Viani by Meteora
LiwanMeteora
Viani by Meteora is an off-plan project by Meteora in Liwan, with 117 homes on 9 floors. DLD’s last inspection found it 0% built.
- Built
- 0%
- Handover
- Q2 2027
- Sales in 12 months
- No sales
- Homes
- 117
Progress
- Q2 2025Building started
- Jun 2026Last inspection · 0%
- Q2 2027Planned handover
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
117 homes by size
- Studio31%36 homes · 413–531 sq ft · 6 layouts
- 1 bed8%9 homes · 822–984 sq ft · 2 layouts
- 2 beds62%72 homes · 990–1,903 sq ft · 12 layouts
Location
Drive times
- Downtown Dubai26min
- Dubai Airport (DXB)26min
- Dubai Marina34min
By car. Jumeirah Open Beach, the nearest beach, is 17.4 km away.
Rated schools
- GEMS Wellington Academy -FzeUK · Very good2.3 kmaway
- Repton SchoolUK/IB (Y 13) · Outstanding4.7 kmaway
Getting around
- Dubai Silicon OasisBlue Line · opens 20292.6 kmaway
- MeydanEtihad Rail · planned9.2 kmaway
- CreekGreen Line13 kmaway
- Al JaddafHigh-speed rail · planned14 kmaway
- Dubai InternationalDXB17 kmaway
Area guideLiwanFinished homesAED 851/sq ft1-bed rentAED 55k/yrGross yieldEstimate8.8%Developer
- 1 finished
- 2 being built, on time
- 2 past their planned date
- 1 not started
- Escrow bank
- Abu Dhabi Commercial Bank
- Legal name
- Meteora Elite Real Estate Developments L.L.C
More by Meteora
| Project | Handover | Built |
|---|---|---|
| 7 Park Central BY MeteoraJVC | Q2 2025Past planned date | 90% |
| Vita Grande BY MeteoraJVC | Q3 2025Past planned date | 64% |
| Park Boulevard BY MeteoraJVC | Q4 2026Being built | 30% |
| Vivanti Residences by MeteoraJVC | Q1 2028Being built | 0% |
| The East Crest BY MeteoraJVC | Q1 2025Finished |
More questions about Viani by Meteora
Q2 2027, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection, with handover planned in 7 months.
117 homes on 9 floors: 36 studios of 413–531 sq ft, 9 1-bed flats of 822–984 sq ft and 72 2-bed flats of 990–1,903 sq ft.
About AED 42k a year for a studio, AED 55k for a 1-bed and AED 78k for a 2-bed in Liwan, a gross yield of about 8.8% Estimate.
Of Meteora’s 6 projects on DLD’s record, 1 are finished. Of the 4 being built, 2 are past their planned date.
In Liwan, 26 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). Creek Metro station on the Green Line is 13 km away.
More nearby
Off-plan nearby
- Alma GardensFrom AED 1.02M50% built · Past planned date
- Confident PrestonNo sales0% built · Planned Q2 2028
- Symbolic AltusFrom AED 1.03M1% built · Planned Q2 2027
- Parkgreen Residences by AlishaanFrom AED 830k4% built · Planned Q2 2028
- Sunrise Boulevard 5No salesPast planned date
- Reem by visionFrom AED 565k70% built · Planned Q4 2026
Finished buildings nearby
Typical next door AED 802/sq ft · 12 buildings within a 10-minute walk
- Qpoint Liwan-Plot R068630AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Qpoint Liwan-Plot R069659AED/sq ft1-bed rent AED 49k/yr · 10-minute walk
- Qpoint Liwan-Plot R070817AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Celine by Vision1,226AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Qpoint Liwan-Plot R072718AED/sq ft1-bed rent AED 54k/yr · 10-minute walk
- Wavez Residence1,241AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Qpoint Liwan-Plot R099782AED/sq ft1-bed rent AED 52k/yr · 10-minute walk
- Qpoint Liwan-Plot R098697AED/sq ft1-bed rent AED 46k/yr · 10-minute walk
- Qpoint Liwan-Plot R097795AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Qpoint Liwan-Plot R096859AED/sq ft1-bed rent AED 47k/yr · 10-minute walk
- Qpoint Liwan-Plot R095862AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Qpoint Liwan-Plot R094809AED/sq ft1-bed rent AED 48k/yr · 10-minute walk
- Qpoint Liwan-Plot R005555AED/sq ftNot enough rents
- Qpoint Liwan-Plot R008 A&B815AED/sq ft1-bed rent AED 48k/yr
- Qpoint Liwan - Plot R002743AED/sq ft1-bed rent AED 49k/yr
- Qpoint Liwan-Plot R004571AED/sq ftNot enough rents