Skip to content

Binghatti Skyblade

Downtown DubaiBinghatti

FromAED 1.8MStudio · 462 sq ft

Binghatti Skyblade is an off-plan project by Binghatti in Downtown Dubai, with 594 homes on 55 floors. DLD’s last inspection, on 26 Oct 2026, found it 17% built.

Built
17%
Handover
Q4 2027
Sales in 12 months
390
Payment plan
20/50/30
Homes
594

About

Binghatti Skyblade is a 55-floor building of 594 homes in Downtown Dubai, on Burj Khalifa Boulevard, topped by a sculpted crown. Most homes are studios, with 1-bed and 2-bed flats and a few 3-bed flats, all with floor-to-ceiling windows. Residents share an infinity pool on the roof facing Burj Khalifa, a gym high up and a garden floor partway up the building.

  • Rooftop pool facing Burj Khalifa
  • Garden floor in the sky
  • Mostly studios

Shared facilities

  • Rooftop infinity pool
  • Sky gym
  • Sky garden floor
  • Leisure area

Progress

17%built
  1. Q1 2025Building started
  2. Oct 2026Last inspection · 17%
  3. Q4 2027Planned handover

Prices

Price per sq ft

3,914 AED/sq ft390 sales in 12 months

Typical price by size

Studio
AED 1.8M462 sq ft · 3,920 AED/sq ft · 222 sales
1 bed
AED 3.71M967 sq ft · 3,979 AED/sq ft · 94 sales
2 beds
AED 4.84M1,261 sq ft · 3,831 AED/sq ft · 69 sales
3 beds
AED 13.39M2,184 sq ft · 6,130 AED/sq ft · 5 sales

Against 13 Downtown Dubai off-plan projects with 10 or more sales

  • Lowest2,394AED/sq ft
  • Typical3,370AED/sq ft
  • Binghatti Skyblade3,914AED/sq ft
  • Highest5,711AED/sq ft

5th highest of 13 · AED per sq ft in 12 months

Binghatti’s own price starts at AED 1.67M. DLD’s AED 1.8M is the lowest typical price paid in the 12 months.

Latest sales

Plus 2 newer sales, newest first
390 off-plan sales · Nov 2025 – Oct 2026, plus 2 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
11 Nov 20261 bed New7624,311AED 3.28M
1 Nov 20262 beds New1,2613,767AED 4.75M
Oct 2026 · 5 sales
20 Oct 2026Studio5263,745AED 1.97M
13 Oct 2026Studio5333,558AED 1.9M
5 Oct 20261 bed9673,847AED 3.72M
5 Oct 20262 beds1,6493,155AED 5.2M
2 Oct 20262 beds1,2613,933AED 4.96M
Sep 2026 · 4 sales
21 Sep 2026Studio5333,780AED 2.01M
18 Sep 20262 beds1,2454,380AED 5.45M
14 Sep 20261 bed9673,384AED 3.27M
11 Sep 20261 bed9673,775AED 3.65M
Jul 2026 · 3 sales
10 Jul 2026Studio4794,259AED 2.04M
8 Jul 2026Studio5273,767AED 1.98M
6 Jul 20262 beds1,2613,787AED 4.77M
Jun 2026 · 7 sales
24 Jun 2026Studio5263,764AED 1.98M
24 Jun 20261 bed9673,909AED 3.78M
23 Jun 2026Studio4623,896AED 1.8M
16 Jun 20261 bed7624,272AED 3.25M
16 Jun 20261 bed9673,795AED 3.67M
9 Jun 20262 beds1,2455,165AED 6.43M
5 Jun 20262 beds1,2613,906AED 4.92M
May 2026 · 1 sale
22 May 20261 bed1,0293,824AED 3.93M
Apr 2026 · 8 sales
23 Apr 20261 bed9673,981AED 3.85M
23 Apr 2026Studio5263,945AED 2.07M
23 Apr 2026Studio5273,748AED 1.97M
15 Apr 2026Studio3784,563AED 1.72M
15 Apr 20262 beds1,2613,937AED 4.96M
6 Apr 20262 beds1,2613,830AED 4.83M
2 Apr 20262 beds1,2633,923AED 4.95M
2 Apr 2026Studio5323,712AED 1.97M
Mar 2026 · 17 sales
27 Mar 2026Studio3864,598AED 1.77M
27 Mar 2026Studio5233,767AED 1.97M
25 Mar 2026Studio3784,563AED 1.72M
24 Mar 20262 beds1,2613,818AED 4.81M
23 Mar 20261 bed9673,976AED 3.84M
23 Mar 20261 bed9673,961AED 3.83M
23 Mar 2026Studio3864,702AED 1.81M
23 Mar 2026Studio4623,929AED 1.81M
18 Mar 20263 beds2,1846,136AED 13.4M
18 Mar 2026Studio3864,689AED 1.81M
18 Mar 2026Studio4623,929AED 1.81M
18 Mar 20261 bed9673,976AED 3.84M
12 Mar 2026Studio5333,715AED 1.98M
9 Mar 20261 bed9854,041AED 3.98M
4 Mar 2026Studio3784,471AED 1.69M
4 Mar 20262 beds1,2613,751AED 4.73M
2 Mar 2026Studio5323,788AED 2.01M
Feb 2026 · 10 sales
27 Feb 2026Studio3864,573AED 1.76M
17 Feb 20263 beds2,1846,131AED 13.39M
17 Feb 20261 bed7584,373AED 3.31M

