W1 is an off-plan project by Malina W1 in Al Furjan, with 82 homes on 12 floors. DLD’s last inspection, on 26 Oct 2026, found it 70% built.

Built
70%
Handover
Q4 2025
Sales in 12 months
No sales
Homes
82

Progress

70%built
  1. Q1 2024Building started
  2. Q4 2025Planned handover · passed
  3. Oct 2026Last inspection · 70%
11 months past the planned date

Homes

82 homes by size

  • 1 bed49%40 homes · 772–1,126 sq ft · 6 layouts
  • 2 beds30%25 homes · 1,047–1,995 sq ft · 6 layouts
  • 3 beds21%17 homes · 1,454–2,110 sq ft · 4 layouts

Location

Drive times

  • Downtown Dubai30min
  • Dubai Airport (DXB)40min
  • Dubai Marina16min

By car. JBR Beach, the nearest beach, is 5.8 km away.

Rated schools

  • The Arbor SchoolUK · Good0.7 kmaway
  • Delhi Private SchoolIndian · Very good2.1 kmaway

Getting around

  • Discovery GardensRed Line15 minwalk
  • Al YalayisEtihad Rail3.2 kmaway
  • Al Maktoum AirportHigh-speed rail · planned15 kmaway
  • Al Maktoum InternationalDWC15 kmaway
Area guideAl FurjanFinished homesAED 1,071/sq ft1-bed rentAED 67k/yrGross yieldEstimate8.1%

Developer

Malina W1

  • 1 past their planned date
Escrow bank
Abu Dhabi Islamic Bank
Legal name
Malina W1 Real Estate Development L.L.C
Questions

More questions about W1

Q4 2025, the planned date in DLD’s register.

No. It is 11 months past its planned date, and was 70% built at DLD’s last inspection on 26 Oct 2026.

82 homes on 12 floors: 40 1-bed flats of 772–1,126 sq ft, 25 2-bed flats of 1,047–1,995 sq ft and 17 3-bed flats of 1,454–2,110 sq ft.

About AED 67k a year for a 1-bed, AED 93k for a 2-bed and AED 135k for a 3-bed in Al Furjan, a gross yield of about 8.1% Estimate.

Of Malina W1’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.

In Al Furjan, 30 minutes by car to Downtown Dubai and 40 to Dubai Airport (DXB). Discovery Gardens Metro station on the Red Line is a 15-minute walk.

More nearby

How the numbers work