Binghatti Spectre
Sama Al JadafBinghatti
Binghatti Spectre is an off-plan project by Binghatti in Sama Al Jadaf, with 966 homes on 26 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q4 2028
- Sales in 12 months
- 2
- Homes
- 966
About
Binghatti Spectre is a 26-floor building of 712 homes in Sama Al Jadaf, near the DEWA headquarters, with offices and shops in the same building. Three in four homes are 1-bed flats, with studios, 2-bed flats and a handful of 3-bed flats, behind a faceted glass front. Residents share a padel tennis court, indoor and outdoor gyms and a jogging track, and Al Jaddaf Waterfront park is close by.
- Near DEWA headquarters
- Mostly 1-bed flats
- Padel tennis court
Shared facilities
- Pool
- Kids’ pool
- Indoor and outdoor gyms
- Yoga and wellness area
- Padel tennis court
- Jogging track
- Kids’ play area
- Outdoor seating
Progress
- Q3 2026Building started
- Oct 2026Last inspection · 0%
- Q4 2028Planned handover
Prices
Typical price by size
| Size | Typical price | AED/sq ft | Sales |
|---|---|---|---|
| 1 bed | Not enough sales | 2 |
Against 14 Sama Al Jadaf off-plan projects with 10 or more sales
- Lowest1,600AED/sq ft
- Binghatti Spectre1,616AED/sq ft
- Typical1,947AED/sq ft
- Highest4,612AED/sq ft
Latest sales
Plus 18 newer sales, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 19 Nov 2026 | 2 beds New | 1,012 | 1,928 | AED 1.95M |
| 18 Nov 2026 | 1 bed New | 711 | 1,680 | AED 1.19M |
| 18 Nov 2026 | 1 bed New | 798 | 1,612 | AED 1.29M |
| 18 Nov 2026 | 1 bed New | 807 | 1,620 | AED 1.31M |
| 17 Nov 2026 | 1 bed New | 710 | 1,739 | AED 1.23M |
| 17 Nov 2026 | 1 bed New | 718 | 1,736 | AED 1.25M |
| 17 Nov 2026 | 1 bed New | 806 | 1,630 | AED 1.31M |
| 16 Nov 2026 | 1 bed New | 710 | 1,689 | AED 1.2M |
| 16 Nov 2026 | 1 bed New | 755 | 1,735 | AED 1.31M |
| 16 Nov 2026 | 1 bed New | 826 | 1,623 | AED 1.34M |
| 12 Nov 2026 | 1 bed New | 719 | 1,746 | AED 1.26M |
| 11 Nov 2026 | 1 bed New | 721 | 1,715 | AED 1.24M |
| 9 Nov 2026 | 1 bed New | 723 | 1,706 | AED 1.23M |
| 6 Nov 2026 | 1 bed New | 721 | 1,698 | AED 1.22M |
| 5 Nov 2026 | Studio New | 420 | 2,028 | AED 852k |
| 4 Nov 2026 | Studio New | 372 | 2,034 | AED 757k |
| 4 Nov 2026 | 1 bed New | 719 | 1,764 | AED 1.27M |
| 2 Nov 2026 | 1 bed New | 713 | 1,726 | AED 1.23M |
| Oct 2026 · 2 sales | ||||
| 28 Oct 2026 | 1 bed | 826 | 1,612 | AED 1.33M |
| 23 Oct 2026 | 1 bed | 824 | 1,620 | AED 1.33M |
Homes
966 homes by size
- Studio11%81 homes · 372–605 sq ft · 5 layouts
- 1 bed77%546 homes · 699–1,614 sq ft · 15 layouts
- 2 beds12%82 homes · 999–1,782 sq ft · 8 layouts
- 3 beds3 homes · 1,459–3,426 sq ft · 3 layouts
Location
Drive times
- Downtown Dubai16min
- Dubai Airport (DXB)18min
- Dubai Marina29min
By car. La Mer Beach, the nearest beach, is 8.1 km away.
Rated schools
- New Indian Model SchoolIndian · Good1.8 kmaway
- Universal American SchoolUS/IB · Very good2.7 kmaway
Getting around
- CreekGreen Line8 minwalk
- Al JaddafHigh-speed rail · planned9 minwalk
- Dubai Festival CityBlue Line · opens 20292.2 kmaway
- Dubai InternationalDXB4.2 kmaway
- MeydanEtihad Rail · planned8.1 kmaway
Area guideSama Al JadafFinished homesAED 1,781/sq ft1-bed rentAED 72k/yrGross yieldEstimate5.2%Developer
- 43 finished
- 21 being built, on time
- 15 past their planned date
- 5 not started
- Escrow bank
- Not on record
- Legal name
- Binghatti Developers FZE
Also being built by Binghatti
| Project | Handover | Built |
|---|---|---|
| Bugatti Residences by BinghattiBusiness Bay | Q4 2025Past planned date | 66% |
| Binghatti AmberhallJVC | Q1 2026Past planned date | 38% |
| Binghatti RubyJVC | Q1 2026Past planned date | 46% |
| Binghatti HavenDubai Sports City | Q1 2026Past planned date | 76% |
| Binghatti StarlightSama Al Jadaf | Q1 2026Past planned date | 63% |
More questions about Binghatti Spectre
Q4 2028, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.
966 homes on 26 floors: 81 studios of 372–605 sq ft, 546 1-bed flats of 699–1,614 sq ft, 82 2-bed flats of 999–1,782 sq ft and 3 3-bed flats of 1,459–3,426 sq ft.
About AED 55k a year for a studio, AED 72k for a 1-bed, AED 100k for a 2-bed and AED 140k for a 3-bed in Sama Al Jadaf, a gross yield of about 5.2% Estimate.
Of Binghatti’s 84 projects on DLD’s record, 43 are finished. Of the 36 being built, 15 are past their planned date.
In Sama Al Jadaf, 16 minutes by car to Downtown Dubai and 18 to Dubai Airport (DXB). Creek Metro station on the Green Line is a 8-minute walk.
More nearby
Off-plan nearby
- MontageFrom AED 1.23M40% built · Planned Q3 2027
- Boutique 23From AED 685k65% built · Handover not on record
- AmazoniaFrom AED 1.27M1% built · Planned Q4 2027
- Binghatti TwilightFrom AED 1.36M55% built · Past planned date
- Binghatti MoonlightFrom AED 1.52M19% built · Past planned date
- Fala by KascoNo sales0% built · Planned Q4 2028
Finished buildings nearby
Typical next door AED 1,843/sq ft · 6 buildings within a 10-minute walk
- Riah Towers1,154AED/sq ft1-bed rent AED 75k/yr · 10-minute walk
- Boutique Xll1,910AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Dubai Wharf1,217AED/sq ft1-bed rent AED 78k/yr · 10-minute walk
- Volna by Kasco2,049AED/sq ftNot enough rents · 10-minute walk
- Palazzo Versace2,109AED/sq ftNot enough rents · 10-minute walk
- D11,776AED/sq ft1-bed rent AED 110k/yr · 10-minute walk
- Farhad Azizi Residence1,876AED/sq ft1-bed rent AED 80k/yr
- Binghatti Avenue1,416AED/sq ft1-bed rent AED 70k/yr
- Azizi Aliyah Residences1,120AED/sq ft1-bed rent AED 72k/yr
- Binghatti Creek1,430AED/sq ft1-bed rent AED 70k/yr
