Skip to content

Jouri Hills

Jumeirah Golf EstatesArada

Jouri Hills is an off-plan project by Arada in Jumeirah Golf Estates, with 154 homes on 4 floors. DLD’s last inspection, on 26 Oct 2026, found it 78% built.

Built
78%
Handover
Q2 2026
Sales in 12 months
No sales
Homes
154

About

Jouri Hills is a gated community of townhouses and villas in Dubai Production City, part of Jumeirah Golf Estates. Homes run from 3-bed townhouses to 6-bed villas, with skylights and smart home controls, and every detached home has its own pool. Residents share a neighbourhood park with sports courts, each home comes with a golf cart, and the Earth and Fire golf courses are close by.

  • Pool with every detached home
  • Golf cart with every home
  • Beside the Earth and Fire courses

Shared facilities

  • Neighbourhood park
  • Sports courts
  • Private pools for detached homes
  • Gated entry and security
  • Golf cart for each home
Open brochure

Progress

78%built
  1. Q3 2023Building started
  2. Q2 2026Planned handover · passed
  3. Oct 2026Last inspection · 78%
5 months past the planned date

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)36min
  • Dubai Marina21min

By car. JBR Beach, the nearest beach, is 9.2 km away.

Rated schools

  • Victory Heights Primary SchoolUK · Outstanding3.9 kmaway
  • Greenfield International SchoolInternational Baccalaureate · Very good3.9 kmaway

Getting around

  • Dubai Production CityGold Line · opens 203228 minwalk
  • Al YalayisEtihad Rail2.2 kmaway
  • Jumeirah Golf EstatesRed Line2.6 kmaway
  • Al Maktoum AirportHigh-speed rail · planned14 kmaway
  • Al Maktoum InternationalDWC14 kmaway
Area guideDubai Production CityFinished homesAED 1,025/sq ft1-bed rentAED 63k/yrGross yieldEstimate8.6%

Developer

  • 4 being built, on time
  • 1 past their planned date
Escrow bank
Dubai Islamic Bank
Legal name
Arada Developments L.L.C S.O.C

Also being built by Arada

Arada’s other projects
ProjectHandoverBuilt
Armani Beach Residences at Palm JumeirahPalm JumeirahQ4 2027Being built10%
W Residences at Dubai HarbourDubai MarinaQ4 2027Being built4%
Akala Hotels And ResidencesZaa'Beel SecondQ4 2029Being built2%
Inaura Hotels & ResidencesDowntown DubaiQ2 2030Being built1%
All 5 Arada projects
Questions

More questions about Jouri Hills

Q2 2026, the planned date in DLD’s register.

No. It is 5 months past its planned date, and was 78% built at DLD’s last inspection on 26 Oct 2026.

About AED 40k a year for a studio, AED 63k for a 1-bed, AED 90k for a 2-bed and AED 110k for a 3-bed in Dubai Production City, a gross yield of about 8.6% Estimate.

Of Arada’s 5 projects on DLD’s record, 0 are finished. Of the 5 being built, 1 is past its planned date.

In Jumeirah Golf Estates, Dubai Production City, 27 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 2.6 km away.

More nearby

How the numbers work