Skip to content

Luxur Tower by Imtiaz

Jumeirah Village CircleImtiaz

FromAED 750kStudio · 402 sq ft

Luxur Tower by Imtiaz is an off-plan project by Imtiaz in Jumeirah Village Circle, with 356 homes on 28 floors. DLD’s last inspection, on 26 Oct 2026, found it 90% built.

Built
90%
Handover
Q4 2026
Since launch
Up 8%Studio price per sq ft
Payment plan
20/40/40
Homes
356

About

Luxor is a 28-floor building of 356 homes in Jumeirah Village Circle, with parks on its doorstep. Over half the homes are studios, with 1-bed and some 2-bed flats, all sold fully furnished with Alexa smart home controls and Bosch appliances. Residents share a rooftop pool, a theatre room and a sky garden.

  • Sold fully furnished
  • Sparkling water on tap
  • Rooftop pool and sky garden

Shared facilities

  • Rooftop pool
  • Kids’ pool
  • Gym
  • Sauna and steam rooms
  • Jacuzzi
  • Clubhouse
  • Theatre room
  • Sky garden

Progress

90%built
  1. Q3 2023Building started
  2. Dec 2023 – Feb 2024Launch sales · 176
  3. Oct 2026Last inspection · 90%
  4. Q4 2026Planned handover

Prices

Price per sq ft

1,550 AED/sq ft17 sales in 12 months

Typical price by size

Studio
AED 750k402 sq ft · 1,828 AED/sq ft · 7 sales
1 bed
AED 1.16M771 sq ft · 1,531 AED/sq ft · 8 sales
2 beds
Not enough sales2 sales

Against 99 JVC off-plan projects with 10 or more sales

  • Lowest825AED/sq ft
  • Typical1,497AED/sq ft
  • Luxur Tower by Imtiaz1,550AED/sq ft
  • Highest2,276AED/sq ft

39th highest of 99 · AED per sq ft in 12 months

Latest sales

Newest first
17 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 1 sale
30 Oct 20261 bed7711,285AED 991k
Jul 2026 · 3 sales
17 Jul 2026Studio4031,861AED 750k
16 Jul 20261 bed7481,537AED 1.15M
1 Jul 2026Studio4021,659AED 667k
Jun 2026 · 1 sale
4 Jun 20261 bed8211,389AED 1.14M
May 2026 · 1 sale
7 May 20261 bed7711,543AED 1.19M
Apr 2026 · 1 sale
30 Apr 20261 bed8041,493AED 1.2M
Mar 2026 · 2 sales
10 Mar 20262 beds1,0401,490AED 1.55M
6 Mar 20261 bed7711,524AED 1.18M
Feb 2026 · 4 sales
24 Feb 2026Studio3882,010AED 780k
19 Feb 20261 bed7521,622AED 1.22M
10 Feb 2026Studio3881,946AED 755k
9 Feb 20262 beds1,0401,490AED 1.55M
Jan 2026 · 1 sale
12 Jan 2026Studio4181,794AED 750k
Nov 2025 · 3 sales
26 Nov 2025Studio4021,828AED 735k
24 Nov 2025Studio4021,750AED 703k
7 Nov 20251 bed7291,550AED 1.13M

Homes

356 homes by size

  • Studio53%190 homes · 388–470 sq ft · 8 layouts
  • 1 bed39%138 homes · 729–950 sq ft · 8 layouts
  • 2 beds8%28 homes · 1,040–1,295 sq ft · 2 layouts
  1. 20%On booking
  2. 40%During construction
  3. 40%On handover

Payments go to the project’s escrow account at First Abu Dhabi Bank.

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)35min
  • Dubai Marina22min

By car. JBR Beach, the nearest beach, is 7.8 km away.

Rated schools

  • Nord Anglia International SchoolUK · Outstanding2.4 kmaway
  • JSS International SchoolIndian · Very good2.6 kmaway

Getting around

  • Jumeirah Village CircleGold Line · opens 20327 minwalk
  • Al YalayisEtihad Rail5.5 kmaway
  • Jumeirah Golf EstatesRed Line5.8 kmaway
  • Al Maktoum AirportHigh-speed rail · planned18 kmaway
  • Al Maktoum InternationalDWC18 kmaway
Area guideJVCFinished homesAED 1,298/sq ft1-bed rentAED 71k/yrGross yieldEstimate7.3%

Developer

  • 10 finished
  • 28 being built, on time
  • 3 past their planned date
Escrow bank
First Abu Dhabi Bank
Legal name
Imtiaz Real Estate Investment & Development L.L.C

Also being built by Imtiaz

Imtiaz’s other projects
ProjectHandoverBuilt
Beach Walk Residences 3 BY ImtiazDubai IslandsQ2 2026Past planned date100%
Cove Edition Residence 1 By ImtiazDubai Land Residence ComplexQ3 2026Past planned date90%
Cove Edition Residence 2 By ImtiazDubai Land Residence ComplexQ4 2026Past planned date60%
Beach Walk Grand By ImtiazDubai IslandsQ4 2026Being built68%
Cove Edition Residence 3 By ImtiazDubai Land Residence ComplexQ4 2026Being built37%
All 41 Imtiaz projects
Questions

More questions about Luxur Tower by Imtiaz

From AED 750k for a 402 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.16M.

20/40/40: 20% on booking, 40% during construction, 40% on handover. Payments go to the project’s escrow account at First Abu Dhabi Bank.

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 90% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

356 homes on 28 floors: 190 studios of 388–470 sq ft, 138 1-bed flats of 729–950 sq ft and 28 2-bed flats of 1,040–1,295 sq ft.

Up 16% for 1-bed flats, per sq ft. Against the launch sales of Dec 2023 – Feb 2024: studios up 8%.

About AED 48k a year for a studio, AED 71k for a 1-bed and AED 100k for a 2-bed in JVC, a gross yield of about 7.3% Estimate.

Of Imtiaz’s 41 projects on DLD’s record, 10 are finished. Of the 31 being built, 3 are past their planned date.

In Jumeirah Village Circle, 27 minutes by car to Downtown Dubai and 35 to Dubai Airport (DXB). Jumeirah Golf Estates Metro station on the Red Line is 5.8 km away.

More nearby

How the numbers work

FromAED 750kSee it on the map