Skip to content

Nine Collective

Al KifafWasl

Nine Collective is an off-plan project by Wasl in Al Kifaf, with 215 homes on 41 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q2 2030
Sales in 12 months
No sales
Homes
215

Progress

0%built
  1. Q3 2026Building started
  2. Oct 2026Last inspection · 0%
  3. Q2 2030Planned handover

Homes

215 homes by size

  • 2 beds51%110 homes · 1,952–3,142 sq ft · 7 layouts
  • 3 beds27%57 homes · 3,095–4,275 sq ft · 4 layouts
  • 4 beds20%44 homes · 4,099–5,724 sq ft · 4 layouts
  • 5 beds2%4 homes · 5,533–8,183 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai13min
  • Dubai Airport (DXB)21min
  • Dubai Marina26min

By car. La Mer Beach, the nearest beach, is 3.5 km away.

Rated schools

  • New Academy SchoolAmerican · Good2.3 kmaway

Getting around

  • maxRed Line3 minwalk
  • Al SatwaGold Line · opens 203231 minwalk
  • Al JaddafHigh-speed rail · planned4.1 kmaway
  • Dubai InternationalDXB7.5 kmaway
  • MeydanEtihad Rail · planned8.3 kmaway
Area guideAl KifafFinished homesAED 1,934/sq ft1-bed rentAED 104k/yrGross yieldEstimate5.3%

Developer

  • 5 finished
  • 22 being built, on time
Escrow bank
Not on record
Legal name
Park 1 L.L.C

Also being built by Wasl

Wasl’s other projects
ProjectHandoverBuilt
Park Views Residences BAl KifafQ1 2027Being built99%
South Garden AAl FurjanQ4 2027Being built16%
South Garden BAl FurjanQ4 2027Being built16%
South Garden CAl FurjanQ4 2027Being built16%
South Garden DAl FurjanQ2 2028Being built6%
All 27 Wasl projects
Questions

More questions about Nine Collective

Q2 2030, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 years.

215 homes on 41 floors: 110 2-bed flats of 1,952–3,142 sq ft, 57 3-bed flats of 3,095–4,275 sq ft, 44 4+ bed flats of 4,099–5,724 sq ft and 4 4+ bed flats of 5,533–8,183 sq ft.

About AED 150k a year for a 2-bed, AED 220k for a 3-bed and AED 1.3M for a 4+ bed in Al Kifaf, a gross yield of about 5.3% Estimate.

Of Wasl’s 27 projects on DLD’s record, 5 are finished. Of the 22 being built, none is past its planned date.

In Al Kifaf, 13 minutes by car to Downtown Dubai and 21 to Dubai Airport (DXB). max Metro station on the Red Line is a 3-minute walk.

More nearby

How the numbers work