Onaya Residences by Kaya
Al SatwaKaya
Onaya Residences by Kaya is an off-plan project by Kaya in Al Satwa, with 41 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 38% built.
- Built
- 38%
- Handover
- Q2 2026
- Sales in 12 months
- No sales
- Homes
- 41
Progress
- Q4 2024Building started
- Q2 2026Planned handover · passed
- Oct 2026Last inspection · 38%
Homes
41 homes by size
- Studio20%8 homes · 418–1,045 sq ft · 2 layouts
- 1 bed59%24 homes · 700–2,603 sq ft · 6 layouts
- 2 beds22%9 homes · 1,211–1,902 sq ft · 3 layouts
Location
Drive times
- Downtown Dubai15min
- Dubai Airport (DXB)24min
- Dubai Marina27min
By car. La Mer Beach, the nearest beach, is 2.0 km away.
Rated schools
- New Academy SchoolAmerican · Good3.1 kmaway
- JSS Private SchoolIndian · Very good4.2 kmaway
Getting around
- Al SatwaGold Line · opens 20329 minwalk
- Emirates TowersRed Line13 minwalk
- Al JaddafHigh-speed rail · planned5.8 kmaway
- MeydanEtihad Rail · planned7.8 kmaway
- Dubai InternationalDXB9.5 kmaway
Area guideAl SatwaFinished homesAED 1,738/sq ft1-bed rentAED 73k/yrGross yieldEstimate5.5%Developer
Kaya
- 1 past their planned date
- Escrow bank
- Emirates Islamic Bank
- Legal name
- Kaya Properties L.L.C
More questions about Onaya Residences by Kaya
Q2 2026, the planned date in DLD’s register.
No. It is 5 months past its planned date, and was 38% built at DLD’s last inspection on 26 Oct 2026.
41 homes on 8 floors: 8 studios of 418–1,045 sq ft, 24 1-bed flats of 700–2,603 sq ft and 9 2-bed flats of 1,211–1,902 sq ft.
About AED 53k a year for a studio, AED 73k for a 1-bed and AED 95k for a 2-bed in Al Satwa, a gross yield of about 5.5% Estimate.
Of Kaya’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.
In Al Satwa, 15 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). Emirates Towers Metro station on the Red Line is a 13-minute walk.
More nearby
Off-plan nearby
- Stamn OneFrom AED 1.05M42% built · Planned Q4 2026
- Olivia Gardens ResidenceFrom AED 1.59M5% built · Planned Q2 2027
- Elemental 22No sales26% built · Planned Q2 2028
- Jardin AstralFrom AED 1.76M45% built · Past planned date
- 161 Jumeirah LaneFrom AED 1.43M70% built · Past planned date
- ElmoraFrom AED 1.33M0% built · Planned Q1 2028
Finished buildings nearby
Typical next door AED 2,289/sq ft · 3 buildings within a 10-minute walk