Skip to content

Ember at Park Five

Dubai Production CityDeyaar

FromAED 695kStudio · 433 sq ft

Ember at Park Five is an off-plan project by Deyaar in Dubai Production City, with 200 homes on 11 floors. DLD’s last inspection, on 26 Oct 2026, found it 18% built.

Built
18%
Handover
Q2 2027
Since launch
Up 9%Studio price per sq ft
Homes
200

Progress

18%built
  1. Q2 2025Building started
  2. May–Jul 2025Launch sales · 35
  3. Oct 2026Last inspection · 18%
  4. Q2 2027Planned handover

Prices

Price per sq ft

1,339 AED/sq ft113 sales in 12 months

Typical price by size

Studio
AED 695k433 sq ft · 1,606 AED/sq ft · 3 sales
1 bed
AED 1.09M813 sq ft · 1,351 AED/sq ft · 87 sales
2 beds
AED 1.55M1,388 sq ft · 1,131 AED/sq ft · 8 sales
3 beds
AED 2.37M1,777 sq ft · 1,314 AED/sq ft · 15 sales

Against 20 Dubai Production City off-plan projects with 10 or more sales

  • Lowest1,165AED/sq ft
  • Ember at Park Five1,339AED/sq ft
  • Typical1,445AED/sq ft
  • Highest1,650AED/sq ft

7th lowest of 20 · AED per sq ft in 12 months

Latest sales

Newest first
113 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Sep 2026 · 7 sales
7 Sep 20263 beds1,7771,339AED 2.38M
7 Sep 20263 beds2,0451,145AED 2.34M
7 Sep 20263 beds1,7771,273AED 2.26M
2 Sep 20263 beds1,7771,334AED 2.37M
2 Sep 20263 beds1,7771,329AED 2.36M
2 Sep 20261 bed8251,358AED 1.12M
2 Sep 20263 beds1,7771,319AED 2.34M
Aug 2026 · 1 sale
12 Aug 20262 beds1,4101,115AED 1.57M
Jun 2026 · 2 sales
18 Jun 20261 bed8171,439AED 1.18M
17 Jun 20263 beds1,7771,269AED 2.26M
May 2026 · 3 sales
12 May 20261 bed6891,353AED 932k
11 May 20261 bed8091,306AED 1.06M
11 May 20261 bed8241,305AED 1.08M
Apr 2026 · 9 sales
20 Apr 20261 bed6871,373AED 943k
16 Apr 20261 bed8131,441AED 1.17M
16 Apr 20263 beds1,8271,294AED 2.37M
10 Apr 20261 bed6871,458AED 1M
10 Apr 20263 beds1,8271,302AED 2.38M
9 Apr 20261 bed8091,457AED 1.18M
8 Apr 20261 bed8131,304AED 1.06M
7 Apr 20261 bed6871,445AED 993k
2 Apr 20261 bed8091,443AED 1.17M
Mar 2026 · 14 sales
30 Mar 20261 bed8241,432AED 1.18M
26 Mar 20261 bed8411,338AED 1.12M
26 Mar 20261 bed9431,225AED 1.15M
25 Mar 20261 bed8171,306AED 1.07M
24 Mar 20261 bed8751,188AED 1.04M
24 Mar 20261 bed8091,454AED 1.18M
24 Mar 20263 beds1,7771,324AED 2.35M
24 Mar 20263 beds1,8271,328AED 2.43M
24 Mar 20261 bed8241,321AED 1.09M
24 Mar 20261 bed8251,447AED 1.19M
17 Mar 20261 bed9401,225AED 1.15M
16 Mar 20261 bed6871,406AED 966k
9 Mar 20261 bed8171,338AED 1.09M
9 Mar 20261 bed8171,462AED 1.19M
Feb 2026 · 21 sales
24 Feb 20261 bed8171,451AED 1.19M
24 Feb 20261 bed8351,342AED 1.12M
24 Feb 20261 bed8091,468AED 1.19M
13 Feb 20263 beds1,8271,324AED 2.42M
13 Feb 20261 bed8241,323AED 1.09M
13 Feb 20261 bed8241,313AED 1.08M
13 Feb 20261 bed8171,321AED 1.08M
10 Feb 20261 bed8131,452AED 1.18M
10 Feb 20261 bed8171,451AED 1.19M
10 Feb 20261 bed8251,361AED 1.12M
10 Feb 20261 bed8091,352AED 1.09M
10 Feb 20263 beds1,8271,305AED 2.38M
10 Feb 20261 bed8091,271AED 1.03M
10 Feb 20261 bed8251,265AED 1.04M

Homes

200 homes by size

  • Studio6%11 homes · 433 sq ft · 1 layout
  • 1 bed58%116 homes · 687–940 sq ft · 6 layouts
  • 2 beds27%53 homes · 1,149–1,410 sq ft · 8 layouts
  • 3 beds10%20 homes · 1,777–2,045 sq ft · 3 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.35M

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)36min
  • Dubai Marina22min

By car. JBR Beach, the nearest beach, is 8.4 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding2.4 kmaway
  • Dwight SchoolInternational Baccalaureate · Good3.1 kmaway

Getting around

  • Dubai Production CityGold Line · opens 203213 minwalk
  • Al YalayisEtihad Rail3.7 kmaway
  • Jumeirah Golf EstatesRed Line4.0 kmaway
  • Al Maktoum AirportHigh-speed rail · planned16 kmaway
  • Al Maktoum InternationalDWC16 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%

Developer

  • 29 finished
  • 8 being built, on time
  • 2 past their planned date
Escrow bank
Dubai Islamic Bank
Legal name
Deyaar Development (P.J.S.C)

Also being built by Deyaar

Deyaar’s other projects
ProjectHandoverBuilt
Tria BY DeyaarSilicon OasisQ2 2025Past planned date94%
Mar CasaDubai Maritime CityQ4 2026Past planned date56%
Elm AT Park FiveDubai Production CityQ2 2027Being built16%
Neem AT Park FiveDubai Production CityQ4 2027Being built15%
Alder AT Park FiveDubai Production CityQ4 2027Being built6%
All 39 Deyaar projects
Questions

More questions about Ember at Park Five

From AED 695k for a 433 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.09M, 2-bed flats sell for about AED 1.55M and 3-bed flats sell for about AED 2.37M.

Q2 2027, the planned date in DLD’s register.

It is not past its planned date. It was 18% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.

200 homes on 11 floors: 11 studios of 433 sq ft, 116 1-bed flats of 687–940 sq ft, 53 2-bed flats of 1,149–1,410 sq ft and 20 3-bed flats of 1,777–2,045 sq ft.

0% for 1-bed flats, per sq ft. Against the launch sales of May 2025 – Jul 2025: studios up 9%, 2-bed flats 0%.

About AED 40k a year for a studio, AED 63k for a 1-bed, AED 90k for a 2-bed and AED 110k for a 3-bed in Dubai Production City, a gross yield of about 8.6% Estimate.

Of Deyaar’s 39 projects on DLD’s record, 29 are finished. Of the 10 being built, 2 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.35M.

In Dubai Production City, 27 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 4.0 km away.

More nearby

How the numbers work

FromAED 695kSee it on the map