Nineteen Riviera Lagoon is an off-plan project by Riviera in Majan, with 19 homes on 4 floors. DLD’s last inspection, on 26 Oct 2026, found it 34% built.

Built
34%
Handover
Q1 2027
Sales in 12 months
No sales
Homes
19

About

Nineteen Riviera Lagoon is a gated community of detached villas set by a lagoon. Each villa has an Italian show kitchen beside the main kitchen, its own pool and a plunge pool on the top-floor terrace. Residents share a park with a children’s play area, and cars are kept in underground parking with a washing bay.

  • Detached villas by a lagoon
  • Private pool and plunge pool
  • Show kitchen and main kitchen

Shared facilities

  • Private pool
  • Rooftop plunge pool
  • Sunken fire pit seating
  • Community park
  • Children’s play area
  • Underground parking
  • Car washing bay
Open brochure

Progress

34%built
  1. Q3 2024Building started
  2. Oct 2026Last inspection · 34%
  3. Q1 2027Planned handover

Location

Drive times

  • Downtown Dubai30min
  • Dubai Airport (DXB)27min
  • Dubai Marina32min

By car. Jumeirah Open Beach, the nearest beach, is 13.6 km away.

Rated schools

  • Repton SchoolUK/IB (Y 13) · Outstanding4.1 kmaway
  • GEMS Wellington Academy -FzeUK · Very good4.6 kmaway

Getting around

  • Nad Al ShebaGold Line · opens 20323.5 kmaway
  • MeydanEtihad Rail · planned5.3 kmaway
  • CreekGreen Line10 kmaway
  • Al JaddafHigh-speed rail · planned11 kmaway
  • Dubai InternationalDXB14 kmaway
Area guideMajanFinished homesAED 1,181/sq ft1-bed rentAED 65k/yrGross yieldEstimate6.6%

Developer

  • 2 finished
  • 2 being built, on time
  • 1 past their planned date
Escrow bank
United Bank Limited
Legal name
Riviera Properties Development

More by Riviera

Riviera’s other projects
ProjectHandoverBuilt
Lodge Residences by Riviera AzureJVCQ1 2026Past planned date63%
Riviera ChaletJVCNot on recordBeing built75%
LA Riviera AzureJVCQ2 2022Finished
La-Riviera ApartmentsJVCQ3 2019Finished
All 5 Riviera projects
Questions

More questions about Nineteen Riviera Lagoon

Q1 2027, the planned date in DLD’s register.

It is not past its planned date. It was 34% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 4 months.

About AED 44k a year for a studio, AED 65k for a 1-bed, AED 90k for a 2-bed and AED 130k for a 3-bed in Majan, a gross yield of about 6.6% Estimate.

Of Riviera’s 5 projects on DLD’s record, 2 are finished. Of the 3 being built, 1 is past its planned date.

In Majan, 30 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 10 km away.