Elmora
Jumeirah Garden CityNeoterra
Elmora is an off-plan project by Neoterra in Jumeirah Garden City, with 85 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q1 2028
- Sales in 12 months
- 43
- Homes
- 85
Progress
- Q4 2025Building started
- Oct 2026Last inspection · 0%
- Q1 2028Planned handover
Prices
Price per sq ft
Typical price by size
- 1 bed
- AED 1.33M480 sq ft · 2,795 AED/sq ft · 7 sales
- 2 beds
- AED 1.9M725 sq ft · 2,670 AED/sq ft · 7 sales
Against 28 Al Satwa off-plan projects with 10 or more sales
- Lowest1,773AED/sq ft
- Typical2,194AED/sq ft
- Elmora2,776AED/sq ft
- Highest3,037AED/sq ft
2nd highest of 28 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Jul 2026 · 1 sale | ||||
| 6 Jul 2026 | 1 bed | 480 | 2,792 | AED 1.34M |
| Jun 2026 · 2 sales | ||||
| 24 Jun 2026 | 2 beds | 663 | 2,767 | AED 1.83M |
| 22 Jun 2026 | 1 bed | 397 | 3,114 | AED 1.24M |
| May 2026 · 11 sales | ||||
| 20 May 2026 | 2 beds | 819 | 2,378 | AED 1.95M |
| 20 May 2026 | 2 beds | 766 | 2,375 | AED 1.82M |
| 20 May 2026 | 2 beds | 725 | 2,671 | AED 1.94M |
| 12 May 2026 | 1 bed | 480 | 2,776 | AED 1.33M |
| 12 May 2026 | 1 bed | 394 | 3,061 | AED 1.21M |
| 11 May 2026 | 1 bed | 696 | 2,673 | AED 1.86M |
| 11 May 2026 | 2 beds | 669 | 2,744 | AED 1.84M |
| 11 May 2026 | 2 beds | 699 | 2,720 | AED 1.9M |
| 11 May 2026 | 1 bed | 397 | 3,065 | AED 1.22M |
| 11 May 2026 | 2 beds | 1,106 | 2,297 | AED 2.54M |
| 11 May 2026 | 1 bed | 530 | 2,643 | AED 1.4M |
| Apr 2026 · 1 sale | ||||
| 20 Apr 2026 | 1 bed | 393 | 2,734 | AED 1.07M |
| Mar 2026 · 3 sales | ||||
| 9 Mar 2026 | 1 bed | 393 | 2,973 | AED 1.17M |
| 9 Mar 2026 | 2 beds | 651 | 2,703 | AED 1.76M |
| 2 Mar 2026 | 2 beds | 691 | 2,691 | AED 1.86M |
| Feb 2026 · 17 sales | ||||
| 16 Feb 2026 | 1 bed | 395 | 2,984 | AED 1.18M |
| 9 Feb 2026 | 1 bed | 502 | 2,891 | AED 1.45M |
| 9 Feb 2026 | 2 beds | 667 | 2,797 | AED 1.87M |
| 9 Feb 2026 | 2 beds | 726 | 2,756 | AED 2M |
| 9 Feb 2026 | 1 bed | 393 | 3,021 | AED 1.19M |
| 9 Feb 2026 | 1 bed | 502 | 2,860 | AED 1.44M |
| 6 Feb 2026 | 1 bed | 393 | 2,835 | AED 1.11M |
| 6 Feb 2026 | 1 bed | 393 | 2,973 | AED 1.17M |
| 2 Feb 2026 | 1 bed | 502 | 2,816 | AED 1.41M |
| 2 Feb 2026 | 1 bed | 502 | 2,755 | AED 1.38M |
| 2 Feb 2026 | 1 bed | 393 | 2,927 | AED 1.15M |
| 2 Feb 2026 | 1 bed | 393 | 3,069 | AED 1.21M |
| 2 Feb 2026 | 1 bed | 393 | 2,881 | AED 1.13M |
| 2 Feb 2026 | 1 bed | 393 | 3,021 | AED 1.19M |
| 2 Feb 2026 | 1 bed | 478 | 2,717 | AED 1.3M |
| 2 Feb 2026 | 1 bed | 478 | 2,727 | AED 1.3M |
| 2 Feb 2026 | 1 bed | 478 | 2,757 | AED 1.32M |
