Skip to content

Eira

Dubai Production CityNeoterra

FromAED 580kStudio · 348 sq ft

Eira is an off-plan project by Neoterra in Dubai Production City, with 271 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q2 2029
Sales in 12 months
45
Homes
271

Progress

0%built
  1. Q3 2026Building started
  2. Oct 2026Last inspection · 0%
  3. Q2 2029Planned handover

Prices

Price per sq ft

1,611 AED/sq ft45 sales in 12 months

Typical price by size

Studio
AED 580k348 sq ft · 1,653 AED/sq ft · 31 sales
1 bed
AED 1.02M716 sq ft · 1,400 AED/sq ft · 14 sales

Against 20 Dubai Production City off-plan projects with 10 or more sales

  • Lowest1,165AED/sq ft
  • Typical1,445AED/sq ft
  • Eira1,611AED/sq ft
  • Highest1,650AED/sq ft

4th highest of 20 · AED per sq ft in 12 months

Latest sales

Plus 10 newer sales, newest first
45 off-plan sales · Nov 2025 – Oct 2026, plus 10 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
13 Nov 2026Studio New3561,621AED 577k
11 Nov 2026Studio New3571,594AED 569k
11 Nov 20261 bed New7161,406AED 1.01M
10 Nov 2026Studio New3461,676AED 580k
10 Nov 20261 bed New6351,400AED 889k
7 Nov 2026Studio New3461,653AED 572k
7 Nov 2026Studio New3561,615AED 575k
7 Nov 2026Studio New3461,714AED 593k
7 Nov 20261 bed New6781,367AED 927k
7 Nov 20261 bed New6961,447AED 1.01M
Oct 2026 · 18 sales
26 Oct 20261 bed6791,368AED 929k
26 Oct 2026Studio3561,610AED 573k
22 Oct 2026Studio3551,563AED 555k
20 Oct 2026Studio3571,566AED 559k
20 Oct 20261 bed6781,391AED 943k
20 Oct 2026Studio3461,702AED 589k
20 Oct 2026Studio3561,598AED 569k
14 Oct 20261 bed7161,387AED 993k
14 Oct 2026Studio3461,676AED 580k
13 Oct 20261 bed6961,405AED 978k
13 Oct 2026Studio3481,667AED 580k
13 Oct 20261 bed8341,394AED 1.16M
12 Oct 2026Studio3461,728AED 598k
12 Oct 20261 bed7471,394AED 1.04M
12 Oct 2026Studio3571,611AED 575k
2 Oct 2026Studio3431,691AED 580k
2 Oct 2026Studio3571,605AED 573k
2 Oct 2026Studio3551,620AED 575k
Sep 2026 · 18 sales
30 Sep 2026Studio3461,665AED 576k
30 Sep 2026Studio3561,632AED 581k
30 Sep 2026Studio3571,611AED 575k
29 Sep 2026Studio3461,676AED 580k
24 Sep 20261 bed7041,452AED 1.02M
24 Sep 20261 bed6961,415AED 985k
24 Sep 20261 bed8341,380AED 1.15M
21 Sep 2026Studio3461,702AED 589k
21 Sep 2026Studio3461,702AED 589k
21 Sep 2026Studio3461,714AED 593k
21 Sep 2026Studio3431,743AED 598k
21 Sep 2026Studio3831,572AED 602k
21 Sep 2026Studio3541,655AED 586k
21 Sep 2026Studio3541,641AED 581k
21 Sep 2026Studio3571,543AED 551k
21 Sep 20261 bed7471,434AED 1.07M
11 Sep 2026Studio3461,642AED 568k
11 Sep 2026Studio3431,729AED 593k
Aug 2026 · 9 sales
28 Aug 2026Studio3831,585AED 607k
27 Aug 20261 bed7161,418AED 1.02M
27 Aug 2026Studio3571,611AED 575k
20 Aug 20261 bed7471,414AED 1.06M

Homes

271 homes by size

  • Studio64%174 homes · 346–418 sq ft · 6 layouts
  • 1 bed36%97 homes · 635–834 sq ft · 9 layouts

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)35min
  • Dubai Marina21min

By car. JBR Beach, the nearest beach, is 8.3 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding2.6 kmaway
  • Dwight SchoolInternational Baccalaureate · Good3.3 kmaway

Getting around

  • Dubai Production CityGold Line · opens 203210 minwalk
  • Al YalayisEtihad Rail3.5 kmaway
  • Jumeirah Golf EstatesRed Line3.8 kmaway
  • Al Maktoum AirportHigh-speed rail · planned16 kmaway
  • Al Maktoum InternationalDWC16 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%

Developer

  • 2 being built, on time
Escrow bank
Not on record
Legal name
Neoterra Dpc Developments L.L.C

Also being built by Neoterra

Neoterra’s other projects
ProjectHandoverBuilt
ElmoraAl SatwaQ1 2028Being built0%
All 2 Neoterra projects
Questions

More questions about Eira

From AED 580k for a 348 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.02M.

Q2 2029, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 3 years.

271 homes on 8 floors: 174 studios of 346–418 sq ft and 97 1-bed flats of 635–834 sq ft.

About AED 40k a year for a studio and AED 63k for a 1-bed in Dubai Production City, a gross yield of about 8.6% Estimate.

Of Neoterra’s 2 projects on DLD’s record, 0 are finished. Of the 2 being built, none is past its planned date.

In Dubai Production City, 26 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 3.8 km away.

More nearby

How the numbers work

FromAED 580kSee it on the map