Cove Edition Residence 2 by Imtiaz
Dubai Land Residence ComplexImtiaz
Cove Edition Residence 2 by Imtiaz is an off-plan project by Imtiaz in Dubai Land Residence Complex, with 260 homes on 13 floors. DLD’s last inspection, on 26 Oct 2026, found it 60% built.
- Built
- 60%
- Handover
- Q4 2026
- Since launch
- Down 1%Studio price per sq ft
- Homes
- 260
About
Cove Edition 2 is a 13-floor building of 260 homes in Dubai Land Residence Complex, close to Dubai Outlet Mall and Academic City. Most homes are studios, with 1-bed and 2-bed flats, all sold fully furnished with smart home features. Residents share a rooftop infinity pool, a sauna and steam room and a clubhouse.
- Sold fully furnished
- Rooftop infinity pool
- Mostly studios
Shared facilities
- Rooftop infinity pool
- Clubhouse
- Gym
- Sauna and steam room
- Jacuzzi
- BBQ area
- Kids’ playground
- Seating area
Progress
- Q4 2024Building started
- Nov 2024 – Jan 2025Launch sales · 161
- Q4 2026Planned handover
- Oct 2026Last inspection · 60%
Prices
Price per sq ft
Typical price by size
- Studio
- AED 614k413 sq ft · 8 sales
- 1 bed
- AED 943k745 sq ft · 6 sales
- 2 beds
- AED 1.37M1,174 sq ft · 5 sales
Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales
- Lowest810AED/sq ft
- Cove Edition Residence 2 by Imtiaz1,323AED/sq ft
- Typical1,386AED/sq ft
- Highest1,737AED/sq ft
27th lowest of 72 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Oct 2026 · 2 sales | ||||
| 19 Oct 2026 | Studio | 385 | 1,737 | AED 669k |
| 14 Oct 2026 | 2 beds | 1,174 | 1,227 | AED 1.44M |
| Sep 2026 · 2 sales | ||||
| 25 Sep 2026 | 1 bed | 745 | 1,805 | AED 1.34M |
| 9 Sep 2026 | 1 bed | 1,016 | 1,323 | AED 1.34M |
| Aug 2026 · 1 sale | ||||
| 28 Aug 2026 | Studio | 407 | 1,989 | AED 810k |
| Jul 2026 · 1 sale | ||||
| 15 Jul 2026 | Studio | 395 | 1,561 | AED 617k |
| Jun 2026 · 1 sale | ||||
| 15 Jun 2026 | Studio | 419 | 1,444 | AED 605k |
| May 2026 · 1 sale | ||||
| 4 May 2026 | 2 beds | 1,174 | 1,168 | AED 1.37M |
| Mar 2026 · 2 sales | ||||
| 12 Mar 2026 | 1 bed | 745 | 1,269 | AED 945k |
| 2 Mar 2026 | Studio | 419 | 1,458 | AED 611k |
| Feb 2026 · 1 sale | ||||
| 16 Feb 2026 | 1 bed | 743 | 1,265 | AED 940k |
| Jan 2026 · 2 sales | ||||
| 16 Jan 2026 | Studio | 419 | 1,337 | AED 560k |
| 6 Jan 2026 | Studio | 388 | 1,697 | AED 658k |
| Dec 2025 · 5 sales | ||||
| 25 Dec 2025 | 2 beds | 1,174 | 1,150 | AED 1.35M |
| 25 Dec 2025 | 1 bed | 743 | 1,211 | AED 900k |
| 25 Dec 2025 | 1 bed | 745 | 1,208 | AED 900k |
| 10 Dec 2025 | 2 beds | 1,174 | 1,167 | AED 1.37M |
| 9 Dec 2025 | Studio | 418 | 1,434 | AED 599k |
| Nov 2025 · 1 sale | ||||
| 14 Nov 2025 | 2 beds | 1,174 | 1,060 | AED 1.25M |
Homes
260 homes by size
- Studio60%156 homes · 357–536 sq ft · 11 layouts
- 1 bed30%78 homes · 743–1,293 sq ft · 6 layouts
- 2 beds10%26 homes · 1,174–1,207 sq ft · 3 layouts
Location
Drive times
- Downtown Dubai28min
- Dubai Airport (DXB)29min
- Dubai Marina38min
By car. Jumeirah Open Beach, the nearest beach, is 18.4 km away.
Rated schools
- GEMS Wellington Academy -FzeUK · Very good3.1 kmaway
Getting around
- Academic CityBlue Line · opens 20293.2 kmaway
- MeydanEtihad Rail · planned10 kmaway
- CreekGreen Line15 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB18 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%Developer
- 10 finished
- 28 being built, on time
- 3 past their planned date
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Imtiaz Real Estate Investment & Development L.L.C
Also being built by Imtiaz
| Project | Handover | Built |
|---|---|---|
| Beach Walk Residences 3 BY ImtiazDubai Islands | Q2 2026Past planned date | 100% |
| Cove Edition Residence 1 By ImtiazDubai Land Residence Complex | Q3 2026Past planned date | 90% |
| Luxur Tower By ImtiazJVC | Q4 2026Being built | 90% |
| Beach Walk Grand By ImtiazDubai Islands | Q4 2026Being built | 68% |
| Cove Edition Residence 3 By ImtiazDubai Land Residence Complex | Q4 2026Being built | 37% |
More questions about Cove Edition Residence 2 by Imtiaz
From AED 614k for a 413 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 943k and 2-bed flats sell for about AED 1.37M.
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 60% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.
260 homes on 13 floors: 156 studios of 357–536 sq ft, 78 1-bed flats of 743–1,293 sq ft and 26 2-bed flats of 1,174–1,207 sq ft.
Up 5% for 1-bed flats, per sq ft. Against the launch sales of Nov 2024 – Jan 2025: studios down 1%, 2-bed flats up 6%.
About AED 40k a year for a studio, AED 56k for a 1-bed and AED 73k for a 2-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.
Of Imtiaz’s 41 projects on DLD’s record, 10 are finished. Of the 31 being built, 3 are past their planned date.
In Dubai Land Residence Complex, 28 minutes by car to Downtown Dubai and 29 to Dubai Airport (DXB). Creek Metro station on the Green Line is 15 km away.
More nearby
Off-plan nearby
- AG Aum ResidenceFrom AED 310k2% built · Planned Q4 2028
- HavenciaFrom AED 663k0% built · Planned Q1 2028
- Veona by GuttiFrom AED 648k22% built · Planned Q4 2027
- Samana ParkvilleFrom AED 774k14% built · Planned Q3 2028
- Kensington GardensFrom AED 750k0% built · Planned Q3 2027
- Cove Grand Residence by ImtiazFrom AED 731k13% built · Planned Q4 2027
Finished buildings nearby
Typical next door AED 1,027/sq ft · 2 buildings within a 10-minute walk
