Binghatti Luxuria
Jumeirah Village TriangleBinghatti
Binghatti Luxuria is an off-plan project by Binghatti in Jumeirah Village Triangle, with 457 homes on 24 floors. DLD’s last inspection, on 26 Oct 2026, found it 7% built.
- Built
- 7%
- Handover
- Q3 2027
- Sales in 12 months
- 210
- Payment plan
- 20/50/30
- Homes
- 457
About
Binghatti Luxuria is a 24-floor building of 457 homes in Jumeirah Village Triangle, close to Sheikh Mohammed Bin Zayed Road and Al Khail Road. Almost half the homes are studios, with 1-bed flats and a few 2-bed flats, and some have open-air terraces facing the skyline. The building also has shops, and Dubai Production City and Al Maktoum Airport are within easy reach.
- Open-air terraces
- Near Al Khail Road
- Studios to 2-bed flats
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 7%
- Q3 2027Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 782k337 sq ft · 2,320 AED/sq ft · 98 sales
- 1 bed
- AED 1.26M687 sq ft · 1,815 AED/sq ft · 94 sales
- 2 beds
- AED 1.83M963 sq ft · 1,898 AED/sq ft · 18 sales
Against 26 Jumeirah Village Triangle off-plan projects with 10 or more sales
- Lowest1,251AED/sq ft
- Typical1,604AED/sq ft
- Binghatti Luxuria1,950AED/sq ft
Highest of 26 · AED per sq ft in 12 months
Binghatti’s own price starts at AED 767k. DLD’s AED 782k is the lowest typical price paid in the 12 months.
Latest sales
Plus 32 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 19 Nov 2026 | Studio New | 338 | 2,071 | AED 700k |
| 19 Nov 2026 | Studio New | 336 | 2,158 | AED 725k |
| 19 Nov 2026 | Studio New | 336 | 2,286 | AED 768k |
| 19 Nov 2026 | Studio New | 336 | 2,301 | AED 773k |
| 19 Nov 2026 | Studio New | 338 | 2,293 | AED 775k |
| 19 Nov 2026 | Studio New | 336 | 2,336 | AED 785k |
| 19 Nov 2026 | Studio New | 338 | 2,334 | AED 789k |
| 19 Nov 2026 | Studio New | 338 | 2,340 | AED 791k |
| 19 Nov 2026 | Studio New | 338 | 2,343 | AED 792k |
| 19 Nov 2026 | Studio New | 338 | 2,343 | AED 792k |
| 19 Nov 2026 | Studio New | 338 | 2,346 | AED 793k |
| 17 Nov 2026 | 1 bed New | 651 | 1,843 | AED 1.2M |
| 16 Nov 2026 | Studio New | 336 | 2,304 | AED 774k |
| 16 Nov 2026 | Studio New | 338 | 2,293 | AED 775k |
| 16 Nov 2026 | 1 bed New | 651 | 1,575 | AED 1.03M |
| 16 Nov 2026 | 1 bed New | 651 | 1,613 | AED 1.05M |
| 16 Nov 2026 | 1 bed New | 651 | 1,690 | AED 1.1M |
| 15 Nov 2026 | 1 bed New | 651 | 1,536 | AED 1M |
| 13 Nov 2026 | Studio New | 338 | 2,284 | AED 772k |
| 11 Nov 2026 | Studio New | 337 | 2,226 | AED 750k |
| 10 Nov 2026 | 1 bed New | 738 | 1,874 | AED 1.38M |
| 9 Nov 2026 | Studio New | 337 | 2,374 | AED 800k |
| 5 Nov 2026 | Studio New | 336 | 2,351 | AED 790k |
| 5 Nov 2026 | 1 bed New | 658 | 1,748 | AED 1.15M |
| 4 Nov 2026 | Studio New | 337 | 2,077 | AED 700k |
| 4 Nov 2026 | Studio New | 338 | 2,219 | AED 750k |
| 4 Nov 2026 | Studio New | 336 | 2,342 | AED 787k |
| 4 Nov 2026 | Studio New | 338 | 2,352 | AED 795k |
| 3 Nov 2026 | 1 bed New | 658 | 1,672 | AED 1.1M |
| 2 Nov 2026 | Studio New | 338 | 2,320 | AED 784k |
| 1 Nov 2026 | Studio New | 337 | 2,226 | AED 750k |
| 1 Nov 2026 | Studio New | 336 | 2,339 | AED 786k |
| Oct 2026 · 39 sales | ||||
| 30 Oct 2026 | Studio | 338 | 2,334 | AED 789k |
| 30 Oct 2026 | 1 bed | 658 | 1,748 | AED 1.15M |
| 29 Oct 2026 | 1 bed | 755 | 1,325 | AED 1M |
| 20 Oct 2026 | Studio | 337 | 2,226 | AED 750k |
| 20 Oct 2026 | 1 bed | 755 | 1,523 | AED 1.15M |
| 14 Oct 2026 | 1 bed | 755 | 1,612 | AED 1.22M |
| 14 Oct 2026 | 1 bed | 651 | 1,613 | AED 1.05M |
| 14 Oct 2026 | 1 bed | 658 | 1,748 | AED 1.15M |
| 14 Oct 2026 | 1 bed | 651 | 1,656 | AED 1.08M |
| 14 Oct 2026 | Studio | 338 | 2,219 | AED 750k |
| 13 Oct 2026 | Studio | 362 | 2,144 | AED 776k |
| 12 Oct 2026 | Studio | 338 | 2,346 | AED 793k |
| 12 Oct 2026 | 1 bed | 652 | 1,610 | AED 1.05M |
| 12 Oct 2026 | 1 bed | 651 | 1,777 | AED 1.16M |
| 9 Oct 2026 | Studio | 337 | 2,341 | AED 789k |
| 9 Oct 2026 | Studio | 336 | 2,083 | AED 700k |
| 7 Oct 2026 | 1 bed | 651 | 1,922 | AED 1.25M |
| 7 Oct 2026 | 1 bed | 651 | 1,959 | AED 1.27M |
Homes
457 homes by size
- Studio47%213 homes · 338–430 sq ft · 3 layouts
- 1 bed43%195 homes · 651–852 sq ft · 7 layouts
- 2 beds11%49 homes · 963–1,859 sq ft · 3 layouts
Payment plan
Binghatti’s project page- 20%On booking
- 50%During construction
- 30%On handover
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)36min
- Dubai Marina20min
By car. JBR Beach, the nearest beach, is 7.2 km away.
