171 Garden Heights
Jumeirah Garden CityJAD Global
171 Garden Heights is an off-plan project by JAD Global in Jumeirah Garden City, with 159 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 34% built.
- Built
- 34%
- Handover
- Q4 2026
- Since launch
- Up 10%1 bed price per sq ft
- Homes
- 159
Progress
- Q3 2024Building started
- Oct–Dec 2024Launch sales · 36
- Oct 2026Last inspection · 34%
- Q4 2026Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- Not enough sales2 sales
- 1 bed
- AED 1.3M664 sq ft · 2,000 AED/sq ft · 17 sales
- 2 beds
- Not enough sales2 sales
Against 28 Al Satwa off-plan projects with 10 or more sales
- Lowest1,773AED/sq ft
- 171 Garden Heights1,979AED/sq ft
- Typical2,194AED/sq ft
- Highest3,037AED/sq ft
7th lowest of 28 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Oct 2026 · 1 sale | ||||
| 16 Oct 2026 | 1 bed | 758 | 1,701 | AED 1.29M |
| Jun 2026 · 1 sale | ||||
| 19 Jun 2026 | 1 bed | 677 | 1,751 | AED 1.19M |
| Apr 2026 · 2 sales | ||||
| 13 Apr 2026 | 1 bed | 664 | 2,099 | AED 1.39M |
| 8 Apr 2026 | 1 bed | 664 | 2,206 | AED 1.47M |
| Mar 2026 · 2 sales | ||||
| 11 Mar 2026 | Studio | 440 | 1,979 | AED 871k |
| 10 Mar 2026 | 1 bed | 702 | 1,851 | AED 1.3M |
| Feb 2026 · 5 sales | ||||
| 25 Feb 2026 | 1 bed | 664 | 2,099 | AED 1.39M |
| 25 Feb 2026 | 1 bed | 657 | 2,098 | AED 1.38M |
| 13 Feb 2026 | 1 bed | 700 | 1,920 | AED 1.34M |
| 13 Feb 2026 | 2 beds | 1,021 | 1,861 | AED 1.9M |
| 2 Feb 2026 | 1 bed | 663 | 2,301 | AED 1.53M |
| Jan 2026 · 4 sales | ||||
| 27 Jan 2026 | 2 beds | 1,090 | 2,201 | AED 2.4M |
| 26 Jan 2026 | 1 bed | 664 | 2,099 | AED 1.39M |
| 26 Jan 2026 | 1 bed | 700 | 1,849 | AED 1.29M |
| 19 Jan 2026 | 1 bed | 664 | 2,108 | AED 1.4M |
| Dec 2025 · 3 sales | ||||
| 10 Dec 2025 | 1 bed | 702 | 1,849 | AED 1.3M |
| 5 Dec 2025 | 1 bed | 616 | 2,099 | AED 1.29M |
| 1 Dec 2025 | 1 bed | 700 | 1,812 | AED 1.27M |
| Nov 2025 · 3 sales | ||||
| 18 Nov 2025 | Studio | 445 | 1,899 | AED 845k |
| 3 Nov 2025 | 1 bed | 616 | 1,999 | AED 1.23M |
| 3 Nov 2025 | 1 bed | 702 | 1,799 | AED 1.26M |
Homes
159 homes by size
- Studio9%15 homes · 440–545 sq ft · 3 layouts
- 1 bed81%128 homes · 616–908 sq ft · 11 layouts
- 2 beds10%16 homes · 1,021–1,090 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai15min
- Dubai Airport (DXB)24min
- Dubai Marina27min
By car. La Mer Beach, the nearest beach, is 1.7 km away.
Rated schools
- New Academy SchoolAmerican · Good3.0 kmaway
- JSS Private SchoolIndian · Very good4.3 kmaway
Getting around
- Al SatwaGold Line · opens 20325 minwalk
- Emirates TowersRed Line17 minwalk
- Al JaddafHigh-speed rail · planned6.0 kmaway
- MeydanEtihad Rail · planned8.0 kmaway
- Dubai InternationalDXB9.5 kmaway
Area guideAl SatwaFinished homesAED 1,738/sq ft1-bed rentAED 73k/yrGross yieldEstimate5.5%Developer
- 3 being built, on time
- Escrow bank
- Dubai Islamic Bank
- Legal name
- Jad Global Real Estate Development L.L.C
Also being built by JAD Global
More questions about 171 Garden Heights
From AED 1.3M for a 664 sq ft 1-bed, the lowest typical price paid in the 12 months.
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 34% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.
159 homes on 8 floors: 15 studios of 440–545 sq ft, 128 1-bed flats of 616–908 sq ft and 16 2-bed flats of 1,021–1,090 sq ft.
Up 10% for 1-bed flats, per sq ft.
About AED 53k a year for a studio, AED 73k for a 1-bed and AED 95k for a 2-bed in Al Satwa, a gross yield of about 5.5% Estimate.
Of JAD Global’s 3 projects on DLD’s record, 0 are finished. Of the 3 being built, none is past its planned date.
In Jumeirah Garden City, Al Satwa, 15 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Emirates Towers Metro station on the Red Line is a 17-minute walk.
More nearby
Off-plan nearby
- Rose Gardens 1From AED 1.51M43% built · Past planned date
- 161 Jumeirah LaneFrom AED 1.43M70% built · Past planned date
- Linea by HolmFrom AED 1.05M1% built · Planned Q2 2028
- Olivia Gardens ResidenceFrom AED 1.59M5% built · Planned Q2 2027
- Onaya Residences by KayaNo sales38% built · Past planned date
- Stamn OneFrom AED 1.05M42% built · Planned Q4 2026
Finished buildings nearby
Typical next door AED 2,289/sq ft · 3 buildings within a 10-minute walk
