Skip to content

Sol Terra Casa II

Jumeirah Village CircleSOL

Sol Terra Casa II is an off-plan project by SOL in Jumeirah Village Circle, with 11 homes on 3 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q2 2028
Sales in 12 months
No sales
Homes
11

About

Sol Terra Casa II is a community of townhouses in District 11 of Jumeirah Village Circle, set around a shared podium. Every home is a 4-bed townhouse with a private lift and a plunge pool on its roof. The podium holds an outdoor cinema, a pet garden and a spa, with a pool and jacuzzi beside a running track.

  • 4-bed townhouses
  • Private lift and rooftop plunge pool
  • District 11 of JVC

Shared facilities

  • Pool
  • Kids’ pool
  • Jacuzzi
  • Spa
  • Indoor gym
  • Yoga studio
  • Outdoor cinema
  • Pet garden

Progress

0%built
  1. Q2 2026Building started
  2. Oct 2026Last inspection · 0%
  3. Q2 2028Planned handover

Location

Drive times

  • Downtown Dubai26min
  • Dubai Airport (DXB)35min
  • Dubai Marina21min

By car. JBR Beach, the nearest beach, is 8.2 km away.

Rated schools

  • Nord Anglia International SchoolUK · Outstanding1.6 kmaway
  • JSS International SchoolIndian · Very good1.7 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 20328 minwalk
  • Dubai Internet CityRed Line5.9 kmaway
  • Al YalayisEtihad Rail6.5 kmaway
  • Al Maktoum AirportHigh-speed rail · planned19 kmaway
  • Al Maktoum InternationalDWC19 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 6 finished
  • 5 being built, on time
  • 1 not started
Escrow bank
Not on record
Legal name
S O L Properties Development L.L.C

More by SOL

SOL’s other projects
ProjectHandoverBuilt
Solara Tower DubaiDowntown DubaiQ3 2027Being built21%
SOL TERRA CASA IJVCQ2 2028Being built0%
Sol LevanteJumeirah Village TriangleQ3 2028Being built7%
Sol LuxeDowntown DubaiQ1 2029Being built2%
SOL BEACHPalm JumeirahQ4 2030Not startedNot on record
All 12 SOL projects
Questions

More questions about Sol Terra Casa II

Q2 2028, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 19 months.

About AED 48k a year for a studio, AED 71k for a 1-bed, AED 100k for a 2-bed, AED 143k for a 3-bed and AED 155k for a 4+ bed in JVC, a gross yield of about 7.3% Estimate.

Of SOL’s 12 projects on DLD’s record, 6 are finished. Of the 5 being built, none is past its planned date.

In Jumeirah Village Circle, 26 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Dubai Internet City Metro station on the Red Line is 5.9 km away.

More nearby

How the numbers work