Amana Jewels
LiwanAmana
Amana Jewels is an off-plan project by Amana in Liwan, with 21 homes on 5 floors. DLD’s last inspection found it 22% built.
- Built
- 22%
- Handover
- Q4 2025
- Sales in 12 months
- No sales
- Homes
- 21
Progress
- Q2 2024Building started
- Q4 2025Planned handover · passed
- Jun 2026Last inspection · 22%
DLD updates % built after each inspection, so work on site can be further along than this figure.
Homes
21 homes by size
- 1 bed19%4 homes · 701 sq ft · 1 layout
- 2 beds76%16 homes · 1,231–1,424 sq ft · 2 layouts
- 3 beds5%1 home · 3,485 sq ft · 1 layout
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)26min
- Dubai Marina34min
By car. Jumeirah Open Beach, the nearest beach, is 16.8 km away.
Rated schools
- GEMS Wellington Academy -FzeUK · Very good3.4 kmaway
Getting around
- Dubai Silicon OasisBlue Line · opens 20293.7 kmaway
- MeydanEtihad Rail · planned8.8 kmaway
- CreekGreen Line13 kmaway
- Al JaddafHigh-speed rail · planned14 kmaway
- Dubai InternationalDXB17 kmaway
Area guideLiwanFinished homesAED 851/sq ft1-bed rentAED 55k/yrGross yieldEstimate8.8%Developer
- 2 not started
- Escrow bank
- Mashreq Bank
- Legal name
- Amana Real Estate Development L.L.C
More by Amana
| Project | Handover | Built |
|---|---|---|
| Amana GardensLiwan | Q4 2025Not started | 0% |
More questions about Amana Jewels
Q4 2025, the planned date in DLD’s register.
No. It is 11 months past its planned date, and was 22% built at DLD’s last inspection.
21 homes on 5 floors: 4 1-bed flats of 701 sq ft, 16 2-bed flats of 1,231–1,424 sq ft and 1 3-bed of 3,485 sq ft.
About AED 55k a year for a 1-bed, AED 78k for a 2-bed and AED 93k for a 3-bed in Liwan, a gross yield of about 8.8% Estimate.
Of Amana’s 2 projects on DLD’s record, 0 are finished.
In Liwan, 27 minutes by car to Downtown Dubai and 26 to Dubai Airport (DXB). Creek Metro station on the Green Line is 13 km away.
More nearby
Off-plan nearby
- Parkgreen Residences by AlishaanFrom AED 830k4% built · Planned Q2 2028
- Symbolic AltusFrom AED 1.03M1% built · Planned Q2 2027
- Confident PrestonNo sales0% built · Planned Q2 2028
- Alma GardensFrom AED 1.02M50% built · Past planned date
- Viani by MeteoraNo sales0% built · Planned Q2 2027
- Reem by visionFrom AED 565k70% built · Planned Q4 2026