Skip to content

The Orchard Place - Towers D&E

Jumeirah Village CirclePeak Summit

FromAED 710kStudio · 530 sq ft

The Orchard Place - Towers D&E is an off-plan project by Peak Summit in Jumeirah Village Circle, with 398 homes on 30 floors. DLD’s last inspection, on 26 Oct 2026, found it 1% built.

Built
1%
Handover
Q1 2028
Since launch
Down 3%Studio price per sq ft
Homes
398

About

Towers D & E at The Orchard Place is two buildings of up to 30 floors with 398 homes in Jumeirah Village Circle, beside parks. Most homes are 1-bed flats, with studios, 2-bed flats and a few 3-bed flats, all sold fully furnished and some with a private pool. Residents share a padel court, a football pitch and a terrace gym with steam rooms, above restaurants on the ground floor.

  • Faces parks on three sides
  • Some flats with private pools
  • Restaurants on the ground floor

Shared facilities

  • Adults’ pool
  • Kids’ pool
  • Padel tennis court
  • Basketball court
  • Football pitch
  • Terrace gym
  • Steam rooms
  • Kids’ play areas

Progress

1%built
  1. Q2 2025Building started
  2. Aug–Oct 2025Launch sales · 25
  3. Oct 2026Last inspection · 1%
  4. Q1 2028Planned handover

Prices

Price per sq ft

1,350 AED/sq ft36 sales in 12 months

Typical price by size

Studio
AED 710k530 sq ft · 7 sales
1 bed
AED 1.07M789 sq ft · 25 sales
2 beds
AED 1.61M1,303 sq ft · 4 sales

Against 99 JVC off-plan projects with 10 or more sales

  • Lowest825AED/sq ft
  • The Orchard Place - Towers D&E1,350AED/sq ft
  • Typical1,497AED/sq ft
  • Highest2,276AED/sq ft

21st lowest of 99 · AED per sq ft in 12 months

Latest sales

Newest first
36 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Sep 2026 · 1 sale
17 Sep 20261 bed7891,392AED 1.1M
Aug 2026 · 2 sales
12 Aug 20261 bed7081,484AED 1.05M
12 Aug 20261 bed7941,423AED 1.13M
Apr 2026 · 1 sale
17 Apr 20261 bed7081,404AED 994k
Mar 2026 · 2 sales
30 Mar 2026Studio5301,369AED 726k
5 Mar 20261 bed7891,327AED 1.05M
Feb 2026 · 7 sales
23 Feb 20261 bed7891,339AED 1.06M
13 Feb 20261 bed7941,409AED 1.12M
12 Feb 20262 beds1,3031,254AED 1.63M
6 Feb 20261 bed7891,356AED 1.07M
5 Feb 20261 bed9151,288AED 1.18M
3 Feb 20261 bed7941,344AED 1.07M
2 Feb 20261 bed7941,428AED 1.13M
Jan 2026 · 13 sales
30 Jan 20262 beds1,3031,211AED 1.58M
30 Jan 20262 beds1,3361,240AED 1.66M
30 Jan 2026Studio5301,333AED 706k
30 Jan 20261 bed7891,332AED 1.05M
29 Jan 20261 bed7081,493AED 1.06M
28 Jan 20261 bed9131,236AED 1.13M
28 Jan 20261 bed7941,365AED 1.08M
28 Jan 20261 bed9151,278AED 1.17M
21 Jan 2026Studio5301,358AED 720k
13 Jan 20261 bed6871,432AED 984k
12 Jan 2026Studio5301,320AED 700k
12 Jan 20261 bed6871,399AED 961k
12 Jan 2026Studio5301,326AED 703k
Dec 2025 · 3 sales
15 Dec 20251 bed8391,278AED 1.07M
10 Dec 20251 bed7941,362AED 1.08M
9 Dec 20251 bed7891,464AED 1.16M
Nov 2025 · 7 sales
24 Nov 20251 bed6871,499AED 1.03M
24 Nov 20251 bed9151,314AED 1.2M
21 Nov 2025Studio5301,388AED 736k
7 Nov 2025Studio5301,339AED 710k
5 Nov 20251 bed6871,455AED 1M
3 Nov 20251 bed7941,332AED 1.06M
3 Nov 20252 beds1,3031,221AED 1.59M

Homes

398 homes by size

  • Studio13%51 homes · 368–1,001 sq ft · 5 layouts
  • 1 bed61%244 homes · 671–2,142 sq ft · 18 layouts
  • 2 beds24%97 homes · 1,007–1,797 sq ft · 6 layouts
  • 3 beds2%6 homes · 2,104–3,126 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)35min
  • Dubai Marina21min

By car. JBR Beach, the nearest beach, is 8.4 km away.

Rated schools

  • Nord Anglia International SchoolUK · Outstanding1.8 kmaway
  • JSS International SchoolIndian · Very good2.3 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 20325 minwalk
  • Al YalayisEtihad Rail6.0 kmaway
  • Jumeirah Golf EstatesRed Line6.3 kmaway
  • Al Maktoum AirportHigh-speed rail · planned18 kmaway
  • Al Maktoum InternationalDWC18 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 3 being built, on time
Escrow bank
First Abu Dhabi Bank
Legal name
Peak Summit Real Estate Development L.L.C

Also being built by Peak Summit

Peak Summit’s other projects
ProjectHandoverBuilt
The Orchard Place - Tower CJVCQ1 2027Being built13%
The Orchard PlaceJVCNot on recordBeing built43%
All 3 Peak Summit projects
Questions

More questions about The Orchard Place - Towers D&E

From AED 710k for a 530 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.07M and 2-bed flats sell for about AED 1.61M.

Q1 2028, the planned date in DLD’s register.

It is not past its planned date. It was 1% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 16 months.

398 homes on 30 floors: 51 studios of 368–1,001 sq ft, 244 1-bed flats of 671–2,142 sq ft, 97 2-bed flats of 1,007–1,797 sq ft and 6 3-bed flats of 2,104–3,126 sq ft.

0% for 1-bed flats, per sq ft. Against the launch sales of Aug 2025 – Oct 2025: studios down 3%, 2-bed flats down 4%.

About AED 48k a year for a studio, AED 71k for a 1-bed, AED 100k for a 2-bed and AED 143k for a 3-bed in JVC, a gross yield of about 7.3% Estimate.

Of Peak Summit’s 3 projects on DLD’s record, 0 are finished. Of the 3 being built, none is past its planned date.

In Jumeirah Village Circle, 26 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 6.3 km away.

More nearby

How the numbers work

FromAED 710kSee it on the map