Skip to content

Elm at Park Five

Dubai Production CityDeyaar

FromAED 681kStudio · 433 sq ft

Elm at Park Five is an off-plan project by Deyaar in Dubai Production City, with 526 homes on 11 floors. DLD’s last inspection, on 26 Oct 2026, found it 16% built.

Built
16%
Handover
Q2 2027
Since launch
Up 8%Studio price per sq ft
Homes
526

Progress

16%built
  1. Feb–Apr 2025Launch sales · 21
  2. Q2 2025Building started
  3. Oct 2026Last inspection · 16%
  4. Q2 2027Planned handover

Prices

Price per sq ft

1,329 AED/sq ft126 sales in 12 months

Typical price by size

Studio
AED 681k433 sq ft · 17 sales
1 bed
AED 1.07M815 sq ft · 95 sales
2 beds
AED 1.51M1,259 sq ft · 14 sales

Against 20 Dubai Production City off-plan projects with 10 or more sales

  • Lowest1,165AED/sq ft
  • Elm at Park Five1,329AED/sq ft
  • Typical1,445AED/sq ft
  • Highest1,650AED/sq ft

5th lowest of 20 · AED per sq ft in 12 months

Latest sales

Plus 1 newer sale, newest first
126 off-plan sales · Nov 2025 – Oct 2026, plus 1 newer sale · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
20 Nov 20262 beds New1,3161,064AED 1.4M
Aug 2026 · 4 sales
27 Aug 20261 bed8151,422AED 1.16M
26 Aug 20261 bed6861,363AED 935k
17 Aug 20262 beds1,2311,227AED 1.51M
17 Aug 20261 bed8231,326AED 1.09M
Jul 2026 · 2 sales
29 Jul 20262 beds1,2341,216AED 1.5M
24 Jul 2026Studio4401,555AED 684k
Jun 2026 · 4 sales
24 Jun 20261 bed8081,426AED 1.15M
24 Jun 2026Studio4421,436AED 635k
22 Jun 20261 bed1,1631,037AED 1.21M
19 Jun 20261 bed9151,091AED 998k
Apr 2026 · 5 sales
29 Apr 20261 bed1,1121,074AED 1.19M
16 Apr 20261 bed8231,302AED 1.07M
7 Apr 20261 bed8231,332AED 1.1M
7 Apr 20261 bed7791,307AED 1.02M
3 Apr 20261 bed8121,421AED 1.15M
Mar 2026 · 7 sales
24 Mar 20261 bed7721,348AED 1.04M
17 Mar 20261 bed1,1781,027AED 1.21M
16 Mar 20261 bed8231,273AED 1.05M
16 Mar 20262 beds1,7531,002AED 1.76M
16 Mar 20261 bed8121,424AED 1.16M
9 Mar 20261 bed7791,355AED 1.06M
9 Mar 20261 bed8221,404AED 1.15M
Feb 2026 · 13 sales
13 Feb 20261 bed8231,290AED 1.06M
12 Feb 20261 bed7721,289AED 995k
12 Feb 20261 bed9211,241AED 1.14M
12 Feb 20261 bed1,0231,169AED 1.2M
10 Feb 20261 bed8231,405AED 1.16M
10 Feb 20261 bed8231,370AED 1.13M
10 Feb 20261 bed8121,370AED 1.11M
9 Feb 20261 bed7351,444AED 1.06M
9 Feb 20261 bed9301,247AED 1.16M
9 Feb 20261 bed7791,344AED 1.05M
9 Feb 20261 bed7711,361AED 1.05M
3 Feb 20261 bed8221,404AED 1.15M
2 Feb 20261 bed8081,271AED 1.03M
Jan 2026 · 50 sales
30 Jan 20261 bed8121,429AED 1.16M
29 Jan 20261 bed8231,326AED 1.09M
29 Jan 20262 beds1,3161,118AED 1.47M
29 Jan 20261 bed8081,271AED 1.03M
28 Jan 20261 bed8081,255AED 1.01M
28 Jan 20261 bed8221,366AED 1.12M
26 Jan 20261 bed6951,441AED 1M
26 Jan 2026Studio4331,573AED 681k
20 Jan 2026Studio4331,573AED 681k
19 Jan 2026Studio4331,554AED 673k
19 Jan 20261 bed8081,310AED 1.06M
19 Jan 20261 bed8231,356AED 1.12M
19 Jan 20261 bed6871,458AED 1M
19 Jan 20261 bed8231,302AED 1.07M

Homes

526 homes by size

  • Studio30%157 homes · 424–462 sq ft · 4 layouts
  • 1 bed50%263 homes · 687–1,178 sq ft · 14 layouts
  • 2 beds20%106 homes · 1,224–1,819 sq ft · 9 layouts

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)36min
  • Dubai Marina22min

By car. JBR Beach, the nearest beach, is 8.3 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding2.5 kmaway
  • Dwight SchoolInternational Baccalaureate · Good3.1 kmaway

Getting around

  • Dubai Production CityGold Line · opens 203212 minwalk
  • Al YalayisEtihad Rail3.7 kmaway
  • Jumeirah Golf EstatesRed Line4.0 kmaway
  • Al Maktoum AirportHigh-speed rail · planned16 kmaway
  • Al Maktoum InternationalDWC16 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%

Developer

  • 29 finished
  • 8 being built, on time
  • 2 past their planned date
Escrow bank
Dubai Islamic Bank
Legal name
Deyaar Development (P.J.S.C)

Also being built by Deyaar

Deyaar’s other projects
ProjectHandoverBuilt
Tria BY DeyaarSilicon OasisQ2 2025Past planned date94%
Mar CasaDubai Maritime CityQ4 2026Past planned date56%
Ember AT Park FiveDubai Production CityQ2 2027Being built18%
Neem AT Park FiveDubai Production CityQ4 2027Being built15%
Alder AT Park FiveDubai Production CityQ4 2027Being built6%
All 39 Deyaar projects
Questions

More questions about Elm at Park Five

From AED 681k for a 433 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.07M and 2-bed flats sell for about AED 1.51M.

Q2 2027, the planned date in DLD’s register.

It is not past its planned date. It was 16% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.

526 homes on 11 floors: 157 studios of 424–462 sq ft, 263 1-bed flats of 687–1,178 sq ft and 106 2-bed flats of 1,224–1,819 sq ft.

Up 1% for 1-bed flats, per sq ft. Against the launch sales of Feb 2025 – Apr 2025: studios up 8%, 2-bed flats up 3%.

About AED 40k a year for a studio, AED 63k for a 1-bed and AED 90k for a 2-bed in Dubai Production City, a gross yield of about 8.6% Estimate.

Of Deyaar’s 39 projects on DLD’s record, 29 are finished. Of the 10 being built, 2 are past their planned date.

In Dubai Production City, 27 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 4.0 km away.

More nearby

How the numbers work

FromAED 681kSee it on the map