Skip to content

W Residences at Dubai Harbour

Dubai HarbourArada

FromAED 5M1 bed · 1,068 sq ft

W Residences at Dubai Harbour is an off-plan project by Arada in Dubai Harbour, with 490 homes on 39 floors. DLD’s last inspection, on 26 Oct 2026, found it 4% built.

Built
4%
Handover
Q4 2027
Since launch
Up 9%1 bed price per sq ft
Homes
490

About

W Residences at Dubai Harbour is three buildings of up to 39 floors with 490 homes in Dubai Marina, on the Dubai Harbour waterfront. Homes run from 1-bed to 5-bed flats, with penthouses among them, and 2-bed flats are the largest group. The buildings lean towards one another and touch at points, and the shared spaces sit together on the podium.

  • Three linked buildings
  • Penthouses up to 5-bed
  • Designed for LEED certification

Progress

4%built
  1. Nov 2024 – Jan 2025Launch sales · 91
  2. Q2 2025Building started
  3. Oct 2026Last inspection · 4%
  4. Q4 2027Planned handover

Prices

Price per sq ft

4,769 AED/sq ft117 sales in 12 months

Typical price by size

1 bed
AED 5M1,068 sq ft · 4,613 AED/sq ft · 41 sales
2 beds
AED 7.79M1,589 sq ft · 4,858 AED/sq ft · 48 sales
3 beds
AED 13.22M2,733 sq ft · 4,826 AED/sq ft · 18 sales
4 beds
AED 20.51M4,328 sq ft · 4,768 AED/sq ft · 7 sales
5 beds
AED 33.87M7,681 sq ft · 4,230 AED/sq ft · 3 sales

Against 22 Dubai Marina off-plan projects with 10 or more sales

  • Lowest2,217AED/sq ft
  • Typical3,822AED/sq ft
  • W Residences at Dubai Harbour4,769AED/sq ft
  • Highest5,087AED/sq ft

5th highest of 22 · AED per sq ft in 12 months

Arada’s own price starts at AED 4.1M. DLD’s AED 5M is the lowest typical price paid in the 12 months.

Latest sales

Newest first
117 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 1 sale
28 Oct 20263 beds2,4794,343AED 10.77M
Sep 2026 · 1 sale
3 Sep 20264+ beds4,3284,684AED 20.27M
Aug 2026 · 2 sales
21 Aug 20264+ beds4,3284,636AED 20.06M
21 Aug 20261 bed1,1923,967AED 4.73M
Jul 2026 · 1 sale
16 Jul 20261 bed1,0583,593AED 3.8M
Jun 2026 · 1 sale
17 Jun 20262 beds1,5994,919AED 7.87M
May 2026 · 1 sale
21 May 20262 beds1,7724,853AED 8.6M
Apr 2026 · 6 sales
27 Apr 20262 beds2,5445,890AED 14.99M
27 Apr 20261 bed1,1924,086AED 4.87M
27 Apr 20264+ beds4,3284,790AED 20.73M
27 Apr 20261 bed1,3553,762AED 5.1M
27 Apr 20262 beds1,5994,884AED 7.81M
27 Apr 20263 beds2,7324,832AED 13.2M
Mar 2026 · 11 sales
30 Mar 20261 bed1,0854,424AED 4.8M
30 Mar 20261 bed1,4964,479AED 6.7M
30 Mar 20262 beds1,5894,965AED 7.89M
30 Mar 20263 beds2,7334,951AED 13.53M
30 Mar 20264+ beds7,6814,230AED 32.49M
30 Mar 20262 beds1,5864,956AED 7.86M
5 Mar 20263 beds2,7334,786AED 13.08M
5 Mar 20264+ beds15,0974,129AED 62.33M
5 Mar 20261 bed1,0583,666AED 3.88M
4 Mar 20261 bed1,0844,613AED 5M
4 Mar 20261 bed1,0844,613AED 5M
Feb 2026 · 28 sales
26 Feb 20261 bed1,0684,766AED 5.09M
26 Feb 20261 bed1,0834,690AED 5.08M
26 Feb 20261 bed1,0834,690AED 5.08M
26 Feb 20261 bed1,0583,520AED 3.72M
26 Feb 20263 beds2,7334,936AED 13.49M
26 Feb 20261 bed1,0464,732AED 4.95M
26 Feb 20262 beds1,5864,839AED 7.68M
18 Feb 20261 bed1,3064,218AED 5.51M
18 Feb 20262 beds1,5994,884AED 7.81M
18 Feb 20261 bed1,0673,989AED 4.26M
18 Feb 20261 bed1,2904,671AED 6.03M
18 Feb 20261 bed1,3594,485AED 6.1M
18 Feb 20262 beds1,5864,918AED 7.8M
18 Feb 20262 beds1,5994,925AED 7.88M
18 Feb 20262 beds1,5994,928AED 7.88M
18 Feb 20261 bed1,2224,689AED 5.73M
18 Feb 20262 beds1,9494,695AED 9.15M
18 Feb 20262 beds1,5894,849AED 7.71M
18 Feb 20261 bed1,0834,690AED 5.08M
18 Feb 20261 bed1,0684,789AED 5.12M
18 Feb 20262 beds1,9494,715AED 9.19M
3 Feb 20264+ beds4,3284,769AED 20.64M
3 Feb 20262 beds1,5894,846AED 7.7M
3 Feb 20262 beds1,5894,830AED 7.68M
3 Feb 20263 beds2,7334,780AED 13.07M
3 Feb 20261 bed1,0684,766AED 5.09M