Rated schools
- Victory Heights Primary SchoolUK · Outstanding3.4 kmaway
- Dwight SchoolInternational Baccalaureate · Good4.0 kmaway
Getting around
- Dubai Production CityGold Line · opens 203219 minwalk
- Al YalayisEtihad Rail3.5 kmaway
- Jumeirah Golf EstatesRed Line3.8 kmaway
- Al Maktoum AirportHigh-speed rail · planned16 kmaway
- Al Maktoum InternationalDWC16 kmaway
Area guideJumeirah Village TriangleFinished homesAED 1,337/sq ft1-bed rentAED 72k/yrGross yieldEstimate7.5%Developer
- 43 finished
- 21 being built, on time
- 15 past their planned date
- 5 not started
- Escrow bank
- Not on record
- Legal name
- Binghatti Developers FZE
Also being built by Binghatti
| Project | Handover | Built |
|---|---|---|
| Bugatti Residences by BinghattiBusiness Bay | Q4 2025Past planned date | 66% |
| Binghatti AmberhallJVC | Q1 2026Past planned date | 38% |
| Binghatti RubyJVC | Q1 2026Past planned date | 46% |
| Binghatti HavenDubai Sports City | Q1 2026Past planned date | 76% |
| Binghatti StarlightSama Al Jadaf | Q1 2026Past planned date | 63% |
More questions about Binghatti Luxuria
From AED 782k for a 337 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.26M and 2-bed flats sell for about AED 1.83M.
20/50/30: 20% on booking, 50% during construction, 30% on handover.
Q3 2027, the planned date in DLD’s register.
It is not past its planned date. It was 7% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 10 months.
457 homes on 24 floors: 213 studios of 338–430 sq ft, 195 1-bed flats of 651–852 sq ft and 49 2-bed flats of 963–1,859 sq ft.
About AED 47k a year for a studio, AED 72k for a 1-bed and AED 95k for a 2-bed in Jumeirah Village Triangle, a gross yield of about 7.5% Estimate.
Of Binghatti’s 84 projects on DLD’s record, 43 are finished. Of the 36 being built, 15 are past their planned date.
In Jumeirah Village Triangle, 27 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 3.8 km away.
More nearby
Off-plan nearby
- Fashionz 1 by DanubeFrom AED 837k40% built · Handover not on record
- Miami by SDFrom AED 1.05M71% built · Past planned date
- Azha Millennium ResidencesFrom AED 703k30% built · Planned Q3 2027
- Point ResidenciaNo sales92% built · Cancelled
- Cavendish SquareFrom AED 642k5% built · Handover not on record
- Leven ResidencesFrom AED 1.16M23% built · Planned Q4 2027
Finished buildings nearby
Typical next door AED 1,336/sq ft · 10 buildings within a 10-minute walk
- Green Park940AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Terhab Hotel & Towers at Jumeirah Village Triangle2,282AED/sq ft1-bed rent AED 73k/yr · 10-minute walk
- Bali Residences1,341AED/sq ft1-bed rent AED 77k/yr · 10-minute walk
- Oakwood Residency789AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Al Manarah Tower1,044AED/sq ft1-bed rent AED 58k/yr · 10-minute walk
- Centrium Tower854AED/sq ft1-bed rent AED 56k/yr · 10-minute walk
- Seslia Tower1,330AED/sq ft1-bed rent AED 66k/yr · 10-minute walk
- Milestone Residences1,446AED/sq ft1-bed rent AED 87k/yr · 10-minute walk
- Belmont Residences1,625AED/sq ftNot enough rents · 10-minute walk
- Forum Heights1,452AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Imperial Residence1,005AED/sq ft1-bed rent AED 60k/yr
- Al Jawhara Tower1,145AED/sq ftNot enough rents
- The Ivy1,323AED/sq ft1-bed rent AED 85k/yr
- Edmonton Elm860AED/sq ft1-bed rent AED 70k/yr
