Skip to content

Cedarwood Estates-South

Dubai Production CityWasl

Cedarwood Estates-South is an off-plan project by Wasl in Dubai Production City, with 74 homes. DLD’s last inspection, on 6 May 2026, found it 0% built.

Built
0%
Handover
Q1 2029
Sales in 12 months
No sales
Homes
74

Progress

0%built
  1. May 2026Last inspection · 0%
  2. Q4 2026Building started
  3. Q1 2029Planned handover

DLD updates % built after each inspection, so work on site can be further along than this figure.

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)36min
  • Dubai Marina21min

By car. JBR Beach, the nearest beach, is 9.7 km away.

Rated schools

  • Greenfield International SchoolInternational Baccalaureate · Very good2.8 kmaway
  • Victory Heights Primary SchoolUK · Outstanding5.0 kmaway

Getting around

  • Al YalayisEtihad Rail31 minwalk
  • Jumeirah Golf EstatesRed Line2.3 kmaway
  • Dubai Production CityGold Line · opens 20322.9 kmaway
  • Al Maktoum AirportHigh-speed rail · planned12 kmaway
  • Al Maktoum InternationalDWC12 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%

Developer

  • 5 finished
  • 22 being built, on time
Escrow bank
Not on record
Legal name
Jge Real Estate L.L.C

Also being built by Wasl

Wasl’s other projects
ProjectHandoverBuilt
Park Views Residences BAl KifafQ1 2027Being built99%
South Garden AAl FurjanQ4 2027Being built16%
South Garden BAl FurjanQ4 2027Being built16%
South Garden CAl FurjanQ4 2027Being built16%
South Garden DAl FurjanQ2 2028Being built6%
All 27 Wasl projects
Questions

More questions about Cedarwood Estates-South

Q1 2029, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 6 May 2026, with handover planned in 2 years.

About AED 40k a year for a studio, AED 63k for a 1-bed, AED 90k for a 2-bed and AED 110k for a 3-bed in Dubai Production City, a gross yield of about 8.6% Estimate.

Of Wasl’s 27 projects on DLD’s record, 5 are finished. Of the 22 being built, none is past its planned date.

In Dubai Production City, 27 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 2.3 km away.

More nearby

How the numbers work