Arib Collection

Dubai Land Residence ComplexArib

Arib Collection is an off-plan project by Arib in Dubai Land Residence Complex, with 49 homes on 8 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q4 2027
Sales in 12 months
2
Homes
49

Progress

0%built
  1. Q4 2025Building started
  2. Oct 2026Last inspection · 0%
  3. Q4 2027Planned handover

Prices

Typical price by size

Typical price by size · Nov 2025 – Oct 2026
SizeTypical priceAED/sq ftSales
StudioNot enough sales1
2 bedsNot enough sales1

Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales

  • Lowest810AED/sq ft
  • Typical1,386AED/sq ft
  • Arib Collection1,523AED/sq ft
  • Highest1,737AED/sq ft

Latest sales

Newest first
2 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Jul 2026 · 1 sale
9 Jul 2026Studio4891,372AED 671k
Dec 2025 · 1 sale
11 Dec 20252 beds1,3621,674AED 2.28M

Homes

49 homes by size

  • Studio20%10 homes · 459–489 sq ft · 2 layouts
  • 1 bed47%23 homes · 792–850 sq ft · 3 layouts
  • 2 beds33%16 homes · 1,299–1,362 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai28min
  • Dubai Airport (DXB)29min
  • Dubai Marina37min

By car. Jumeirah Open Beach, the nearest beach, is 18.4 km away.

Rated schools

  • GEMS Wellington Academy -FzeUK · Very good2.6 kmaway

Getting around

  • Academic CityBlue Line · opens 20292.7 kmaway
  • MeydanEtihad Rail · planned10 kmaway
  • CreekGreen Line14 kmaway
  • Al JaddafHigh-speed rail · planned15 kmaway
  • Dubai InternationalDXB17 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%

Developer

  • 1 finished
  • 1 being built, on time
Escrow bank
Commercial Bank of Dubai
Legal name
Arib Properties For Real Estate Development L.L.C

More by Arib

Arib’s other projects
ProjectHandoverBuilt
Lumina Vista ResidencesJVCQ4 2024Finished
All 2 Arib projects
Questions

More questions about Arib Collection

Q4 2027, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.

49 homes on 8 floors: 10 studios of 459–489 sq ft, 23 1-bed flats of 792–850 sq ft and 16 2-bed flats of 1,299–1,362 sq ft.

About AED 40k a year for a studio, AED 56k for a 1-bed and AED 73k for a 2-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.

Of Arib’s 2 projects on DLD’s record, 1 are finished. Of the 1 being built, none is past its planned date.

In Dubai Land Residence Complex, 28 minutes by car to Downtown Dubai and 29 to Dubai Airport (DXB). Creek Metro station on the Green Line is 14 km away.

More nearby

How the numbers work