Samana Barari Avenue
MajanSamana
Samana Barari Avenue is an off-plan project by Samana in Majan, with 349 homes on 32 floors. DLD’s last inspection, on 26 Oct 2026, found it 6% built.
- Built
- 6%
- Handover
- Q4 2028
- Sales in 12 months
- No sales
- Homes
- 349
About
Home types
- Office
- Retail unit
Shared facilities
- Business facilities
- Wellness & recreation spaces
- Retail & dining
- Dedicated lobbies
- VIP drop-offs
- Eco-friendly architecture
- Secure access
Progress
- Q2 2025Building started
- Oct 2026Last inspection · 6%
- Q4 2028Planned handover
Location
Drive times
- Downtown Dubai30min
- Dubai Airport (DXB)27min
- Dubai Marina31min
By car. Kite Beach, the nearest beach, is 13.2 km away.
Rated schools
No rated schools within 5 km
Getting around
- Global VillageGold Line · opens 20322.6 kmaway
- MeydanEtihad Rail · planned7.3 kmaway
- ONPASSIVERed Line11 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB19 kmaway
Area guideMajanFinished homesAED 1,181/sq ft1-bed rentAED 65k/yrGross yieldEstimate6.6%Developer
- 6 finished
- 41 being built, on time
- 8 past their planned date
- 2 not started
- Escrow bank
- Dubai Islamic Bank
- Legal name
- Samana Signature Real Estate Developments L.L.C
Also being built by Samana
| Project | Handover | Built |
|---|---|---|
| Samana MykonosDubai Studio City | Q2 2025Past planned date | 91% |
| Samana WavesJVC | Q4 2025Past planned date | 91% |
| Miami BY SDJumeirah Village Triangle | Q4 2025Past planned date | 71% |
| Samana Waves 2JVC | Q1 2026Past planned date | 52% |
| Samana Mykonos SignatureArjan | Q2 2026Past planned date | 86% |
More questions about Samana Barari Avenue
Q4 2028, the planned date in DLD’s register.
It is not past its planned date. It was 6% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.
About AED 44k a year for a studio, AED 65k for a 1-bed, AED 90k for a 2-bed and AED 130k for a 3-bed in Majan, a gross yield of about 6.6% Estimate.
Of Samana’s 57 projects on DLD’s record, 6 are finished. Of the 49 being built, 8 are past their planned date.
In Majan, 30 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). ONPASSIVE Metro station on the Red Line is 11 km away.
More nearby
Off-plan nearby
- Barari Parkview by Al MawaredNo sales45% built · Planned Q4 2027
- The Haven IIFrom AED 673k56% built · Planned Q4 2026
- Taormina Village 1From AED 2.06M20% built · Planned Q4 2027
- Divine Al BarariFrom AED 725k20% built · Planned Q1 2028
- The Vault by ImtiazNo sales0% built · Planned Q2 2029
- Blossom 40From AED 1.15M0% built · Planned Q1 2028
Finished buildings nearby
Typical next door AED 1,136/sq ft · 3 buildings within a 10-minute walk
- The Haven1,452AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- The 501,136AED/sq ft1-bed rent AED 63k/yr · 10-minute walk
- Sherena Residence951AED/sq ft1-bed rent AED 65k/yr · 10-minute walk
- Al Rabia Tower760AED/sq ftNot enough rents
- Paradise View 11,020AED/sq ft1-bed rent AED 65k/yr
- Celia Heights1,359AED/sq ft1-bed rent AED 65k/yr
- Tulip Oasis 101,237AED/sq ft1-bed rent AED 75k/yr
