Skip to content

77 Boulevard by Bam

Jumeirah Village CircleBam

77 Boulevard by Bam is an off-plan project by Bam in Jumeirah Village Circle, with 58 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 18% built.

Built
18%
Handover
Q3 2026
Sales in 12 months
No sales
Homes
58

About

77 Boulevard is a 5-floor building of 58 homes in Jumeirah Village Circle. Most homes are 1-bed flats, with some 2-bed flats and a few studios and 3-bed flats, all fitted with kitchen appliances. Residents share a roof garden, an outdoor cinema and a jacuzzi, along with a pool and gym.

  • Mostly 1-bed flats
  • Roof garden
  • Outdoor cinema and jacuzzi

Shared facilities

  • Pool
  • Kids’ pool
  • Jacuzzi
  • Gym
  • Roof garden
  • Outdoor cinema
  • Golf area
  • BBQ area

Progress

18%built
  1. Q1 2025Building started
  2. Q3 2026Planned handover · passed
  3. Oct 2026Last inspection · 18%
2 months past the planned date

Homes

58 homes by size

  • Studio3%2 homes · 478–679 sq ft · 2 layouts
  • 1 bed62%36 homes · 741–1,389 sq ft · 18 layouts
  • 2 beds31%18 homes · 931–2,261 sq ft · 15 layouts
  • 3 beds3%2 homes · 2,160–2,279 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai28min
  • Dubai Airport (DXB)36min
  • Dubai Marina23min

By car. JBR Beach, the nearest beach, is 7.8 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding2.7 kmaway
  • Dwight SchoolInternational Baccalaureate · Good3.2 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 203222 minwalk
  • Al YalayisEtihad Rail4.6 kmaway
  • Jumeirah Golf EstatesRed Line4.9 kmaway
  • Al Maktoum AirportHigh-speed rail · planned17 kmaway
  • Al Maktoum InternationalDWC17 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 1 past their planned date
Escrow bank
United Bank Limited
Legal name
Bam Real Estate Development L.L.C
Questions

More questions about 77 Boulevard by Bam

Q3 2026, the planned date in DLD’s register.

No. It is 2 months past its planned date, and was 18% built at DLD’s last inspection on 26 Oct 2026.

58 homes on 5 floors: 2 studios of 478–679 sq ft, 36 1-bed flats of 741–1,389 sq ft, 18 2-bed flats of 931–2,261 sq ft and 2 3-bed flats of 2,160–2,279 sq ft.

About AED 48k a year for a studio, AED 71k for a 1-bed, AED 100k for a 2-bed and AED 143k for a 3-bed in JVC, a gross yield of about 7.3% Estimate.

Of Bam’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, 1 is past its planned date.

In Jumeirah Village Circle, 28 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 4.9 km away.

More nearby

How the numbers work