Crystal Tower

International City Phase 1VHS

FromAED 655k1 bed · 546 sq ft

Crystal Tower is an off-plan project by VHS in International City Phase 1, with 102 homes on 7 floors. DLD’s last inspection, on 26 Oct 2026, found it 0% built.

Built
0%
Handover
Q4 2028
Sales in 12 months
24
Homes
102

Progress

0%built
  1. Q1 2026Building started
  2. Oct 2026Last inspection · 0%
  3. Q4 2028Planned handover

Prices

Price per sq ft

1,199 AED/sq ft24 sales in 12 months

Typical price by size

1 bed
AED 655k546 sq ft · 1,200 AED/sq ft · 21 sales
2 beds
AED 1.11M1,025 sq ft · 1,080 AED/sq ft · 3 sales

Against 5 International City Phase 1 off-plan projects with 10 or more sales

  • Lowest1,072AED/sq ft
  • Crystal Tower1,199AED/sq ft
  • Typical1,234AED/sq ft
  • Highest1,367AED/sq ft

2nd lowest of 5 · AED per sq ft in 12 months

Latest sales

Newest first
24 off-plan sales · Nov 2025 – Oct 2026 · newest first
DateSizeSq ftAED/sq ftPrice
Oct 2026 · 1 sale
27 Oct 20261 bed5151,199AED 617k
Sep 2026 · 1 sale
24 Sep 20262 beds1,0301,080AED 1.11M
Aug 2026 · 5 sales
31 Aug 20261 bed6561,221AED 801k
27 Aug 20261 bed5171,199AED 620k
21 Aug 20262 beds1,0251,211AED 1.24M
3 Aug 20261 bed5461,346AED 735k
3 Aug 20261 bed5461,199AED 655k
Jul 2026 · 5 sales
14 Jul 20261 bed5461,279AED 698k
14 Jul 20261 bed5171,199AED 620k
14 Jul 20261 bed6891,200AED 827k
14 Jul 20261 bed5461,196AED 653k
14 Jul 20261 bed6891,200AED 827k
Jun 2026 · 5 sales
12 Jun 20261 bed6891,200AED 827k
12 Jun 20261 bed5171,199AED 620k
10 Jun 20261 bed5171,199AED 620k
10 Jun 20262 beds1,0251,080AED 1.11M
10 Jun 20261 bed6891,200AED 827k
May 2026 · 1 sale
12 May 20261 bed5171,199AED 620k
Apr 2026 · 3 sales
6 Apr 20261 bed6891,200AED 827k
6 Apr 20261 bed5151,307AED 673k
6 Apr 20261 bed5461,196AED 653k
Mar 2026 · 3 sales
27 Mar 20261 bed6561,200AED 787k
27 Mar 20261 bed5461,199AED 655k
27 Mar 20261 bed5151,199AED 618k

Homes

102 homes by size

  • Studio14%14 homes · 548–566 sq ft · 2 layouts
  • 1 bed77%79 homes · 515–877 sq ft · 9 layouts
  • 2 beds7%7 homes · 1,025 sq ft · 1 layout
  • 3 beds2%2 homes · 2,325–2,847 sq ft · 2 layouts

Location

Drive times

  • Downtown Dubai24min
  • Dubai Airport (DXB)23min
  • Dubai Marina37min

By car. La Mer Beach, the nearest beach, is 15.7 km away.

Rated schools

  • Sharjah American International Private School - DubaiAmerican · Good1.0 kmaway
  • Primus Private SchoolIndian · Good1.1 kmaway

Getting around

  • Dragon MartBlue Line · opens 202914 minwalk
  • CentrepointRed Line6.0 kmaway
  • Al JaddafHigh-speed rail · planned8.7 kmaway
  • Dubai InternationalDXB9.2 kmaway
  • MeydanEtihad Rail · planned10 kmaway
Area guideInternational City Phase 1Finished homesAED 658/sq ft1-bed rentAED 43k/yrGross yieldEstimate9.5%

Developer

VHS

  • 1 being built, on time
Escrow bank
Not on record
Legal name
V H S Real Estate Developments L.L.C
Questions

More questions about Crystal Tower

From AED 655k for a 546 sq ft 1-bed, the lowest typical price paid in the 12 months. 2-bed flats sell for about AED 1.11M.

Q4 2028, the planned date in DLD’s register.

It is not past its planned date. It was 0% built at DLD’s last inspection on 26 Oct 2026, with handover planned in 2 years.

102 homes on 7 floors: 14 studios of 548–566 sq ft, 79 1-bed flats of 515–877 sq ft, 7 2-bed flats of 1,025 sq ft and 2 3-bed flats of 2,325–2,847 sq ft.

About AED 32k a year for a studio, AED 43k for a 1-bed, AED 60k for a 2-bed and AED 105k for a 3-bed in International City Phase 1, a gross yield of about 9.5% Estimate.

Of VHS’s 1 projects on DLD’s record, 0 are finished. Of the 1 being built, none is past its planned date.