Skip to content

Aspirz by Danube

Dubai Sports CityDanube

FromAED 870kStudio · 389 sq ft

Aspirz by Danube is an off-plan project by Danube in Dubai Sports City, with 516 homes on 18 floors. DLD’s last inspection, on 26 Oct 2026, found it 5% built.

Built
5%
Handover
Q4 2028
Sales in 12 months
262
Homes
516

About

Aspirz is an 18-floor building of 326 homes in Dubai Sports City, close to Al Khail Road, with offices behind a separate entrance. Most homes are 1-bed flats, with studios and a few 2-bed and 3-bed flats, all furnished with layouts that can add a room. Its shared spaces include a content creation studio, a golf simulator and a cricket court.

  • Homes and offices, separate entrances
  • Furnished flats that add a room
  • Golf simulator and cricket court

Shared facilities

  • Infinity pool
  • Indoor and outdoor gyms
  • Padel and tennis courts
  • Basketball court
  • Cricket court
  • Golf simulator
  • Indoor cinema
  • Content creation studio
Open brochure

Progress

5%built
  1. Q4 2025Building started
  2. Oct 2026Last inspection · 5%
  3. Q4 2028Planned handover

Prices

Price per sq ft

2,198 AED/sq ft262 sales in 12 months

Typical price by size

Studio
AED 870k389 sq ft · 2,251 AED/sq ft · 118 sales
1 bed
AED 1.32M704 sq ft · 1,908 AED/sq ft · 135 sales
2 beds
AED 2.02M988 sq ft · 2,041 AED/sq ft · 7 sales
3 beds
Not enough sales2 sales

Against 15 Dubai Sports City off-plan projects with 10 or more sales

  • Lowest900AED/sq ft
  • Typical1,429AED/sq ft
  • Aspirz by Danube2,198AED/sq ft

Highest of 15 · AED per sq ft in 12 months

Danube’s own price starts at AED 879k. DLD’s AED 870k is the lowest typical price paid in the 12 months.

Latest sales

Plus 6 newer sales, newest first
262 off-plan sales · Nov 2025 – Oct 2026, plus 6 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
20 Nov 20261 bed New7911,932AED 1.53M
15 Nov 20261 bed New4962,357AED 1.17M
5 Nov 2026Studio New3892,423AED 942k
3 Nov 20261 bed New4802,313AED 1.11M
3 Nov 20262 beds New8512,350AED 2M
2 Nov 2026Studio New3892,415AED 939k
Oct 2026 · 11 sales
29 Oct 2026Studio3892,301AED 895k
26 Oct 20261 bed4802,327AED 1.12M
26 Oct 2026Studio3892,252AED 876k
22 Oct 20262 beds1,0122,092AED 2.12M
22 Oct 20261 bed7041,864AED 1.31M
20 Oct 20261 bed7922,054AED 1.63M
20 Oct 2026Studio3892,216AED 862k
14 Oct 2026Studio3892,308AED 898k
12 Oct 20261 bed7911,869AED 1.48M
8 Oct 2026Studio3832,225AED 852k
6 Oct 2026Studio3882,284AED 886k
Sep 2026 · 9 sales
28 Sep 20261 bed7501,943AED 1.46M
28 Sep 20261 bed7041,872AED 1.32M
24 Sep 20261 bed7491,956AED 1.47M
16 Sep 2026Studio3892,187AED 851k
15 Sep 20261 bed7921,907AED 1.51M
15 Sep 20261 bed7041,750AED 1.23M
14 Sep 2026Studio3892,177AED 847k
3 Sep 20261 bed4732,093AED 990k
1 Sep 20261 bed7041,875AED 1.32M
Aug 2026 · 1 sale
20 Aug 20261 bed4802,354AED 1.13M
Jul 2026 · 8 sales
31 Jul 20261 bed4732,120AED 1M
31 Jul 20261 bed4732,151AED 1.02M
30 Jul 20261 bed4732,159AED 1.02M
30 Jul 2026Studio3942,538AED 1M
30 Jul 20261 bed4802,321AED 1.11M
29 Jul 2026Studio3882,577AED 1M
27 Jul 20261 bed7501,899AED 1.42M
13 Jul 2026Studio3892,162AED 841k
Jun 2026 · 1 sale
26 Jun 2026Studio3892,126AED 827k
May 2026 · 3 sales
18 May 2026Studio3892,245AED 873k
11 May 2026Studio3832,196AED 841k
4 May 2026Studio3832,305AED 883k
Apr 2026 · 5 sales
13 Apr 2026Studio3762,273AED 855k
13 Apr 2026Studio3942,282AED 899k
8 Apr 20261 bed4802,235AED 1.07M
6 Apr 20261 bed7491,851AED 1.39M
6 Apr 20261 bed7041,872AED 1.32M
Mar 2026 · 8 sales
26 Mar 2026Studio3892,272AED 884k
24 Mar 20261 bed7041,858AED 1.31M
24 Mar 20261 bed7491,964AED 1.47M
24 Mar 2026Studio3832,198AED 842k
19 Mar 20261 bed4802,224AED 1.07M
17 Mar 2026Studio3832,216AED 849k

