Izel by Zoya
Dubai Land Residence ComplexZoya
Izel by Zoya is an off-plan project by Zoya in Dubai Land Residence Complex, with 165 homes on 11 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q3 2028
- Sales in 12 months
- 34
- Homes
- 165
Progress
- Q3 2026Building started
- Oct 2026Last inspection · 0%
- Q3 2028Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 674k384 sq ft · 1,795 AED/sq ft · 24 sales
- 1 bed
- AED 1.14M777 sq ft · 1,445 AED/sq ft · 6 sales
- 2 beds
- AED 1.58M1,113 sq ft · 1,415 AED/sq ft · 4 sales
Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales
- Lowest810AED/sq ft
- Typical1,386AED/sq ft
- Izel by Zoya1,735AED/sq ft
- Highest1,737AED/sq ft
2nd highest of 72 · AED per sq ft in 12 months
Latest sales
Plus 1 newer sale, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 2 Nov 2026 | 1 bed New | 746 | 1,495 | AED 1.12M |
| Oct 2026 · 1 sale | ||||
| 29 Oct 2026 | Studio | 381 | 1,266 | AED 482k |
| Sep 2026 · 2 sales | ||||
| 21 Sep 2026 | 1 bed | 860 | 1,360 | AED 1.17M |
| 9 Sep 2026 | Studio | 394 | 1,235 | AED 487k |
| Aug 2026 · 31 sales | ||||
| 31 Aug 2026 | 1 bed | 860 | 1,451 | AED 1.25M |
| 31 Aug 2026 | 2 beds | 1,113 | 1,404 | AED 1.56M |
| 31 Aug 2026 | Studio | 384 | 1,750 | AED 672k |
| 31 Aug 2026 | Studio | 381 | 1,715 | AED 653k |
| 31 Aug 2026 | Studio | 382 | 1,802 | AED 688k |
| 31 Aug 2026 | Studio | 349 | 1,923 | AED 671k |
| 31 Aug 2026 | Studio | 390 | 1,851 | AED 722k |
| 31 Aug 2026 | Studio | 401 | 1,796 | AED 720k |
| 31 Aug 2026 | Studio | 502 | 1,318 | AED 662k |
| 31 Aug 2026 | Studio | 384 | 1,802 | AED 692k |
| 31 Aug 2026 | Studio | 393 | 1,720 | AED 676k |
| 31 Aug 2026 | 1 bed | 748 | 1,437 | AED 1.08M |
| 31 Aug 2026 | Studio | 349 | 1,897 | AED 662k |
| 31 Aug 2026 | 2 beds | 1,128 | 1,426 | AED 1.61M |
| 31 Aug 2026 | 1 bed | 746 | 1,461 | AED 1.09M |
| 31 Aug 2026 | Studio | 393 | 1,789 | AED 703k |
| 31 Aug 2026 | Studio | 381 | 1,708 | AED 651k |
| 31 Aug 2026 | Studio | 349 | 1,848 | AED 645k |
| 31 Aug 2026 | 2 beds | 1,113 | 1,431 | AED 1.59M |
| 31 Aug 2026 | Studio | 381 | 1,850 | AED 705k |
| 31 Aug 2026 | Studio | 376 | 1,710 | AED 643k |
| 31 Aug 2026 | Studio | 401 | 1,823 | AED 731k |
| 31 Aug 2026 | Studio | 401 | 1,815 | AED 728k |
| 31 Aug 2026 | Studio | 401 | 1,760 | AED 706k |
| 31 Aug 2026 | 1 bed | 748 | 1,524 | AED 1.14M |
| 31 Aug 2026 | Studio | 383 | 1,817 | AED 696k |
| 31 Aug 2026 | 2 beds | 1,113 | 1,365 | AED 1.52M |
| 31 Aug 2026 | Studio | 390 | 1,795 | AED 700k |
| 31 Aug 2026 | Studio | 349 | 1,837 | AED 641k |
| 31 Aug 2026 | Studio | 376 | 1,757 | AED 660k |
| 31 Aug 2026 | 1 bed | 806 | 1,406 | AED 1.13M |
Homes
165 homes by size
- Studio73%121 homes · 349–502 sq ft · 7 layouts
- 1 bed20%33 homes · 748–860 sq ft · 4 layouts
- 2 beds7%11 homes · 1,113–1,128 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai28min
- Dubai Airport (DXB)29min
- Dubai Marina37min
By car. Jumeirah Open Beach, the nearest beach, is 18.6 km away.
Rated schools
- GEMS Wellington Academy -FzeUK · Very good2.7 kmaway
Getting around
- Academic CityBlue Line · opens 20292.7 kmaway
- MeydanEtihad Rail · planned10 kmaway
- CreekGreen Line14 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB18 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%Developer
- 6 being built, on time
- 3 not started
- Escrow bank
- Not on record
- Legal name
- Zoya One Real Estate Developments L.L.C
Also being built by Zoya
| Project | Handover | Built |
|---|---|---|
| Pristine By ZoyaAl Furjan | Q1 2027Being built | 58% |
| Elanora by zoyaDubai Industrial City | Q1 2028Being built | 0% |
| ElinorDubai South | Q2 2028Being built | 0% |
| Nuve By ZoyaDubai Land Residence Complex | Q2 2028Being built | 1% |
| Loriza by ZoyaDubai South | Q4 2028Being built | 0% |
More questions about Izel by Zoya
From AED 674k for a 384 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.14M and 2-bed flats sell for about AED 1.58M.
Q3 2028, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 22 months.
165 homes on 11 floors: 121 studios of 349–502 sq ft, 33 1-bed flats of 748–860 sq ft and 11 2-bed flats of 1,113–1,128 sq ft.
About AED 40k a year for a studio, AED 56k for a 1-bed and AED 73k for a 2-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.
Of Zoya’s 9 projects on DLD’s record, 0 are finished. Of the 6 being built, none is past its planned date.
In Dubai Land Residence Complex, 28 minutes by car to Downtown Dubai and 29 to Dubai Airport (DXB). Creek Metro station on the Green Line is 14 km away.
More nearby
Off-plan nearby
- Wadi Hills by HreFrom AED 1.59M8% built · Planned Q1 2028
- GFS Coventry Gardens IIFrom AED 640k1% built · Planned Q4 2027
- A 99From AED 1.29M48% built · Planned Q4 2026
- Arib CollectionNo sales0% built · Planned Q4 2027
- Verdania 1From AED 713k17% built · Planned Q1 2027
- Elan TowerNo sales0% built · Planned Q1 2029
Finished buildings nearby
Typical next door AED 982/sq ft · 6 buildings within a 10-minute walk
- Phoenix Tower831AED/sq ftNot enough rents · 10-minute walk
- Blue Wave953AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Shorooq Land 21,301AED/sq ft1-bed rent AED 55k/yr · 10-minute walk
- Edison House1,010AED/sq ftNot enough rents · 10-minute walk
- Time 11,222AED/sq ft1-bed rent AED 55k/yr · 10-minute walk
- Durar 1945AED/sq ft1-bed rent AED 57k/yr · 10-minute walk
- Sky Courts724AED/sq ft1-bed rent AED 50k/yr
- The V Tower1,012AED/sq ft1-bed rent AED 60k/yr
- Desert Sun Tower827AED/sq ft1-bed rent AED 57k/yr
- K1953AED/sq ft1-bed rent AED 56k/yr
