Rabdan Gates
MajanRabdan
Rabdan Gates is an off-plan project by Rabdan in Majan, with 437 homes on 22 floors. DLD’s last inspection, on 26 Oct 2026, found it 1% built.
- Built
- 1%
- Handover
- Q2 2028
- Since launch
- Up 7%Studio price per sq ft
- Payment plan
- 20/40/10/30
- Homes
- 437
About
Rabdan Gates is a 22-floor building of 437 homes in the middle of Majan, close to Sheikh Mohammed Bin Zayed Road. Most homes are studios, with 1-bed and 2-bed flats and a few 3-bed flats, and shops fill the ground floor. Residents share a cinema room, a fire pit lounge and a mini golf course.
- Mostly studios
- Shops on the ground floor
- Cinema room and mini golf
Shared facilities
- Pools
- Mini golf
- Cinema room
- Fire pit lounge
- Outdoor fitness area
- Climbing wall
- Splash park
Progress
- Q2 2025Building started
- Jun–Aug 2025Launch sales · 203
- Oct 2026Last inspection · 1%
- Q2 2028Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 731k388 sq ft · 5 sales
- 1 bed
- AED 1.06M870 sq ft · 43 sales
- 2 beds
- AED 1.43M1,305 sq ft · 22 sales
Against 35 Majan off-plan projects with 10 or more sales
- Lowest783AED/sq ft
- Rabdan Gates1,209AED/sq ft
- Typical1,474AED/sq ft
- Highest2,941AED/sq ft
6th lowest of 35 · AED per sq ft in 12 months
Rabdan’s own price starts at AED 700k. DLD’s AED 731k is the lowest typical price paid in the 12 months.
Latest sales
Plus 4 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 16 Nov 2026 | 1 bed New | 905 | 1,160 | AED 1.05M |
| 13 Nov 2026 | 1 bed New | 929 | 1,130 | AED 1.05M |
| 13 Nov 2026 | 1 bed New | 870 | 1,236 | AED 1.08M |
| 6 Nov 2026 | 1 bed New | 905 | 1,105 | AED 1M |
| Oct 2026 · 1 sale | ||||
| 8 Oct 2026 | 1 bed | 905 | 1,160 | AED 1.05M |
| Sep 2026 · 1 sale | ||||
| 3 Sep 2026 | 1 bed | 929 | 1,163 | AED 1.08M |
| Aug 2026 · 7 sales | ||||
| 26 Aug 2026 | 1 bed | 929 | 1,184 | AED 1.1M |
| 24 Aug 2026 | 1 bed | 929 | 1,130 | AED 1.05M |
| 24 Aug 2026 | 1 bed | 905 | 1,212 | AED 1.1M |
| 24 Aug 2026 | 1 bed | 929 | 1,130 | AED 1.05M |
| 24 Aug 2026 | 1 bed | 870 | 1,207 | AED 1.05M |
| 24 Aug 2026 | 1 bed | 929 | 1,130 | AED 1.05M |
| 7 Aug 2026 | 1 bed | 905 | 1,218 | AED 1.1M |
| Jul 2026 · 6 sales | ||||
| 28 Jul 2026 | 1 bed | 905 | 1,192 | AED 1.08M |
| 21 Jul 2026 | 1 bed | 870 | 1,207 | AED 1.05M |
| 13 Jul 2026 | 1 bed | 929 | 1,130 | AED 1.05M |
| 6 Jul 2026 | 1 bed | 905 | 1,160 | AED 1.05M |
| 6 Jul 2026 | 1 bed | 869 | 1,292 | AED 1.12M |
| 6 Jul 2026 | 1 bed | 869 | 1,210 | AED 1.05M |
| Jun 2026 · 5 sales | ||||
| 29 Jun 2026 | 1 bed | 929 | 1,219 | AED 1.13M |
| 19 Jun 2026 | Studio | 366 | 1,639 | AED 600k |
| 17 Jun 2026 | 2 beds | 1,261 | 1,031 | AED 1.3M |
| 12 Jun 2026 | 1 bed | 869 | 1,192 | AED 1.04M |
| 9 Jun 2026 | 2 beds | 1,261 | 1,110 | AED 1.4M |
| May 2026 · 2 sales | ||||
| 22 May 2026 | 1 bed | 929 | 1,180 | AED 1.1M |
| 5 May 2026 | 2 beds | 1,192 | 1,145 | AED 1.37M |
| Apr 2026 · 10 sales | ||||
| 29 Apr 2026 | 1 bed | 792 | 1,355 | AED 1.07M |
| 29 Apr 2026 | 2 beds | 1,348 | 1,058 | AED 1.43M |
| 23 Apr 2026 | 2 beds | 1,192 | 1,231 | AED 1.47M |
| 23 Apr 2026 | 2 beds | 1,348 | 1,128 | AED 1.52M |
| 21 Apr 2026 | 2 beds | 1,218 | 1,132 | AED 1.38M |
| 20 Apr 2026 | Studio | 482 | 1,612 | AED 777k |
| 14 Apr 2026 | 2 beds | 1,261 | 1,010 | AED 1.27M |
| 13 Apr 2026 | 1 bed | 869 | 1,191 | AED 1.04M |
| 7 Apr 2026 | 1 bed | 870 | 1,257 | AED 1.09M |
| 6 Apr 2026 | 2 beds | 1,348 | 1,078 | AED 1.45M |
| Mar 2026 · 1 sale | ||||
| 26 Mar 2026 | 1 bed | 870 | 1,215 | AED 1.06M |
| Feb 2026 · 9 sales | ||||
| 26 Feb 2026 | 2 beds | 1,218 | 1,156 | AED 1.41M |
| 26 Feb 2026 | 1 bed | 708 | 1,570 | AED 1.11M |
| 26 Feb 2026 | 2 beds | 1,192 | 1,207 | AED 1.44M |
| 26 Feb 2026 | 1 bed | 870 | 1,185 | AED 1.03M |
| 17 Feb 2026 | 2 beds | 1,261 | 1,251 | AED 1.58M |