Homes

594 homes by size

  • Studio60%356 homes · 378–532 sq ft · 6 layouts
  • 1 bed21%125 homes · 762–1,029 sq ft · 5 layouts
  • 2 beds16%95 homes · 1,218–1,805 sq ft · 9 layouts
  • 3 beds3%18 homes · 2,145–2,570 sq ft · 6 layouts
  1. 20%On booking
  2. 50%During construction
  3. 30%On handover

Payments go to the project’s escrow account at Dubai Islamic Bank.

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 3.29M

Location

Drive times

  • Dubai Airport (DXB)24min
  • Dubai Marina24min

By car. Mercato Beach, the nearest beach, is 3.8 km away.

Rated schools

  • JSS Private SchoolIndian · Very good2.0 kmaway
  • Jumeirah English Speaking SchoolUK · Outstanding3.2 kmaway

Getting around

  • Burj Khalifa RoadGold Line · opens 203211 minwalk
  • Business BayRed Line20 minwalk
  • MeydanEtihad Rail · planned4.7 kmaway
  • Al JaddafHigh-speed rail · planned7.3 kmaway
  • Dubai InternationalDXB12 kmaway
Area guideDowntown DubaiFinished homesAED 2,502/sq ft1-bed rentAED 110k/yrGross yieldEstimate5.1%

Developer

  • 43 finished
  • 21 being built, on time
  • 15 past their planned date
  • 5 not started
Escrow bank
Dubai Islamic Bank
Legal name
Binghatti Developers FZE

Also being built by Binghatti

Binghatti’s other projects
ProjectHandoverBuilt
Bugatti Residences by BinghattiBusiness BayQ4 2025Past planned date66%
Binghatti AmberhallJVCQ1 2026Past planned date38%
Binghatti RubyJVCQ1 2026Past planned date46%
Binghatti HavenDubai Sports CityQ1 2026Past planned date76%
Binghatti StarlightSama Al JadafQ1 2026Past planned date63%
All 84 Binghatti projects
Questions

More questions about Binghatti Skyblade

From AED 1.8M for a 462 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 3.71M, 2-bed flats sell for about AED 4.84M and 3-bed flats sell for about AED 13.39M.

20/50/30: 20% on booking, 50% during construction, 30% on handover. Payments go to the project’s escrow account at Dubai Islamic Bank.

Q4 2027, the planned date in DLD’s register.

It is not past its planned date. It was 17% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.

594 homes on 55 floors: 356 studios of 378–532 sq ft, 125 1-bed flats of 762–1,029 sq ft, 95 2-bed flats of 1,218–1,805 sq ft and 18 3-bed flats of 2,145–2,570 sq ft.

About AED 70k a year for a studio, AED 110k for a 1-bed, AED 165k for a 2-bed and AED 245k for a 3-bed in Downtown Dubai, a gross yield of about 5.1% Estimate.

Of Binghatti’s 84 projects on DLD’s record, 43 are finished. Of the 36 being built, 15 are past their planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 3.29M.

In Downtown Dubai, 24 minutes by car to Dubai Airport (DXB) and 24 to Dubai Marina. Business Bay Metro station on the Red Line is a 20-minute walk.

More nearby

How the numbers work

FromAED 1.8MSee it on the map