Cove Edition Residence 3 by Imtiaz
Dubai Land Residence ComplexImtiaz
Cove Edition Residence 3 by Imtiaz is an off-plan project by Imtiaz in Dubai Land Residence Complex, with 260 homes on 13 floors. DLD’s last inspection, on 26 Oct 2026, found it 37% built.
- Built
- 37%
- Handover
- Q4 2026
- Since launch
- No changeStudio price per sq ft
- Homes
- 260
Progress
- Q4 2024Building started
- Feb–Apr 2025Launch sales · 187
- Oct 2026Last inspection · 37%
- Q4 2026Planned handover
Prices
Price per sq ft
Typical price by size
- Studio
- AED 652k417 sq ft · 1,558 AED/sq ft · 6 sales
- 1 bed
- Not enough sales2 sales
- 2 beds
- Not enough sales2 sales
Against 72 Dubai Land Residence Complex off-plan projects with 10 or more sales
- Lowest810AED/sq ft
- Typical1,386AED/sq ft
- Cove Edition Residence 3 by Imtiaz1,501AED/sq ft
- Highest1,737AED/sq ft
25th highest of 72 · AED per sq ft in 12 months
Latest sales
Newest first| Date | Size | Sq ft | AED/sq ft | Price |
|---|---|---|---|---|
| Oct 2026 · 1 sale | ||||
| 8 Oct 2026 | 1 bed | 818 | 1,235 | AED 1.01M |
| Sep 2026 · 2 sales | ||||
| 18 Sep 2026 | Studio | 418 | 1,567 | AED 655k |
| 8 Sep 2026 | 1 bed | 842 | 1,010 | AED 850k |
| Jun 2026 · 1 sale | ||||
| 4 Jun 2026 | 2 beds | 1,327 | 1,112 | AED 1.48M |
| May 2026 · 1 sale | ||||
| 11 May 2026 | Studio | 420 | 1,546 | AED 649k |
| Jan 2026 · 2 sales | ||||
| 29 Jan 2026 | Studio | 415 | 1,545 | AED 641k |
| 13 Jan 2026 | Studio | 421 | 1,641 | AED 691k |
| Nov 2025 · 3 sales | ||||
| 24 Nov 2025 | Studio | 416 | 1,596 | AED 664k |
| 17 Nov 2025 | 2 beds | 1,327 | 1,124 | AED 1.49M |
| 6 Nov 2025 | Studio | 415 | 1,457 | AED 605k |
Homes
260 homes by size
- Studio65%169 homes · 383–433 sq ft · 9 layouts
- 1 bed30%78 homes · 651–1,144 sq ft · 10 layouts
- 2 beds5%13 homes · 1,327–1,506 sq ft · 2 layouts
Location
Drive times
- Downtown Dubai27min
- Dubai Airport (DXB)27min
- Dubai Marina35min
By car. Jumeirah Open Beach, the nearest beach, is 17.9 km away.
Rated schools
- GEMS Wellington Academy -FzeUK · Very good2.5 kmaway
Getting around
- Dubai Silicon OasisBlue Line · opens 20292.8 kmaway
- MeydanEtihad Rail · planned9.7 kmaway
- CreekGreen Line14 kmaway
- Al JaddafHigh-speed rail · planned15 kmaway
- Dubai InternationalDXB17 kmaway
Area guideDubai Land Residence ComplexFinished homesAED 841/sq ft1-bed rentAED 56k/yrGross yieldEstimate8.4%Developer
- 10 finished
- 28 being built, on time
- 3 past their planned date
- Escrow bank
- First Abu Dhabi Bank
- Legal name
- Imtiaz Real Estate Investment & Development L.L.C
Also being built by Imtiaz
| Project | Handover | Built |
|---|---|---|
| Beach Walk Residences 3 BY ImtiazDubai Islands | Q2 2026Past planned date | 100% |
| Cove Edition Residence 1 By ImtiazDubai Land Residence Complex | Q3 2026Past planned date | 90% |
| Cove Edition Residence 2 By ImtiazDubai Land Residence Complex | Q4 2026Past planned date | 60% |
| Luxur Tower By ImtiazJVC | Q4 2026Being built | 90% |
| Beach Walk Grand By ImtiazDubai Islands | Q4 2026Being built | 68% |
More questions about Cove Edition Residence 3 by Imtiaz
From AED 652k for a 417 sq ft studio, the lowest typical price paid in the 12 months.
Q4 2026, the planned date in DLD’s register.
It is not past its planned date. It was 37% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 1 month.
260 homes on 13 floors: 169 studios of 383–433 sq ft, 78 1-bed flats of 651–1,144 sq ft and 13 2-bed flats of 1,327–1,506 sq ft.
0% for studios, per sq ft.
About AED 40k a year for a studio, AED 56k for a 1-bed and AED 73k for a 2-bed in Dubai Land Residence Complex, a gross yield of about 8.4% Estimate.
Of Imtiaz’s 41 projects on DLD’s record, 10 are finished. Of the 31 being built, 3 are past their planned date.
In Dubai Land Residence Complex, 27 minutes by car to Downtown Dubai and 27 to Dubai Airport (DXB). Creek Metro station on the Green Line is 14 km away.
More nearby
Off-plan nearby
- Floarea OasisFrom AED 694k13% built · Planned Q4 2028
- Empire GardensFrom AED 825k0% built · Planned Q4 2028
- Celesto Tower 2From AED 560k0% built · Planned Q2 2028
- The Archive by ImtiazNo sales3% built · Planned Q2 2027
- Celesto tower 4No sales0% built · Planned Q4 2028
- Marquis VistaFrom AED 764k3% built · Planned Q4 2027
Finished buildings nearby
Typical next door AED 817/sq ft · 9 buildings within a 10-minute walk
- Ajmal Sarah754AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Blue Wave953AED/sq ft1-bed rent AED 60k/yr · 10-minute walk
- Qpoint Liwan-Plot R070817AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Qpoint Liwan-Plot R069659AED/sq ft1-bed rent AED 49k/yr · 10-minute walk
- Qpoint Liwan-Plot R068630AED/sq ft1-bed rent AED 50k/yr · 10-minute walk
- Qpoint Liwan-Plot R072718AED/sq ft1-bed rent AED 54k/yr · 10-minute walk
- Phoenix Tower831AED/sq ftNot enough rents · 10-minute walk
- Celine by Vision1,226AED/sq ft1-bed rent AED 70k/yr · 10-minute walk
- Time 11,222AED/sq ft1-bed rent AED 55k/yr · 10-minute walk
- Sky Courts724AED/sq ft1-bed rent AED 50k/yr
- The V Tower1,012AED/sq ft1-bed rent AED 60k/yr
- Desert Sun Tower827AED/sq ft1-bed rent AED 57k/yr
- Durar 1945AED/sq ft1-bed rent AED 57k/yr
