Skip to content

Orvessa Residences by Michel Adam

Al FurjanBNW

FromAED 1.27MDeveloper’s price

Orvessa Residences by Michel Adam is an off-plan project by BNW in Al Furjan, with 91 homes on 13 floors. DLD’s last inspection, on 26 Oct 2026, found it 1% built.

Built
1%
Handover
Q2 2028
Sales in 12 months
1
Payment plan
10/40/50
Homes
91

About

Orvessa Residences is a 13-floor building of 91 homes in Al Furjan, with wave-shaped balconies and planting along its front. Most homes are 1-bed flats, with 2-bed and a few 3-bed flats, all with floor-to-ceiling windows. Residents share a rooftop pool, an open-air yoga platform and a co-working space, with a café in the building.

  • Rooftop pool
  • Wave-shaped balconies
  • Café and co-working space

Shared facilities

  • Rooftop pool
  • Pool deck
  • Outdoor yoga
  • Gym
  • Steam and sauna
  • Café
  • Co-working space
  • Kids’ pool

Progress

1%built
  1. Q2 2025Building started
  2. Oct 2026Last inspection · 1%
  3. Q2 2028Planned handover
  4. Q3 2028Developer’s date

Prices

Typical price by size

Typical price by size · Nov 2025 – Oct 2026
SizeTypical priceAED/sq ftSales
2 bedsNot enough sales1

Against 44 Al Furjan off-plan projects with 10 or more sales

  • Lowest1,167AED/sq ft
  • Orvessa Residences by Michel Adam1,258AED/sq ft
  • Typical1,425AED/sq ft
  • Highest3,227AED/sq ft

Latest sales

Newest first
1 off-plan sale · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Aug 2026 · 1 sale
28 Aug 20262 beds1,3571,258AED 1.71M

Homes

91 homes by size

  • 1 bed57%52 homes · 727–1,146 sq ft · 6 layouts
  • 2 beds33%30 homes · 1,357–1,582 sq ft · 6 layouts
  • 3 beds10%9 homes · 1,600 sq ft · 1 layout
  1. 10%On booking
  2. 40%During construction
  3. 50%On handover

Payments go to the project’s escrow account at Abu Dhabi Commercial Bank.

Location

Drive times

  • Downtown Dubai31min
  • Dubai Airport (DXB)40min
  • Dubai Marina17min

By car. JBR Beach, the nearest beach, is 6.6 km away.

Rated schools

  • The Arbor SchoolUK · Good0.4 kmaway
  • Delhi Private SchoolIndian · Very good2.7 kmaway

Getting around

  • Al FurjanRed Line25 minwalk
  • Al YalayisEtihad Rail2.8 kmaway
  • Al Maktoum AirportHigh-speed rail · planned14 kmaway
  • Al Maktoum InternationalDWC14 kmaway
Area guideAl FurjanFinished homesAED 1,071/sq ft1-bed rentAED 67k/yrGross yieldEstimate8.1%

Developer

  • 1 being built, on time
Escrow bank
Abu Dhabi Commercial Bank
Legal name
Bnw Echjay Real Estate Development L.L.C
Questions

More questions about Orvessa Residences by Michel Adam

10/40/50: 10% on booking, 40% during construction, 50% on handover. Payments go to the project’s escrow account at Abu Dhabi Commercial Bank.

Q2 2028, the planned date in DLD’s register.

It is not past its planned date. It was 1% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 19 months.

91 homes on 13 floors: 52 1-bed flats of 727–1,146 sq ft, 30 2-bed flats of 1,357–1,582 sq ft and 9 3-bed flats of 1,600 sq ft.

About AED 67k a year for a 1-bed, AED 93k for a 2-bed and AED 135k for a 3-bed in Al Furjan, a gross yield of about 8.1% Estimate.

Of BNW’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.

In Al Furjan, 31 minutes by car to Downtown Dubai and 40 to Dubai Airport (DXB). Al Furjan Metro station on the Red Line is a 25-minute walk.

More nearby

How the numbers work

FromAED 1.27MSee it on the map