Homes

516 homes by size

  • Studio39%126 homes · 376–394 sq ft · 4 layouts
  • 1 bed56%182 homes · 473–791 sq ft · 7 layouts
  • 2 beds4%12 homes · 850–1,012 sq ft · 3 layouts
  • 3 beds2%6 homes · 1,315–1,329 sq ft · 2 layouts

30/60 payment plan

Payments go to the project’s escrow account at First Abu Dhabi Bank.

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 2.06M

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)36min
  • Dubai Marina23min

By car. JBR Beach, the nearest beach, is 8.5 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding1.9 kmaway
  • Dwight SchoolInternational Baccalaureate · Good2.5 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 203224 minwalk
  • Al YalayisEtihad Rail4.8 kmaway
  • Jumeirah Golf EstatesRed Line5.1 kmaway
  • Al Maktoum AirportHigh-speed rail · planned17 kmaway
  • Al Maktoum InternationalDWC17 kmaway
Area guideDubai Sports CityFinished homesAED 950/sq ft1-bed rentAED 60k/yrGross yieldEstimate8.5%

Developer

  • 19 finished
  • 18 being built, on time
  • 4 past their planned date
Escrow bank
First Abu Dhabi Bank
Legal name
Danube Properties Development L.L.C

Also being built by Danube

Danube’s other projects
ProjectHandoverBuilt
Elitz By DanubeJVCQ4 2025Past planned date92%
Sportz By DanubeDubai Sports CityQ1 2026Past planned date80%
Viewz 1 By DanubeJLTQ2 2026Past planned date66%
Viewz 2 By DanubeJLTQ2 2026Past planned date65%
Oasiz 1 by DanubeSilicon OasisQ4 2027Being built30%
All 41 Danube projects
Questions

More questions about Aspirz by Danube

From AED 870k for a 389 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.32M and 2-bed flats sell for about AED 2.02M.

30/60, Danube’s plan. Payments go to the project’s escrow account at First Abu Dhabi Bank.

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 5% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.

516 homes on 18 floors: 126 studios of 376–394 sq ft, 182 1-bed flats of 473–791 sq ft, 12 2-bed flats of 850–1,012 sq ft and 6 3-bed flats of 1,315–1,329 sq ft.

About AED 42k a year for a studio, AED 60k for a 1-bed, AED 83k for a 2-bed and AED 110k for a 3-bed in Dubai Sports City, a gross yield of about 8.5% Estimate.

Of Danube’s 41 projects on DLD’s record, 19 are finished. Of the 22 being built, 4 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 2.06M.

In Dubai Sports City, 27 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 5.1 km away.

More nearby

How the numbers work

FromAED 870kSee it on the map