Skip to content

Cove Edition Residence 3 by Imtiaz

Dubai Land Residence ComplexImtiaz

FromAED 652kStudio · 417 sq ft

Cove Edition Residence 3 by Imtiaz is an off-plan project by Imtiaz in Dubai Land Residence Complex, with 260 homes on 13 floors. DLD’s last inspection, on 26 Oct 2026, found it 37% built.

Built
37%
Handover
Q4 2026
Since launch
No changeStudio price per sq ft
Homes
260

Progress

37%built
  1. Q4 2024Building started
  2. Feb–Apr 2025Launch sales · 187
  3. Oct 2026Last inspection · 37%
  4. Q4 2026Planned handover

Prices

Price per sq ft

1,501 AED/sq ft10 sales in 12 months

Typical price by size

Studio
AED 652k417 sq ft · 1,558 AED/sq ft · 6 sales
1 bed
Not enough sales2 sales
2 beds
Not enough sales2 sales

Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales

  • Lowest810AED/sq ft
  • Typical1,386AED/sq ft
  • Cove Edition Residence 3 by Imtiaz1,501AED/sq ft
  • Highest1,737AED/sq ft

25th highest of 72 · AED per sq ft in 12 months

Latest sales

Newest first
10 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 1 sale
8 Oct 20261 bed8181,235AED 1.01M
Sep 2026 · 2 sales
18 Sep 2026Studio4181,567AED 655k
8 Sep 20261 bed8421,010AED 850k
Jun 2026 · 1 sale
4 Jun 20262 beds1,3271,112AED 1.48M
May 2026 · 1 sale
11 May 2026Studio4201,546AED 649k
Jan 2026 · 2 sales
29 Jan 2026Studio4151,545AED 641k
13 Jan 2026Studio4211,641AED 691k
Nov 2025 · 3 sales
24 Nov 2025Studio4161,596AED 664k
17 Nov 20252 beds1,3271,124AED 1.49M
6 Nov 2025Studio4151,457AED 605k

Homes

260 homes by size

  • Studio65%169 homes · 383–433 sq ft · 9 layouts
  • 1 bed30%78 homes · 651–1,144 sq ft · 10 layouts
  • 2 beds5%13 homes · 1,327–1,506 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai27min
  • Dubai Airport (DXB)27min
  • Dubai Marina35min

By car. Jumeirah Open Beach, the nearest beach, is 17.9 km away.

Rated schools

  • GEMS Wellington Academy -FzeUK · Very good2.5 kmaway

Getting around

  • Dubai Silicon OasisBlue Line · opens 20292.8 kmaway
  • MeydanEtihad Rail · planned9.7 kmaway
  • CreekGreen Line14 kmaway
  • Al JaddafHigh-speed rail · planned15 kmaway
  • Dubai InternationalDXB17 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%

Developer

  • 10 finished
  • 28 being built, on time
  • 3 past their planned date
Escrow bank
First Abu Dhabi Bank
Legal name
Imtiaz Real Estate Investment & Development L.L.C

Also being built by Imtiaz

Imtiaz’s other projects
ProjectHandoverBuilt
Beach Walk Residences 3 BY ImtiazDubai IslandsQ2 2026Past planned date100%
Cove Edition Residence 1 By ImtiazDubai Land Residence ComplexQ3 2026Past planned date90%
Cove Edition Residence 2 By ImtiazDubai Land Residence ComplexQ4 2026Past planned date60%
Luxur Tower By ImtiazJVCQ4 2026Being built90%
Beach Walk Grand By ImtiazDubai IslandsQ4 2026Being built68%
All 41 Imtiaz projects
Questions

More questions about Cove Edition Residence 3 by Imtiaz

From AED 652k for a 417 sq ft studio, the lowest typical price paid in the 12 months.

Q4 2026, the planned date in DLD’s register.

It is not past its planned date. It was 37% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.

260 homes on 13 floors: 169 studios of 383–433 sq ft, 78 1-bed flats of 651–1,144 sq ft and 13 2-bed flats of 1,327–1,506 sq ft.

0% for studios, per sq ft.

About AED 40k a year for a studio, AED 56k for a 1-bed and AED 73k for a 2-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.

Of Imtiaz’s 41 projects on DLD’s record, 10 are finished. Of the 31 being built, 3 are past their planned date.

In Dubai Land Residence Complex, 27 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 14 km away.

More nearby

How the numbers work

FromAED 652kSee it on the map