Skip to content

Beverly Crown

Jumeirah Village CircleHMB Homes

Beverly Crown is an off-plan project by HMB Homes in Jumeirah Village Circle, with 214 homes on 13 floors. DLD’s last inspection, on 23 Jun 2026, found it 0% built.

Built
0%
Handover
Q4 2028
Sales in 12 months
No sales
Homes
214

Progress

0%built
  1. Jun 2026Last inspection · 0%
  2. Q4 2026Building started
  3. Q4 2028Planned handover

DLD updates % built after each inspection, so work on site can be further along than this figure.

Prices

Price per sq ft

1,426 AED/sq ft7 sales in 12 months

Typical price by size

Studio
AED 670k442 sq ft · 1,515 AED/sq ft · 3 sales
1 bed
AED 1.12M791 sq ft · 1,426 AED/sq ft · 3 sales
2 beds
Not enough sales1 sale

Against 99 JVC off-plan projects with 10 or more sales

  • Lowest825AED/sq ft
  • Beverly Crown1,426AED/sq ft
  • Typical1,497AED/sq ft
  • Highest2,276AED/sq ft

Latest sales

No sales in 12 months, plus 10 newer sales, newest first
0 off-plan sales · Nov 2025 – Oct 2026, plus 10 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
18 Nov 2026Studio New4221,493AED 630k
18 Nov 2026Studio New4571,597AED 730k
6 Nov 2026Studio New4221,455AED 614k
6 Nov 2026Studio New4421,457AED 644k
6 Nov 2026Studio New4551,604AED 730k
6 Nov 20261 bed New8371,332AED 1.11M
3 Nov 2026Studio New4421,810AED 800k
3 Nov 20261 bed New7911,423AED 1.13M
2 Nov 20261 bed New8371,015AED 849k
2 Nov 20262 beds New1,363978AED 1.33M
Oct 2026 · 6 sales
28 Oct 2026Studio4421,343AED 593k
28 Oct 20261 bed7861,426AED 1.12M
28 Oct 20262 beds1,3631,127AED 1.54M
7 Oct 20261 bed7911,444AED 1.14M
7 Oct 2026Studio4341,565AED 679k
1 Oct 2026Studio4421,516AED 670k
Sep 2026 · 1 sale
24 Sep 20261 bed7911,369AED 1.08M

Homes

214 homes by size

  • Studio31%66 homes · 422–455 sq ft · 4 layouts
  • 1 bed64%134 homes · 716–896 sq ft · 7 layouts
  • 2 beds4%9 homes · 1,347–1,363 sq ft · 2 layouts
  • 3 beds1%2 homes · 2,341 sq ft · 1 layout

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)35min
  • Dubai Marina21min

By car. JBR Beach, the nearest beach, is 8.1 km away.

Rated schools

  • JSS International SchoolIndian · Very good1.6 kmaway
  • Nord Anglia International SchoolUK · Outstanding1.7 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 203210 minwalk
  • Dubai Internet CityRed Line5.7 kmaway
  • Al YalayisEtihad Rail6.5 kmaway
  • Al Maktoum AirportHigh-speed rail · planned19 kmaway
  • Al Maktoum InternationalDWC19 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 3 finished
  • 4 being built, on time
Escrow bank
Not on record
Legal name
H M B Homes Real Estate Development

More by HMB Homes

HMB Homes’ other projects
ProjectHandoverBuilt
One BeverlyArjanQ4 2026Being built73%
Beverly ParkDubai Land Residence ComplexQ4 2027Being built7%
Beverly GrandeMotor CityQ4 2027Being built0%
Beverly BoulevardArjanQ3 2024Finished
Beverly ResidenceJVCQ1 2021Finished
All 7 HMB Homes projects
Questions

More questions about Beverly Crown

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 23 Jun 2026, with handover planned in 2 years.

214 homes on 13 floors: 66 studios of 422–455 sq ft, 134 1-bed flats of 716–896 sq ft, 9 2-bed flats of 1,347–1,363 sq ft and 2 3-bed flats of 2,341 sq ft.

About AED 48k a year for a studio, AED 71k for a 1-bed, AED 100k for a 2-bed and AED 143k for a 3-bed in JVC, a gross yield of about 7.3% Estimate.

Of HMB Homes’ 7 projects on DLD’s record, 3 are finished. Of the 4 being built, none is past its planned date.

In Jumeirah Village Circle, 26 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Dubai Internet City Metro station on the Red Line is 5.7 km away.

More nearby

How the numbers work