map