Homes

490 homes by size

  • 1 bed30%149 homes · 1,022–1,564 sq ft · 27 layouts
  • 2 beds37%179 homes · 1,400–2,578 sq ft · 32 layouts
  • 3 beds21%101 homes · 1,932–5,730 sq ft · 33 layouts
  • 4 beds9%46 homes · 3,149–5,414 sq ft · 16 layouts
  • 5 beds3%15 homes · 5,041–15,097 sq ft · 13 layouts

Golden Visa

10-year residence for owners of homes worth AED 2M or moreOff-plan homes can qualify.
Qualifying homes fromAED 5M

Location

Drive times

  • Downtown Dubai23min
  • Dubai Airport (DXB)36min

By car. JBR Beach, the nearest beach, is 1.7 km away.

Rated schools

  • Regent International Private SchoolUK · Very good3.1 kmaway
  • EMIRATES INTERNATIONAL SCHOOL MEADOWSInternational Baccalaureate · Very good3.2 kmaway

Getting around

  • Mina SeyahiDubai Tram9 minwalk
  • SOBHA REALTYRed Line22 minwalk
  • Al YalayisEtihad Rail8.6 kmaway
  • Al Maktoum AirportHigh-speed rail · planned22 kmaway
  • Al Maktoum InternationalDWC22 kmaway
Area guideDubai MarinaFinished homesAED 1,989/sq ft1-bed rentAED 95k/yrGross yieldEstimate5.6%

Developer

  • 4 being built, on time
  • 1 past their planned date
Escrow bank
National Bank of Ras Al Khaimah
Legal name
Arada Developments L.L.C S.O.C

Also being built by Arada

Arada’s other projects
ProjectHandoverBuilt
Jouri HillsDubai Production CityQ2 2026Past planned date78%
Armani Beach Residences at Palm JumeirahPalm JumeirahQ4 2027Being built10%
Akala Hotels And ResidencesZaa'Beel SecondQ4 2029Being built2%
Inaura Hotels & ResidencesDowntown DubaiQ2 2030Being built1%
All 5 Arada projects
Questions

More questions about W Residences at Dubai Harbour

From AED 5M for a 1,068 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 7.79M, 3-bed flats sell for about AED 13.22M, 4+ bed flats sell for about AED 20.51M and 4+ bed flats sell for about AED 33.87M.

Q4 2027, the planned date in DLD’s register.

It is not past its planned date. It was 4% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.

490 homes on 39 floors: 149 1-bed flats of 1,022–1,564 sq ft, 179 2-bed flats of 1,400–2,578 sq ft, 101 3-bed flats of 1,932–5,730 sq ft, 46 4+ bed flats of 3,149–5,414 sq ft and 15 4+ bed flats of 5,041–15,097 sq ft.

Up 9% for 1-bed flats, per sq ft. Against the launch sales of Nov 2024 – Jan 2025: 2-bed flats up 13%, 3-bed flats up 13%, 4+ bed flats up 12%.

About AED 95k a year for a 1-bed, AED 145k for a 2-bed, AED 215k for a 3-bed and AED 300k for a 4+ bed in Dubai Marina, a gross yield of about 5.6% Estimate.

Of Arada’s 5 projects on DLD’s record, 0 are finished. Of the 5 being built, 1 is past its planned date.

Homes worth AED 2M or more can qualify for 10 years’ residence. Here, qualifying homes start from AED 5M.

In Dubai Harbour, Dubai Marina, 23 minutes by car to Downtown Dubai and 36 to Dubai Airport (DXB). SOBHA REALTY Metro station on the Red Line is a 22-minute walk.

More nearby

How the numbers work