Celesto Tower 3
Dubai Land Residence ComplexTarrad
Celesto Tower 3 is an off-plan project by Tarrad in Dubai Land Residence Complex, with 216 homes on 11 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.
- Built
- 0%
- Handover
- Q3 2028
- Sales in 12 months
- 26
- Homes
- 216
Progress
- Q1 2026Building started
- Oct 2026Last inspection · 0%
- Q3 2028Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 535k313 sq ft · 1,723 AED/sq ft · 17 sales
- 1 bed
- AED 773k531 sq ft · 1,441 AED/sq ft · 9 sales
Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales
- Lowest810AED/sq ft
- Typical1,386AED/sq ft
- Celesto Tower 31,615AED/sq ft
- Highest1,737AED/sq ft
11th highest of 72 · AED per sq ft in 12 months
Latest sales
Plus 1 newer sale, newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Nov 2026 | ||||
| 19 Nov 2026 | 1 bed New | 517 | 1,451 | AED 750k |
| Oct 2026 · 5 sales | ||||
| 30 Oct 2026 | Studio | 313 | 1,808 | AED 566k |
| 6 Oct 2026 | Studio | 322 | 1,724 | AED 555k |
| 6 Oct 2026 | Studio | 307 | 1,619 | AED 497k |
| 5 Oct 2026 | 1 bed | 531 | 1,456 | AED 773k |
| 5 Oct 2026 | Studio | 313 | 1,690 | AED 529k |
| Sep 2026 · 11 sales | ||||
| 28 Sep 2026 | Studio | 313 | 1,785 | AED 559k |
| 28 Sep 2026 | 1 bed | 632 | 1,377 | AED 870k |
| 15 Sep 2026 | Studio | 313 | 1,811 | AED 567k |
| 14 Sep 2026 | 1 bed | 513 | 1,441 | AED 739k |
| 14 Sep 2026 | Studio | 308 | 1,719 | AED 529k |
| 10 Sep 2026 | 1 bed | 521 | 1,426 | AED 743k |
| 9 Sep 2026 | Studio | 305 | 1,611 | AED 491k |
| 9 Sep 2026 | Studio | 305 | 1,611 | AED 491k |
| 7 Sep 2026 | Studio | 322 | 1,817 | AED 585k |
| 2 Sep 2026 | 1 bed | 532 | 1,466 | AED 780k |
| 2 Sep 2026 | 1 bed | 532 | 1,456 | AED 775k |
| Aug 2026 · 3 sales | ||||
| 17 Aug 2026 | 1 bed | 517 | 1,470 | AED 760k |
| 13 Aug 2026 | Studio | 321 | 1,760 | AED 565k |
| 3 Aug 2026 | Studio | 322 | 1,802 | AED 580k |
| Jul 2026 · 7 sales | ||||
| 28 Jul 2026 | Studio | 311 | 1,721 | AED 535k |
| 27 Jul 2026 | Studio | 306 | 1,776 | AED 543k |
| 24 Jul 2026 | 1 bed | 632 | 1,372 | AED 867k |
| 23 Jul 2026 | Studio | 305 | 1,738 | AED 530k |
| 21 Jul 2026 | 1 bed | 521 | 1,401 | AED 730k |
| 16 Jul 2026 | Studio | 311 | 1,543 | AED 480k |
| 15 Jul 2026 | Studio | 313 | 1,438 | AED 450k |
Homes
216 homes by size
- Studio65%141 homes · 307–379 sq ft · 5 layouts
- 1 bed33%71 homes · 513–632 sq ft · 4 layouts
- 2 beds2%4 homes · 625–806 sq ft · 3 layouts
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)27min
- Dubai Marina35min
By car. Jumeirah Open Beach, the nearest beach, is 18.0 km away.
Rated schools
- GEMS Wellington Academy -FzeUK · Very good2.6 kmaway
Getting around
- Academic CityBlue Line · opens 20292.9 kmaway
- MeydanEtihad Rail · planned9.9 kmaway
- CreekGreen Line14 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB17 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%Developer
- 3 being built, on time
- 1 past their planned date
- 2 not started
- Escrow bank
- Not on record
- Legal name
- Tarrad Development L.L.C
More by Tarrad
| Project | Handover | Built |
|---|---|---|
| Mackerel TowerDubai Islands | Q2 2026Past planned date | 46% |
| Celesto TowerDubai Land Residence Complex | Q4 2027Being built | 4% |
| Celesto Tower 2Dubai Land Residence Complex | Q2 2028Being built | 0% |
| Celesto tower 4Dubai Land Residence Complex | Q4 2028Not started | 0% |
| LUNARA TOWERMajan | Q4 2028Not started | 0% |
More questions about Celesto Tower 3
From AED 535k for a 313 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 773k.
Q3 2028, the planned date in DLD’s register.
It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 22 months.
216 homes on 11 floors: 141 studios of 307–379 sq ft, 71 1-bed flats of 513–632 sq ft and 4 2-bed flats of 625–806 sq ft.
About AED 40k a year for a studio, AED 56k for a 1-bed and AED 73k for a 2-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.
Of Tarrad’s 6 projects on DLD’s record, 0 are finished. Of the 4 being built, 1 is past its planned date.
In Dubai Land Residence Complex, 27 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 14 km away.
More nearby
Off-plan nearby
- Marquis VistaFrom AED 764k3% built · Planned Q4 2027
- Verdania 3No sales0% built · Planned Q4 2026
- Empire GardensFrom AED 825k0% built · Planned Q4 2028
- One Residences x Grand SignatureFrom AED 626k72% built · Planned Q4 2026
- Floarea OasisFrom AED 694k13% built · Planned Q4 2028
- The Archive by ImtiazNo sales3% built · Planned Q2 2027
Finished buildings nearby
Typical next door AED 892/sq ft · 4 buildings within a 10-minute walk
- Ajmal Sarah754AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Blue Wave953AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Phoenix Tower831AED/sq ftNot enough rents · 10-minute walk
- Time 11,222AED/sq ft1-bed rent AED 55k/yr · 10-minute walk
- Sky Courts724AED/sq ft1-bed rent AED 50k/yr
- The V Tower1,012AED/sq ft1-bed rent AED 60k/yr
- Desert Sun Tower827AED/sq ft1-bed rent AED 57k/yr
- Durar 1945AED/sq ft1-bed rent AED 57k/yr