| 12 Feb 2026 | 1 bed | 905 | 1,188 | AED 1.08M |
| 5 Feb 2026 | 2 beds | 1,348 | 1,065 | AED 1.44M |
| 5 Feb 2026 | 1 bed | 905 | 1,262 | AED 1.14M |
| 5 Feb 2026 | 2 beds | 1,261 | 1,129 | AED 1.42M |
| Jan 2026 · 7 sales | ||||
| 29 Jan 2026 | 2 beds | 1,348 | 1,119 | AED 1.51M |
| 28 Jan 2026 | 1 bed | 869 | 1,222 | AED 1.06M |
| 26 Jan 2026 | 1 bed | 792 | 1,301 | AED 1.03M |
| 22 Jan 2026 | 2 beds | 1,348 | 1,105 | AED 1.49M |
Homes
437 homes by size
- Studio57%248 homes · 366–487 sq ft · 11 layouts
- 1 bed29%125 homes · 659–929 sq ft · 10 layouts
- 2 beds14%61 homes · 1,115–1,348 sq ft · 5 layouts
- 3 beds1%3 homes · 2,504–2,725 sq ft · 3 layouts
Payment plan
Rabdan’s project page- 20%On booking
- 40%During construction
- 10%On handover
- 30%After handover
Payments go to the project’s escrow account at Arab Bank PLC.
Location
Drive times
- Downtown Dubai30min
- Dubai Airport (DXB)27min
- Dubai Marina31min
By car. Kite Beach, the nearest beach, is 14.1 km away.
Rated schools
No rated schools within 5 km
Getting around
- Global VillageGold Line · opens 20322.7 kmaway
- MeydanEtihad Rail · planned7.7 kmaway
- ONPASSIVERed Line12 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB19 kmaway
Area guideMajanFinished homesAED 1,181/sq ft1-bed rentAED 65k/yrGross yieldEstimate6.6%Developer
- 2 finished
- 5 being built, on time
- 1 not started
- Escrow bank
- Arab Bank PLC
- Legal name
- Rabdan Real Estate Development L.L.C
More by Rabdan
| Project | Handover | Built |
|---|---|---|
| Gharbi II ResidencesJVC | Q3 2027Being built | 14% |
| Rabdan GardensAl Satwa | Q1 2028Being built | 1% |
| Rabdan SquareMeydan | Q1 2028Being built | 1% |
| Rabdan AvenueMeydan | Q1 2029Being built | 0% |
| Rabdan GardensAl Satwa | Q3 2028Not started | 0% |
More questions about Rabdan Gates
From AED 731k for a 388 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.06M and 2-bed flats sell for about AED 1.43M.
20/40/10/30: 20% on booking, 40% during construction, 10% on handover, 30% after handover. Payments go to the project’s escrow account at Arab Bank PLC.
Q2 2028, the planned date in DLD’s register.
It is not past its planned date. It was 1% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 19 months.
437 homes on 22 floors: 248 studios of 366–487 sq ft, 125 1-bed flats of 659–929 sq ft, 61 2-bed flats of 1,115–1,348 sq ft and 3 3-bed flats of 2,504–2,725 sq ft.
Down 6% for 1-bed flats, per sq ft. Against the launch sales of Jun 2025 – Aug 2025: studios up 7%, 2-bed flats down 6%.
About AED 44k a year for a studio, AED 65k for a 1-bed, AED 90k for a 2-bed and AED 130k for a 3-bed in Majan, a gross yield of about 6.6% Estimate.
Of Rabdan’s 8 projects on DLD’s record, 2 are finished. Of the 5 being built, none is past its planned date.
In Majan, 30 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). ONPASSIVE Metro station on the Red Line is 12 km away.
More nearby
Off-plan nearby
- Binghatti Skyflame 2From AED 570k12% built · Planned Q4 2027
- Ost Tower 11No sales88% built · Past planned date
- Binghatti VintageFrom AED 704k0% built · Planned Q1 2027
- Binghatti Skyflame 1From AED 550k15% built · Planned Q4 2027
- The Haven IIIFrom AED 1.18M6% built · Planned Q4 2027
- Tulip Oasis 11From AED 1.11M93% built · Past planned date
Finished buildings nearby
Typical next door AED 1,113/sq ft · 3 buildings within a 10-minute walk
- Celia Heights1,359AED/sq ft1-bed rent AED 65k/yr · 10-minute walk
- Madison Residence785AED/sq ftNot enough rents · 10-minute walk
- Deansgate by ADE1,113AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Al Rabia Tower760AED/sq ftNot enough rents
- The Haven1,452AED/sq ft1-bed rent AED 75k/yr
- Paradise View 11,020AED/sq ft1-bed rent AED 65k/yr
- Tulip Oasis 101,237AED/sq ft1-bed rent AED 75k/yr
