Skip to content

Veona by Gutti

Dubai Land Residence ComplexGutti

FromAED 648kStudio · 397 sq ft

Veona by Gutti is an off-plan project by Gutti in Dubai Land Residence Complex, with 88 homes on 5 floors. DLD’s last inspection, on 26 Oct 2026, found it 22% built.

Built
22%
Handover
Q4 2027
Sales in 12 months
32
Payment plan
20/20/60
Homes
88

About

Veona is a 5-floor building of 88 homes in Dubai Land Residence Complex, with shops on the ground floor. Most homes are studios, with 1-bed and 2-bed flats, Siemens kitchens and home automation, and some 2-bed flats have a terrace with a private jacuzzi. Residents share a rooftop outdoor cinema, a zen garden and a jogging track.

  • Some 2-bed flats with a jacuzzi
  • Rooftop outdoor cinema
  • Smart home controls

Shared facilities

  • Pool
  • Kids’ pool
  • Indoor and outdoor gyms
  • Outdoor yoga area
  • Jogging track
  • Zen garden
  • Clubhouse
  • BBQ lounge

Progress

22%built
  1. Q4 2025Building started
  2. Oct 2026Last inspection · 22%
  3. Q4 2027Planned handover

Prices

Price per sq ft

1,371 AED/sq ft32 sales in 12 months

Typical price by size

Studio
AED 648k397 sq ft · 1,633 AED/sq ft · 12 sales
1 bed
AED 1.06M769 sq ft · 1,322 AED/sq ft · 15 sales
2 beds
AED 1.39M1,197 sq ft · 1,180 AED/sq ft · 4 sales

Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales

  • Lowest810AED/sq ft
  • Veona by Gutti1,371AED/sq ft
  • Typical1,386AED/sq ft
  • Highest1,737AED/sq ft

34th lowest of 72 · AED per sq ft in 12 months

Latest sales

Newest first
32 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 4 sales
22 Oct 20261 bed7571,322AED 1M
21 Oct 20261 bed1,1761,063AED 1.25M
21 Oct 20262 beds1,3681,158AED 1.58M
21 Oct 20261 bed1,176935AED 1.1M
Sep 2026 · 4 sales
21 Sep 20262 beds1,2591,112AED 1.4M
21 Sep 20262 beds1,1341,202AED 1.36M
21 Sep 2026Studio4491,518AED 682k
18 Sep 20261 bed7521,463AED 1.1M
Aug 2026 · 2 sales
10 Aug 20261 bed7691,294AED 995k
5 Aug 20262 beds1,0531,311AED 1.38M
Jul 2026 · 3 sales
28 Jul 2026Studio4011,632AED 654k
28 Jul 20261 bed1,1761,020AED 1.2M
28 Jul 2026Studio3971,632AED 648k
Jun 2026 · 5 sales
25 Jun 2026Studio4011,632AED 654k
23 Jun 20261 bed7691,378AED 1.06M
23 Jun 20261 bed7671,381AED 1.06M
10 Jun 2026Studio3971,632AED 648k
8 Jun 20261 bed1,176982AED 1.16M
May 2026 · 4 sales
18 May 2026Studio4011,632AED 654k
18 May 20261 bed7691,309AED 1.01M
15 May 20261 bed7521,350AED 1.02M
15 May 2026Studio3971,631AED 648k
Apr 2026 · 1 sale
13 Apr 2026Studio3961,616AED 640k
Mar 2026 · 9 sales
26 Mar 20261 bed7691,282AED 986k
25 Mar 2026Studio3971,632AED 648k
16 Mar 20261 bed7521,364AED 1.03M
12 Mar 20261 bed7521,364AED 1.03M
12 Mar 2026Studio3971,632AED 648k
11 Mar 2026Studio3971,600AED 635k
11 Mar 20261 bed8281,336AED 1.11M
10 Mar 2026Studio3971,632AED 648k
10 Mar 2026Studio4011,616AED 648k

Homes

88 homes by size

  • Studio55%48 homes · 397–487 sq ft · 7 layouts
  • 1 bed31%27 homes · 752–1,230 sq ft · 6 layouts
  • 2 beds15%13 homes · 1,053–2,172 sq ft · 6 layouts
  1. 20%On booking
  2. 20%During construction
  3. 60%On handover

Payments go to the project’s escrow account at Mashreq Bank.

Location

Drive times

  • Downtown Dubai28min
  • Dubai Airport (DXB)29min
  • Dubai Marina38min

By car. Jumeirah Open Beach, the nearest beach, is 18.5 km away.

Rated schools

  • GEMS Wellington Academy -FzeUK · Very good3.0 kmaway

Getting around

  • Academic CityBlue Line · opens 20293.0 kmaway
  • MeydanEtihad Rail · planned10 kmaway
  • CreekGreen Line14 kmaway
  • Al JaddafHigh-speed rail · planned15 kmaway
  • Dubai InternationalDXB18 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%

Developer

  • 1 being built, on time
Escrow bank
Mashreq Bank
Legal name
Gutti Real Estate Development L.L.C
Questions

More questions about Veona by Gutti

From AED 648k for a 397 sq ft studio, the lowest typical price paid in the 12 months. 1-bed flats sell for about AED 1.06M and 2-bed flats sell for about AED 1.39M.

20/20/60: 20% on booking, 20% during construction, 60% on handover. Payments go to the project’s escrow account at Mashreq Bank.

Q4 2027, the planned date in DLD’s register.

It is not past its planned date. It was 22% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 13 months.

88 homes on 5 floors: 48 studios of 397–487 sq ft, 27 1-bed flats of 752–1,230 sq ft and 13 2-bed flats of 1,053–2,172 sq ft.

About AED 40k a year for a studio, AED 56k for a 1-bed and AED 73k for a 2-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.

Of Gutti’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.

In Dubai Land Residence Complex, 28 minutes by car to Downtown Dubai and 29 to Dubai Airport (DXB). Creek Metro station on the Green Line is 14 km away.

More nearby

How the numbers work

FromAED 648kSee it on the map