Skip to content

The Archive by Imtiaz

Dubai Land Residence ComplexImtiaz

The Archive by Imtiaz is an off-plan project by Imtiaz in Dubai Land Residence Complex, with 310 homes on 13 floors. DLD’s last inspection, on 26 Oct 2026, found it 3% built.

Built
3%
Handover
Q2 2027
Sales in 12 months
3
Homes
310

Progress

3%built
  1. Q2 2025Building started
  2. Oct 2026Last inspection · 3%
  3. Q2 2027Planned handover

Prices

Price per sq ft

1,445 AED/sq ft3 sales in 12 months

Typical price by size

Studio
Not enough sales1 sale
2 beds
Not enough sales2 sales

Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales

  • Lowest810AED/sq ft
  • Typical1,386AED/sq ft
  • The Archive by Imtiaz1,445AED/sq ft
  • Highest1,737AED/sq ft

Latest sales

Plus 14 newer sales, newest first
3 off-plan sales · Nov 2025 – Oct 2026, plus 14 newer sales · newest first
DateSizeSq ftAED/sq ftPrice
Nov 2026
20 Nov 20261 bed New7141,635AED 1.17M
20 Nov 20263 beds New1,4901,274AED 1.9M
12 Nov 20261 bed New5692,132AED 1.21M
11 Nov 20261 bed New7141,579AED 1.13M
10 Nov 2026Studio New3841,818AED 698k
9 Nov 2026Studio New3841,918AED 736k
6 Nov 2026Studio New3821,781AED 680k
6 Nov 2026Studio New3821,781AED 680k
6 Nov 2026Studio New3831,778AED 681k
6 Nov 2026Studio New3841,778AED 683k
6 Nov 2026Studio New3821,791AED 684k
6 Nov 20262 beds New1,2281,350AED 1.66M
6 Nov 20262 beds New1,2341,481AED 1.83M
5 Nov 2026Studio New3821,919AED 733k
Oct 2026 · 3 sales
26 Oct 20262 beds1,1671,445AED 1.69M
26 Oct 20262 beds1,2341,336AED 1.65M
26 Oct 2026Studio3821,912AED 730k

Homes

310 homes by size

  • Studio65%201 homes · 379–485 sq ft · 6 layouts
  • 1 bed27%83 homes · 569–1,655 sq ft · 12 layouts
  • 2 beds7%22 homes · 1,167–1,700 sq ft · 6 layouts
  • 3 beds1%4 homes · 1,490–1,889 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)27min
  • Dubai Marina35min

By car. Jumeirah Open Beach, the nearest beach, is 18.0 km away.

Rated schools

  • GEMS Wellington Academy -FzeUK · Very good2.5 kmaway

Getting around

  • Dubai Silicon OasisBlue Line · opens 20292.8 kmaway
  • MeydanEtihad Rail · planned9.8 kmaway
  • CreekGreen Line14 kmaway
  • Al JaddafHigh-speed rail · planned15 kmaway
  • Dubai InternationalDXB17 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%

Developer

  • 10 finished
  • 28 being built, on time
  • 3 past their planned date
Escrow bank
Banque Misr
Legal name
Rosewell Park Real Estate Development L.L.C

Also being built by Imtiaz

Imtiaz’s other projects
ProjectHandoverBuilt
Beach Walk Residences 3 BY ImtiazDubai IslandsQ2 2026Past planned date100%
Cove Edition Residence 1 By ImtiazDubai Land Residence ComplexQ3 2026Past planned date90%
Cove Edition Residence 2 By ImtiazDubai Land Residence ComplexQ4 2026Past planned date60%
Luxur Tower By ImtiazJVCQ4 2026Being built90%
Beach Walk Grand By ImtiazDubai IslandsQ4 2026Being built68%
All 41 Imtiaz projects
Questions

More questions about The Archive by Imtiaz

Q2 2027, the planned date in DLD’s register.

It is not past its planned date. It was 3% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 7 months.

310 homes on 13 floors: 201 studios of 379–485 sq ft, 83 1-bed flats of 569–1,655 sq ft, 22 2-bed flats of 1,167–1,700 sq ft and 4 3-bed flats of 1,490–1,889 sq ft.

About AED 40k a year for a studio, AED 56k for a 1-bed, AED 73k for a 2-bed and AED 100k for a 3-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.

Of Imtiaz’s 41 projects on DLD’s record, 10 are finished. Of the 31 being built, 3 are past their planned date.

In Dubai Land Residence Complex, 27 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 14 km away.

More nearby

How the numbers work