| Jan 2026 · 8 sales | ||||
| 30 Jan 2026 | 1 bed | 395 | 2,843 | AED 1.12M |
| 30 Jan 2026 | 1 bed | 393 | 2,880 | AED 1.13M |
| 30 Jan 2026 | 1 bed | 393 | 2,721 | AED 1.07M |
| 30 Jan 2026 | 1 bed | 395 | 2,861 | AED 1.13M |
| 30 Jan 2026 | 1 bed | 393 | 2,790 | AED 1.1M |
| 30 Jan 2026 | 1 bed | 478 | 2,668 | AED 1.28M |
| 30 Jan 2026 | 2 beds | 660 | 2,686 | AED 1.77M |
| 30 Jan 2026 | 1 bed | 632 | 2,678 | AED 1.69M |
Homes
85 homes by size
- Studio8%7 homes · 228 sq ft · 1 layout
- 1 bed46%39 homes · 394–696 sq ft · 6 layouts
- 2 beds46%39 homes · 654–1,106 sq ft · 8 layouts
Location
Drive times
- Downtown Dubai15min
- Dubai Airport (DXB)24min
- Dubai Marina27min
By car. La Mer Beach, the nearest beach, is 2.2 km away.
Rated schools
- New Academy SchoolAmerican · Good3.1 kmaway
- JSS Private SchoolIndian · Very good4.4 kmaway
Getting around
- World Trade CentreRed Line11 minwalk
- Al SatwaGold Line · opens 203212 minwalk
- Al JaddafHigh-speed rail · planned5.5 kmaway
- MeydanEtihad Rail · planned7.7 kmaway
- Dubai InternationalDXB9.2 kmaway
Area guideAl SatwaFinished homesAED 1,738/sq ft1-bed rentAED 73k/yrGross yieldEstimate5.5%Developer
- 2 being built, on time
- Escrow bank
- National Bank of Fujairah
- Legal name
- Neoterra Real Estate Development L.L.C
Also being built by Neoterra
| Project | Handover | Built |
|---|---|---|
| EIRADubai Production City | Q2 2029Being built | 0% |
More questions about Elmora
From AED 1.33M for a 480 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 1.9M.
Q1 2028, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 16 months.
85 homes on 8 floors: 7 studios of 228 sq ft, 39 1-bed flats of 394–696 sq ft and 39 2-bed flats of 654–1,106 sq ft.
About AED 53k a year for a studio, AED 73k for a 1-bed and AED 95k for a 2-bed in Al Satwa, a gross yield of about 5.5% Estimate.
Of Neoterra’s 2 projects on DLD’s record, 0 are finished. Of the 2 being built, none is past its planned date.
In Jumeirah Garden City, Al Satwa, 15 minutes by car to Downtown Dubai and 24 to Dubai Airport (DXB). World Trade Centre Metro station on the Red Line is a 11-minute walk.
More nearby
Off-plan nearby
- Alba TowerFrom AED 722k31% built · Planned Q2 2028
- Enso AmberFrom AED 1.12M11% built · Past planned date
- Jardin AstralFrom AED 1.76M45% built · Past planned date
- Onaya Residences by KayaNo sales38% built · Past planned date
- Olivia Gardens ResidenceFrom AED 1.59M5% built · Planned Q2 2027
- Stamn OneFrom AED 1.05M42% built · Planned Q4 2026
Finished buildings nearby
Typical next door AED 2,289/sq ft · 3 buildings within a 10-minute walk
