Nineteen Riviera Lagoon
MajanRiviera
Nineteen Riviera Lagoon is an off-plan project by Riviera in Majan, with 19 homes on 4 floors. DLD’s last inspection, on 26 Oct 2026, found it 34% built.
- Built
- 34%
- Handover
- Q1 2027
- Sales in 12 months
- No sales
- Homes
- 19
About
Nineteen Riviera Lagoon is a gated community of detached villas set by a lagoon. Each villa has an Italian show kitchen beside the main kitchen, its own pool and a plunge pool on the top-floor terrace. Residents share a park with a children’s play area, and cars are kept in underground parking with a washing bay.
- Detached villas by a lagoon
- Private pool and plunge pool
- Show kitchen and main kitchen
Shared facilities
- Private pool
- Rooftop plunge pool
- Sunken fire pit seating
- Community park
- Children’s play area
- Underground parking
- Car washing bay
Progress
- Q3 2024Building started
- Oct 2026Last inspection · 34%
- Q1 2027Planned handover
Location
Drive times
- Downtown Dubai30min
- Dubai Airport (DXB)27min
- Dubai Marina32min
By car. Jumeirah Open Beach, the nearest beach, is 13.6 km away.
Rated schools
- Repton SchoolUK/IB (Y 13) · Outstanding4.1 kmaway
- GEMS Wellington Academy -FzeUK · Very good4.6 kmaway
Getting around
- Nad Al ShebaGold Line · opens 20323.5 kmaway
- MeydanEtihad Rail · planned5.3 kmaway
- CreekGreen Line10 kmaway
- Al JaddafHigh-speed rail · planned11 kmaway
- Dubai InternationalDXB14 kmaway
Area guideMajanFinished homesAED 1,181/sq ft1-bed rentAED 65k/yrGross yieldEstimate6.6%Developer
- 2 finished
- 2 being built, on time
- 1 past their planned date
- Escrow bank
- United Bank Limited
- Legal name
- Riviera Properties Development
More by Riviera
| Project | Handover | Built |
|---|---|---|
| Lodge Residences by Riviera AzureJVC | Q1 2026Past planned date | 63% |
| Riviera ChaletJVC | Not on recordBeing built | 75% |
| LA Riviera AzureJVC | Q2 2022Finished | |
| La-Riviera ApartmentsJVC | Q3 2019Finished |
More questions about Nineteen Riviera Lagoon
Q1 2027, the planned date in DLD’s register.
It is not past its planned date. It was 34% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 months.
About AED 44k a year for a studio, AED 65k for a 1-bed, AED 90k for a 2-bed and AED 130k for a 3-bed in Majan, a gross yield of about 6.6% Estimate.
Of Riviera’s 5 projects on DLD’s record, 2 are finished. Of the 3 being built, 1 is past its planned date.
In Majan, 30 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 10 km away.
More nearby
Off-plan nearby
- The Lakeview Villas by EllingtonNo sales10% built · Past planned date
- Wadi Villas by AristaNo sales60% built · Planned Q4 2026
- Numa ReserveFrom AED 11.99M10% built · Planned Q4 2026
- Karl Lagerfeld Villas by TarafNo sales11% built · Handover not on record
- The Waterside Villas by EllingtonNo sales32% built · Past planned date
- Wellington Grand VillasFrom AED 19.48M62% built · Planned Q1 2028